82

82



ENGINE OYERHAUL

Assembly (Cont'd)

6. Measure connecting rod clearance.


5. Tighten bearing cap bolts to the specified torque.

•    Tighten in two or three stages.

•    Prior to tightening bearing cap bolts, place bearing cap in proper position by shifting crankshaft in the axial direction.

ir r-

1

1 n

, - . s

po


PJ 46 - 52 Nm (4.7 - 5.3 kg-m, 34 - 38 ft-lbi


SEM031 A

• After securing the bearing cap bolts, ascertain that the crankshaffturns smoothly by hand.

5. Measure crankshaft free end play at the center bearing.

7. Make surę of the cylinder No. on connecting rod and cap.

SEM723A



Wyszukiwarka

Podobne podstrony:
ENGINE OVERHAULAssembly (Cont d) 2. Select suitable thickness of main bearing according to the follo
80268 sprintinst 5 FUEL CONNECTIONS. (Photos 12 & 13). 17.    Connect one end of
suziki rm12566 15-14 FRONT AND REAR BRAKES •    Tighten the master cylinder mounting
suziki rm12584 FRONT FORK AND STEERING 16-17 •    Tighten the fork upper clamp bolts
suzuki rm25070 15-24 FRONT FORK AND STEERING •    Tighten the fork upper clamp bolts
49847 Suzuki RM1254 FRONT FORK AND STEERING 16-17 ♦    Tighten the fork upper clamp
Suzuki RM2500 15-24 FRONT FORK AND STEERING •    Tighten the fork upper clamp bolts
Suzuki RM250c CLUTCH 5-9 ♦    Fit the clutch cover ®. ♦    Tighten the
bild100 Parts usedon 6-h.p., 8-h.p. A C and 8>h.p. W/ C Standard Engines continued. CONNECTING R
11226 Suzuki RM2505 • Tighten the cushion lever, cushion rod and swingarm nuts to the specitied tor
Huber2p18 J-JubeR ■ ftridL Crankshaft Assembly Connecting Rod and Piston THE valvc in head type four

więcej podobnych podstron