EC08 FPC NTISR Strike TIG Outbrief (9May08)

background image

------------------------------
THIS DOCUMENT COULD CONTAIN TECHNICAL DATA, THE EXPORT OF
WHICH IS RESTRICTED BY THE U.S. ARMS EXPORT CONTROL ACT (AECA)
(TITLE 22, U.S.C.SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT
OF 1979, AS AMENDED(TITLE 50, U.S.C., APP.2401, ET SEQ.). TECHNICAL
DATA AUTHORIZED FOR EXPORT MAY NOT BE REEXPORTED,
TRANSFERRED, OR DIVERTED FROM THE COUNTRY OF ULTIMATEEND-USE
OR FROM THE AUTHORIZED FOREIGN END-USER OR DISCLOSED TO A
NATIONAL OF ANOTHER COUNTRY WITHOUT THE PRIOR WRITTEN
APPROVAL OF THE OFFICEOF DEFENSE TRADE CONTROLS. TECHNICAL
DATA CONTAINED IN THIS DOCUMENT HAS BEEN AUTHORIZED FOR EXPORT
FROM THE UNITED STATES TO FOUR-EYES ALLIED PARTNERS, NATIONALS
OF AUSTRALIA, CANADA, AND THE UNITED KINGDOM BY THE OFFICE OF
DEFENSE TRADE CONTROLS,INSOFAR AS INDIVIDUAL NATIONALITY IS NOT
DIVERSE FROM HIS OR HER EMPLOYING AGENCY.
-------------------------------

background image

Know the Earth…Show the Way

UNCLASSIFIED

UNCLASSIFIED

Empire Challenge 2008
NTISR/Strike TIG

Empire Challenge 2008
NTISR/Strike TIG

09 May 2008

09 May 2008

NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY

NTISR/Strike TIG Lead

background image

EMPIRE CHALLENGE 2008

Prudentia Per Proelium…Wisdom In Battle

UNCLASSIFIED

UNCLASSIFIED

NTISR/Stike TIG FPC Actions (1 of 2)

• Initiative IATT/IATO/ATO status

• Systems report that they are on track and will comply with

requirements to connect to networks

• OV chart review

• Minor changes identified

• High Level COP topology chart updated
• Network Connectivity charts

• Initiatives accounted for
• Understanding of required connections

• Participated in Architecture Working Group SV-4 work
• Participated in Persistent ISR, ISR Management, NTISR

review of MDA Scenario

• Identified Message Types that will be used by the initiatives

background image

EMPIRE CHALLENGE 2008

Prudentia Per Proelium…Wisdom In Battle

UNCLASSIFIED

UNCLASSIFIED

NTISR/Stike TIG FPC Actions (2 of 2)

• Reviewed Scenarios and MSELs with Rodney Brickell
• Risks identified with mitigation options

– C2 flow for Dynamic ISR

• Continue to work with ISR Management TIG

– JREAP C interoperability between JRE and JXF

• Need to test during Spiral 3

– CFE Connectivity at Nellis AFB

• LOS/BLOS testing done in Air if required

– Identification of 2 Personnel for Air Boss Position

• UK working to identify person
• Will contact NSAWC for availability for second person

– Identify EC08 procedures for collecting and sending ATO inputs

• Work with CAOC-X Personnel and TIG leads to account for all

initiatives

background image

EMPIRE CHALLENGE 2008

Prudentia Per Proelium…Wisdom In Battle

UNCLASSIFIED

UNCLASSIFIED

NTISR/Strike TIG Way Ahead

• Script Expected Blue Force Actions during NTISR Threads
• Continue architecture development with AWG
• Test COP and C2 Architecture (Spiral 3)
• Review and Confirm OPTASK Link
• Finalize Blue C2 schema and develop JADOCS Mission

Managers

• Create Training for NTISR participants


Wyszukiwarka

Podobne podstrony:
EC08 FPC NTISR Strike TIG Outbrief (9May08)
EC08 FPC NTISR Strike TIG Outbrief (9May08)
EC08 FPC Intel Scenario WG Outbrief (9May08)
EC08 FPC Intel Scenario WG Outbrief (9May08)
EC08 FPC Joint ISR Mgmt TIG Outbrief (9May08)
EC08 FPC Joint ISR Mgmt TIG Outbrief (9May08)
EC08 FPC PS TIG FPC Outbrief (9May08)
EC08 FPC PS TIG FPC Outbrief (9May08)
EC08 FPC PS TIG FPC Outbrief (9May08)
EC08 FPC UK Outbrief (9May08)
EC08 FPC Operations WG Outbrief (9May08)
EC08 FPC Coalition SWG Outbrief (9May08)
EC08 FPC Security WG Outbrief (9May08)
EC08 FPC MDA TIG Overview FPC Outbrief (9 May 08)
EC08 FPC Architecture WG Outbrief (9May08)
EC08 FPC Networking WG Outbrief (9May08)
EC08 FPC COMMS WG Outbrief (9May08)
EC08 FPC DIB WG Outbrief (9May08)
EC08 FPC Architecture WG Outbrief (9May08)

więcej podobnych podstron