OIL CONTROL VALVE (OCV) INSPECTION [Z6]
OIL CONTROL VALVE (OCV) INSPECTION [Z6]
B3E011014420W02
Coil resistance inspection
1. Remove the battery cover.
2. Disconnect the negative battery cable.
3. Disconnect the OCV connector.
4. Measure the coil resistance between terminals A and B using a tester.
• If not within the specification, replace the OCV.
Standard
6.9-7.9 ohms [20°C {68°F}]
5. Connect the OCV connector.
Spool Valve Operation Inspection
1. Remove the battery cover.
2. Disconnect the negative battery cable.
3. Remove the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [Z6].)
4. Verify that the spool valve inside the OCV is at the maximum valve timing retard position as shown in the figure.
• If it cannot be verified, replace the OCV.
5. Verify that the battery is fully charged.
6. Apply battery positive voltage between oil control valve terminals A and B, and verify that the spool valve operates and moves to the maximum valve timing advance position.
• If there is any malfunction, replace the OCV.
Note
• When applying battery positive voltage between the oil control valve terminals, the connection of the negative and positive cable can be either the A or B terminal.
7. Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing retard position.
• If it cannot be verified, replace the OCV.
8. Install the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [Z6].)
Wyszukiwarka
Podobne podstrony:
B3E011318740T03B3E011101008T04B3E011001001W03B3E011010100E04B3E011014420E02B3E011012111T02B3E011300113T18B3E011201008T11B3E011701008T01B3E011601007T05B3E011215200W01B3E011002000W02B3E011010300E03B3E011613970T01B3E011011211201B3E011341600W02B3E011215001W02B3E011801009W05B3E011801009W01więcej podobnych podstron