Activity: Integrate and Validate Build
var defaultQueryStr = '?proc=_b3LNYUdjEdqVZeSWHJlGyA&path=_b3LNYUdjEdqVZeSWHJlGyA,_lGvUQEdjEdqVZeSWHJlGyA';
var backPath = './../../';
var imgPath = './../../images/';
var nodeInfo=null;
contentPage.preload(imgPath, backPath, nodeInfo, defaultQueryStr, false, true, false);
Activity: Integrate and Validate Build
This covers the activities required to integrate, build and validate the build for either a subsystem or the entire system, whichever is appropriate.
Extends: Integrate and Validate Build
DescriptionWork Breakdown StructureTeam AllocationWork Product Usage
Relationships
Parent Activities
Integrate and Test
Description
This pattern, or set of activities, encapsulates the integration, build, and build verification activities
for the subsystems, as well as the system.
This pattern is repeated for each subsystem and for the portion of the entire system scheduled for integration in an
iteration. These integrations are repeated as needed throughout the iteration.
Properties
Event Driven
Multiple Occurrences
Ongoing
Optional
Planned
Repeatable
© Copyright IBM Corp. 1987, 2006. All Rights Reserved.
contentPage.onload();
Wyszukiwarka
Podobne podstrony:
integrate and build within scope97192Bintegrate and build within scope97192Bintegrate and build within scope97192Btest and evaluate within scope<6279C7test and evaluate within scope<6279C7test and evaluate within scope<6279C7test and evaluate within scope<6279C7test and evaluate within scope<6279C7test and evaluate within scopet315AC1integrate and test)F90B23integrate and testg61BA0Cintegrate and test(5ACFE3integrate and test(5ACFE3integrate and test)F90B23integrate and test)F90B23develop components within scope 1?FE2413integrate and test)F90B23develop components within scope?1409E3więcej podobnych podstron