background image

C S C   T C

Halley Smart Phone On site 

Training

CSC TC  Lecturer Leo 

background image

C S C   T C

2

2

Agenda

• Lecturer background
• Product Training Subject
• Training Schedule
• Lecture Background
• Product Specification & Profile Overview
• Repair Definition
• Repair General Repair Flow
• Escalation Window
• Q  &  A

background image

C S C   T C

3

3

Product Training Subject

™

™

Session 1:  Leo Su

Session 1:  Leo Su

™

™

RMA process Introduction

RMA process Introduction

™

™

Firmware/ Software update training

Firmware/ Software update training

™

™

Assembly/Disassembly

Assembly/Disassembly

™

™

Base Band  trouble shooting

Base Band  trouble shooting

™

™

Session 2: 

Session 2: 

Y. C. Cheng

Y. C. Cheng

™

™

Level 4 RF calibration & Level 4 Pre

Level 4 RF calibration & Level 4 Pre

-

-

Test 

Test 

™

™

Debug Tool  & Un

Debug Tool  & Un

-

-

Locking 

Locking 

™

™

Session 3: 

Session 3: 

Lance Yang

Lance Yang

™

™

Block diagram

Block diagram

™

™

RF Measure flow

RF Measure flow

™

™

RF Repair & Trouble shooting

RF Repair & Trouble shooting

Adobe Acrobat 7.0 

Document

Adobe Acrobat 7.0 

Document

Adobe Acrobat 7.0 

Document

Microsoft 

PowerPoint 簡報

Adobe Acrobat 7.0 

Document

background image

C S C   T C

4

4

Training Schedule

Trainer

Subject

Time

Training Visit

09:00~10:00

Software Environment setting & installation

Technical Informations Interactive

10:00~11:30

12:00~13:00

Halley Tringing Introduction

13:00~14:30

Halley Level 1 Repair Firmware Update

14:30~16:00

Halley Level 2 Repair - Disassembly/assembly

16:00~17:10

Halley BaseBand Level 3 

17:10~17:20

ALL

Q&A

17:30~18:00

Trainer

Subject

Time

RD ATS Y.C.

Halley Calibration Tool introduction

09:00~10:30

RD ATS Y.C.

Halley Pre Test Tool introduciton

10:00~11:30

RD ATS Y.C.

Halley Un-lock tool introduction

11:30~12:00

12:00~13:00

RD RF Lance

Halley RF Block introduction

13:00~14:30

RD RF Lance

Halley RF  debug flow 

14:30~16:00

RD RF Lance

Halley RF Repair & trouble shooting

16:00~17:10

17:10~17:20

GTC Leo Su

Custmer service surrvey   Q&A

17:30~18:00

Break time

GTC Leo Su

GTC Leo Su

Lunch time

Lunch time

Break time

background image

C S C   T C

5

5

Lecturer background

CSC TC       Leo

™

Repair Engineer for Mobile phone

™

Repair Training Agent 

RD RF         Lance

™

Wireless Communication RF Design Engineer & 
Debug

™

Schematic Debug & Certificate 

RD ATS       Y.C

™

Auto Test Software Engineer & Debug

™

Production Technical Support & Trouble shooting 

JPEG Image

background image

C S C   T C

6

6

Product Overview

background image

C S C   T C

7

7

Repair Level Definition

Level 

Definition.

Example

Level 0

Accessories exchanging, cosmetic parts 

replacements without additional tools.

Accessory items, and battery. cosmetic parts 

replacements without additional tools.

Level 2.5

Connectors/Components replacement on PCB by 
easy soldering

Speaker, receiver, microphone, 

vibrator, connectors.

1. Basic troubleshooting, Technical Support 

hotline. 

2. Debug without disassemble the unit.

1. Key parts & Module Replacement 

(LCD Panel, Mechanism parts, Battery, etc.). S/W 

update.

2. Disassemble and repair with screwdriver.

Replace components on PCB by easy soldering and 
circuit diagram.

1. The replacement of FLASH, CPU, DSP and BGA.

2. MB repair with calibration.

Firmware upgrade, MMI test, prescreening, 

DOA, handling.

Housing, Keypad, Lens, Antenna, 

Speaker, receiver, Microphone, 

Vibrator, Loud Speaker, Side key, 

CMOS sensor, Metal Dome,

LCD Module, LCD LCM board, 

R/C components, components replacement 
without BGA and calibration related.

Flash, BGA, BB IC, Oscillator, repair with 
calibration.

Level 1

Level 2

Level 3

Level 4

background image

C S C   T C

8

8

Halley General Repair Flow

Check Phone Status
Firmware Update
Clean Boot
Check IMEI Code
MMI Testing
Power OFF ( Until to Back Light OFF)
GSM Calibration
W-CDMA Calibration
GSM Pre-Test
W-CDMA Pre-test
Clean Boot
Report & Packing

Microsoft 

PowerPoint 簡報

background image

C S C   T C

9

9

Escalation Window:

¾

Customer Service Manager     Project window  

‰

Sebastian Wang  sebastian_wang@asus.com.tw Leader

‰

Jimmy Pan  

jimmy_pan@asus.com.tw

Global site

‰

David Kubny 

david_kubny@asus.com.tw

Europe site

¾

Technical Support Department               L1 L2 

‰

Jonathan Wu

Janathan_wu@asus.com.tw

¾

Technical Center   

L2.5 L3  L4

‰

Leo Su          

Leo_su@asus.com.tw

‰

Jack Huang   

Jack_Huang@huang.com.tw

¾

SA  sale assistant                            Order book 

‰

Lillian Wang  

lillian_wang@asustek.com.cn

background image

C S C   T C

Q & A


Document Outline