7180788456

7180788456



WE HAVE RIGHT SOLUTIONS



CONVERSION FROM 20 TO 3D 1-

•    Transfering 2D drawings to 3D models on every level od detail

•    Converting architectural, structural, MEP drawings and other CAD drawings

•    Various model formats for platforms such as Revit, ArchiCAD or Tekla

MPLEMENTATION

• World dass IT systems fully supporting BIM processes, optimizing and improving project management

5D: COST ESTIMATION #-• Bill of guantities directly from 3D model

-m CLASH DETECTION

•    Specifying possible clashes in models/projects. Thus, they can be avoided before they occur on the construction site

•    Creating ready-to-use integration and coordination processes for all 3D model sets

INTEGRATION AND COORDINATION

•    Integration of processes, contract management, documenatation and cooperation

•    lntuitive,cloud based system

•    Micro and macro planning

-# 4D: PLANNING AND CONTROLLING

• Increasing project effectiveness thanks to integrated visualization process

• Integrating Schedule with quantity and cost data (estimation,

contracting, budgeting and execution)    • Usin9 lo9ial ^ence of connections of 3D elements and the

schedule


• Defining the order of activities and assigning human, materiał and equipemnt resources by using productivity indexes and crew sizes

1

Cooperation of estimates, design and ordering starting from the project tender phase until its finish



Wyszukiwarka

Podobne podstrony:
Monthly Temperaturę (T2m) Anomalies valid for week: from 20 to 26 July 2020 Map processed by EFFIS S
GERMAIMY S PANTHER TANK "Sgt Ameth Anderson, Tank Commander “In our tanks we have not the ar mo
Great events are taking place. We have no navy and no ambassadors but we have opinion. It is essenti
APC 13 08 25 40 6 3d We use the past perfect continuous: a) to put emphasis on the duration&nbs
APC 13 09 07 32 1 3d Notę: We use who, which or that to put emphasis on the subject.
37691698462801259311260036 n We love Him because He first loved us 1 John 4:19SHABBAT SHALOM And we
Basic TechniąuesKnit Increase Without Twisting 2 stitches from front to back. and... On both sides o
town. We are inviting people from the community toour exhibit. Our parents are invited to go with us
EXIT TEST 1 10 cz 4 EX!T TEST (Module* 1-10) 70 To protect.......from the heat we have to wear spe
aftai 9 We survived the fissure. Nom we have to snrvive morę poor draftsmanship from Mnich.
APC 13 08 25 33 3 3d We use be going to: a) for plans, intentions or ambitions we have for
APC 13 08 25 36 4 3d b) for actions we have already decided to do in the near futurę. They
APC 13 09 04 15 5 3d ♦ have to = it is necessary to do sth e.g. We have to be at the airport at
APC 13 09 07 33 1 3d make for: (tr) move in the direction of We have to make for the rtort
APC 13 09 07 33 2 3d make for: (tr) move in the direction of We have to make for the north

więcej podobnych podstron