background image

Hydrostatics

Trim: 0,000 (m)

Draught

Volume

Displ.

Displ.

LCB

(m)

(m

3

)

(tonnes)

(tonnes)

(m)

0,000

0,000

0,000

0,000

0,000

0,100

0,123

0,123

0,123

3,604

0,200

0,539

0,539

0,539

3,616

0,300

1,244

1,244

1,244

3,618

0,400

2,188

2,188

2,188

3,616

0,500

3,311

3,311

3,311

3,610

0,600

4,567

4,567

4,567

3,602

0,700

5,927

5,927

5,927

3,593

0,800

7,369

7,369

7,369

3,584

0,900

8,880

8,880

8,880

3,576

1,000

10,448

10,448

10,448

3,569

NOTE 1: Draught (and all other vertical heights) is measured above base Z=0,000

NOTE 2: All calculated coefficients based on project length, draught and beam.

Nomenclature

Draught

Moulded draught, measured from baseline

Volume

Total displaced volume

Displ.

Displacement

Displ.

Displacement

LCB

Longitudinal center of buoyancy, measured from the aft perpendicular at X=0.0

Hydrostatics report

2014-05-29

1