39359 Suzuki RM125s

39359 Suzuki RM125s



ENGINE REMOVAL AND INSTALLATION 5-9

* Reassemble the drive Chain clip so the slit end faces opposit the direction of rotation.



Fit the projection of the carburetor to the depression of intake pipę.




Install the new O-ring ®, connector rubber to the exhaust pipę.

Apply a smali quantity of engine oil the exhaust pipę.


install




After mounting the engine, inspect the following items.

♦    Transmission oil level (cy2-9)

♦    Engine coolant level (d/^2-10)

♦    Throttle cable play (CCj^2-12)

♦    Clutch leverplay (CCT’2-12)

♦    Drive Chain slack (CT/^2-16)


Wyszukiwarka

Podobne podstrony:
Suzuki RM125r 5-8 ENGINE REMOVAL AND INSTALLATIONINSTALLATION •    Reassemble the rem
Suzuki RM125p 5-6 ENGINE REMOVAL AND INSTALLATION •    Remove the cotter pin ® and br
Suzuki RM125h 5-4 ENGINE REMOVAL AND INSTALLATION • Remove the exhaust pipę fiłting springs with the
18581 Suzuki RM125g ENGINE REMOVAL AND INSTALLATION 5-3ENGINE REMOYAL AND INSTALLATIONREMOVAL ♦ &nbs
Suzuki RM125f 5-2 ENGINE REMOVAL AND INSTALLATIONEXTERIOR PARTS ! /     7*" K&q
36818 Suzuki RM125q ENGINE REMOVAL AND INSTALLATION 5-7 engine mounting bolts and plates swlngarm pi
25719 Suzuki RM125i ENGINE REMOVAL AND INSTALLATION 5-5 ♦    Disconnect the radiator
NS/GS9 - 58 ENGINE- REMOVAL AND INSTALL ATI ON (COfltmued) Fig. 30 Mess uring Platon Protmaion Mao
64002 Suzuki RM250B ENGINE DISMOUNTING AND MOUNTING 3-3 Disconnect the radiator hoses CD. Disconnect

więcej podobnych podstron