CARGO GEAR MAINTENANCE - MONTHLY REPORT |
CRANE / DERRICK NO. |
1 |
2 |
3 |
4 |
ENGINE ROOM CRANE |
STORES DERRICK PORT |
STORES DERRICK STBD |
WIRES INSPECTED |
|
|
|
|
|
|
|
SHACKLES / PAD EYES CHECKED |
|
|
|
|
|
|
|
WIRES GREASED |
|
|
|
|
|
|
|
BLOCKS / PULLEYS GREASED |
|
|
|
|
|
|
|
BLOCKS / PULLEYS OVERHAULED |
|
|
|
|
|
|
|
HELL PINS / PIVOTS GREASED |
|
|
|
|
|
|
|
BRAKE BAND INSPECTION |
|
|
|
|
|
|
|
SLEWING RING GREASED |
|
|
|
|
|
|
|
FOUNDATION BOLTS INSPECTED / TIGHT |
|
|
|
|
|
|
|
LIMIT SWITCHES TESTED |
|
|
|
|
|
|
|
ELECTRIC MOTORS INSULATION TEST |
|
|
|
|
|
|
|
SLIP RINGS CHECKED |
|
|
|
|
|
|
|
HYDRAULIC OIL FILTER CHANGED / CLEANED |
|
|
|
|
|
|
|
OPERATING OIL PRESSURE WITHIN LIMITS |
|
|
|
|
|
|
|
DATE OF LAST OIL CHANGE |
|
|
|
|
|
|
|
DATE OF LAST LOAD TEST |
|
|
|
|
|
|
|
LAST ANNUAL INSPECTION BY CLASS |
|
|
|
|
|
|
|
QUANDRENNIAL DUE DATE |
|
|
|
|
|
|
|
DATE LAST SERVICE ENGINEER ATTENDED |
|
|
|
|
|
|
|
SPARE WIRES
|
|
|
MAIN SPARES |
QUANTITY |
HOISTING |
|
|
ELECTRIC MOTOR |
|
TOPPING |
|
|
HYDRAULIC MOTOR |
|
SLEWING |
|
|
HYDRAULIC PUMP |
|
|
|
|
|
|
HYDRAULIC OIL HV-68 (LITERS) |
|
|
|
|
HYDRAULIC OIL HV-32 (LITERS) |
|
|
|
|
HYDRAULIC OIL HV-15 (LITERS) |
|
|
|
|
|
|
|
|
|
OFFICER IN CHARGE:
|
MASTER: |
DATE: |
FOR OFFICE USE
DATE RECEIVED : |
CHECKED BY:
|
|
ATLANTIC UNITED MARINE INC. |
FORM / 4707
Safety Management System Manual - IMO Res. A.741 (18) |
|||
Developed by |
: SMS Designated Person |
Authorized by |
: Managing Director |
Date of Initial Issue |
: 03 February 1998 |
Revision No / Effective Date |
: 2 / 07-99 |
Chapter |
: 10 |
Page |
: 1 |