24 (41)

24 (41)



The Sixteenth Day of December


2 shurtles.

The snowfłake is madę continuously. Start with the inner ring and make the last picot as a false picot (see page 5).

After this you stan with a chain ac-cording to the diagram.


24


Wyszukiwarka

Podobne podstrony:
27 (36) The Nineteenth Day ofDecember 2 shuttles. This snowflake is madę continuously. There are 6 d
28 (33) The Twentieth Day of December Round 1: 1 shuttle + a bali thread. Round 2: 2 shutdes. The sn
frywolitka3 The Sixth Day of December 2 shuctles. The snowflake is madę in 2 rounds according to the
6 ? Figurę 24-41 The C4 pathway. CO, is concentratcd in thc mesophyll cclls and transported to thc b
skanuj0257 2 shuttles The butterfly is madę continously - commcncc at ring A.DIANA 2 shuttles T
29 (30) The Twentyfirst Day ofDecember 2 shurdes. The snowflake is madę in 3 rounds, but do not cut
30 (34) The Twentysecond Day ofDecember 2 shuttlcs. The snowflake is madę in 2 rounds continuously.
31 (32) The Twentythird Day ofDecember Round 1: 1 shuttle + a bali thread. Round 2: 2 shutdes. The s
22 (43) The Fourteenth Day ofDecember 2 shutdes. This snowflake is madę in 3 rounds, but do not cut
23 (42) The Fifteenth Day ofDecember 2 shuttles. The snowflake is madę in 2 rounds according to the
25 (39) The Seventeenth Day ofDecember 2 shuttles. The snowflake is madę in 2 rounds accordi ng to t
gwiazdka button hole stkches iround the metal ring and >oin into che sur afier och 6* Ootn&n
1. MICROCONTROLLER General description The P89V51RD2 is an 80C51 microcontroller with 64 kB Flash an
26 (34) The Eighteenth Dery ofDecember 2 shuttles. The snowflake is madę in split rings according to
image007 Mon. Tues. Wed. Thurs. Frl. Sat Day of the week Walce cime Had to be woken
image008 Day of the week Mon. Tues. Wed. Thurs. Frl. Sat. Sun. Wake ci
103 RIKEN Accel. Próg. Rep. 24 (1990)111-5-9. Test Experiment of the GARIS/IGISOL K. Morita, T. Nomu

więcej podobnych podstron