24 GB


TRUCK-MOUNTED CONCRETE BOOM PUMP
KZR/24
PIacing Boom B5ZR 24/21
Pumping Unit PA 907 F8, PA 1007 F8
Driven by PTO
Chassis 2 or 3 axle
Dimensions
30 m
9050 (*)
25 m
20 m
15 m
180°
4500
10 m
(*) dimension varying according to truck assembly
5 m
6700
4550
4550
4450
0
-5 m
-10 m
-15 m
20250
-20 m
6070
25 m 20 m 15 m 10 m 5 m 0 -5 m -10 m -15 m
max 4000
1450 (*)
24000
6200
2235
14650
2
5
4
°
251
°
6
°

TRUCK-MOUNTED CONCRETE BOOM PUMP
KZR/24
PIacing Boom B5ZR 24/21
Main features
Pumping Unit PA 907 F8, PA 1007 F8
Advantageous assembling on standard 2 or 3 axle chassis
Driven by PTO
Chassis 2 or 3 axle
Self-supporting frame - torsion free FEM designed
Front outriggers "X" style for a quick set-up and easy
pump placement in narrow areas
Outriggers fully hydraulic controlled on both machine sides
Pumping Unit TechnicaI Data
Placing boom B5ZR 24/21, 4 sections, pipeline diameter
125 mm, "Zed-R" mixed folding system
PA
PA
Proportional boom control allowing the operator 907
1007
MODEL
to control more placing boom sections simultaneously
F8
F8
The "BFC" Best-Flex Cifa supporting system allowing just one
Max. theoretical m3/h 87
99
man to change delivery pipeline easily, quick and safety.
output
Concrete flow rate regulator
Max. pressure bar 73
66
Quiet pumping with high performances: smooth, continuous
on concrete
and easy movements.
Max. numbers of nr. 31
26
Safety device on opening inspection hatch
cycles per minute
Concrete cylinders mm 200 x
230 x
(diam. x stroke) 1500
1500
Standard equipment
Radiocontrol proportional system with two speed for the
Concrete hopper l 550
550
boom, frequency synthetizer, 8 position key and concrete
capacity
flow rate regulator.
Proportional remote control for emergency with 8 position key,
concrete flow rate regulator and 30 m cable
PIacing Boom TechnicaI Data
Remote controlled vibrator on the concrete hopper grid.
MODEL B5ZR 24/21
Centralized lubrication system for pumping unit.
Additional manual lubrication system for pumping unit. Pipeline diameter
mm 125
Hard plastic outrigger support plates with relevant housing.
Max. vertical reach
m 24
Rear light on hopper
Max. horizontal distance
m 21
Level feelers for the control of the stabilization
Min. unfolding height
m 5,15
Accessories for cleaning and pipes washing
Section number
4
OptionaIs
1st section opening angle
-2°/90°/+6°
Concrete pipes at double thickness, in high resistant steel.
2nd section opening angle
180°
High pressure water pump for cleaning.
Air compressor for pipeline cleaning. 3rd section opening angle
251°
Centralized lubrication system for placing boom.
4th section opening angle
254°
Air pipeline on placing boom.
Rotating angle
370°
Hopper covering.
End hose lenght
m 4
Separate engine kit, for independent control of the mixer of
pumping unit hopper, water pump and eventual emergency kit.
Technical data and characteristics subject to modifications.
CIFA S.p.A.
ISO 9001:2000
via Stati Uniti d'America,26
20030 Senago (Milano) - Italy
tel.: +39.02.990131 - fax: +39.02.9981157
www.cifa.com
KZR24 GB 09/02


Wyszukiwarka

Podobne podstrony:
GB 112 24
24 kijek
990502 24
faraon 24
990929 24
24#5901 dydaktyk aplikacji multimedialnych
ch17 (24)
kielce,komis m,24
wykład 13 24 1 13
readme gb

więcej podobnych podstron