B3E011014420W02


ïż






OIL CONTROL VALVE (OCV) INSPECTION [Z6]




OIL CONTROL VALVE (OCV) INSPECTION [Z6]




B3E011014420W02



Coil resistance inspection



1. Remove the battery cover.



2. Disconnect the negative battery cable.



3. Disconnect the OCV connector.



4. Measure the coil resistance between terminals A and B using a tester.






• If not within the specification, replace the OCV.



Standard



6.9-7.9 ohms [20°C {68°F}]



5. Connect the OCV connector.



Spool Valve Operation Inspection



1. Remove the battery cover.



2. Disconnect the negative battery cable.



3. Remove the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [Z6].)



4. Verify that the spool valve inside the OCV is at the maximum valve timing retard position as shown in the figure.






• If it cannot be verified, replace the OCV.



5. Verify that the battery is fully charged.



6. Apply battery positive voltage between oil control valve terminals A and B, and verify that the spool valve operates and moves to the maximum valve timing advance position.






• If there is any malfunction, replace the OCV.



Note



• When applying battery positive voltage between the oil control valve terminals, the connection of the negative and positive cable can be either the A or B terminal.



7. Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing retard position.






• If it cannot be verified, replace the OCV.



8. Install the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [Z6].)









Wyszukiwarka

Podobne podstrony:
B3E011318740T03
B3E011101008T04
B3E011001001W03
B3E011010100E04
B3E011014420E02
B3E011012111T02
B3E011300113T18
B3E011201008T11
B3E011701008T01
B3E011601007T05
B3E011215200W01
B3E011002000W02
B3E011010300E03
B3E011613970T01
B3E011011211201
B3E011341600W02
B3E011215001W02
B3E011801009W05
B3E011801009W01

więcej podobnych podstron