P000718 A Eng Vertical shaft assembly

background image

D

Vertical shaft assembly

REV

MAMA

2007-01-25

APP

B

A

A2

General tolerance

ISO 2768-mL
EN ISO 13920-BF

SP 20

Weight (kg)

600

Date

Drawn

Check. Appr.

NB
Yard

Project

Product
Mark, Size, Type

Original reference

Old

New

Item code

Drawing No.

RAVU

REVISION NOTE

Sheet

P000718

The information contained in this document is the sole

A

REV DATE

part or whole without written permission is prohiblited.

C

D

Upper assembly

2

3

5

4

6

7

8

7

6

4

5

3

2

1

E

F

G

H

J

K

K

J

H

G

F

E

A

Rev.

S P - A 2 P

Scale

1

B

CREATOR

Eng

004101

W0064-89

C

Lang.

1/1

property of Steerprop Ltd. any reproduction or disclosure in

Pl

ot

d

at

e:

26.

1.

2007

1:5

MAMA

ITEM

CODE

VER DESCRIPTION

TECHNICAL DATA

DRAWING

REV

QTY

LENGTH WIDTH

1

003866 0

Shaft

Vertical shaft assembly

M003735 A

1

2

003727 0

Crown wheel

Vertical shaft assembly

M003535 A

1

3

003870 0

Bearing housing

Vertical shaft assembly

M003741 A

1

4

002351 0

Gear coupling hub

HKSP 20

1

5

002417 0

Mounting flange

Vertical shaft assembly

M001768 A

1

6

001933 1

Tapered roller bearing

FAG 32236A / SKF 32236J2

1

7

002373 1

Tapered roller bearing

FAG 31326X / SKF 31326XJ2

1

8

001936 0

Locknut

KMT 26

1

9

001733 0

Plug

DIN 906 - R3/8 -St

1

10

002071 0

Hexagon socket head screw

DIN 912 - M16x50 - 8.8 Zn

6

3 bore before mounting

206 Nm

1

2

10

3

5

4

7

8

6

9

- Max. axial runout of the wheel back face nearest to outer edge

- Bearing max. temperature 120

is 0,03 mm (measured when the wheel has cooled down)

- Wheel max. temperature 180

Locking of screws according to instruction M000416.

C

- If necessary, to be adjusted by pumping oil to the joint

- Temperature difference when assembled 80 . . . 100

C

C

C

Bearing installation to shaft:

Wheel (item 2) installation to shaft:

- Temperature difference when assembled 125

Adjustment of pre-tensioning of tapered roller bearings (items 6 and 7):

- Pre-tensioning is adjusted by pumping oil to bearing (item 7) inner ring

joint to release it and tightening the locknut (item 8) to 148 Nm torque.

- Bearings must be rotated at least 15 turns to both directions

during adjustment for correct positioning of rollers.

- NOTE. Pre-tensioned bearings are loaded during adjustment and

there after, so bearings must be lubricated.

Gear coupling hub (item 4) joint

pull-up 5,2 ... 5,4 mm.


Wyszukiwarka

Podobne podstrony:
M001809 A Eng Vertical shaft assembly
M001807 B Eng Propeller shaft assembly
M003913 A Eng Pinion shaft assembly
M001872 B Eng Propeller shaft assembly
P000716 A Eng Pinion assembly
M001840 B Eng Oil tank assembly
P000726 A Eng Stem tube assembly
Assembler ENG
M001882 B Eng Lower assembly
P000724 A Eng Lower assembly