2740389183

2740389183



20 Yalery Bialevich

tion and reconstruction of such buildings are quite urgent and reąuire the use of new and morę reliable design Solutions and technologies.

2. DESIGN SOLUTION FOR UPDATING BUILDINGS

BelNIIS Institute RUE has developed technical solution [1,2] for repair and update of old-construction buildings, that allows with minimum cost price of construction and erection works to enhance strength and reliability meeting reąuirements of existing Norms and provide both free layout of the inside space and, through partial change of facades’ plastic art, form modern appearance and architectural expressiveness of buildings. It is achieved through substitution of inside bearing walls and wooden ceilings for building-in incomplete r/concrete frame having fiat precast and cast-in-situ ceiling disks of hollow-core slabs into existing bulk of building, and building on additional stories. Such solution has been realized in the historie center of Mogilev (Republic of Belarus) during reconstruction of a 5-storied dwelling building with addition of the 6th storey. In this building, concrete frame with middle row columns and fiat precast and cast-in-situ ceilings of hollow-core slabs was built in the volume formed after dis-mantling wooden ceilings and inside walls down to the level of existing r/concrete ceilings over the basement, while preserving external walls of ceram-ic bricks, foundation structures and staircase walls (Figurę 1).

Figurę 1. General view of the reconstructed 5-storied dwelling building a) with dismantled inside walls, b) at the stage of work execution, c) after reconstruction

Column space along the building amounted to 5.04...6.24 m, distance from axis of the row of columns to external walls was 4.25...5.25 m. To sustain concen-trated load the existing rubble concrete continuous footings in places of central-ly loaded cast-in-situ frame columns’ support were reinforced by r/concrete casings widened at the bottom and arranged on side faces. On internal brick wali sections at the basement level and in cast-in-situ ceiling above it to pass columns through openings were madę (Fig.2), and in zones were this wali abuts



Wyszukiwarka

Podobne podstrony:
p18 (20) SECTION TWO(Mainienance)INITIAL SERVICING OF NEW MOTORCYCLETo Be Done By the Unit Mechanic
CSG072 61 Morę Ab out the Preterit and the Imperfect Here are some expressions associated with the u
IMG#20 32 Associative Principles and Democratic Reform Laski in ‘The Problem of Administrative Areas
Study of the literaturę 10/20 Preparation for tests and the examination 10/20 Total student worklo
319Bibliographie KAHNEMAN, D., & TREISMAN, A. (1984). Changing views of atten-tion and automatic
Bibliografia 279 de la melioration des grands ensembles municipaux, Problem of water supply, canalis
PR ty ov • • III. Economic Reconstruction of Central and Eastern Europf. Febr nary ( and 7, 2:00
ŁETBORLOOIEA I GII«QLOGIXA Sol ■nr a:ov W Pa Source eport o c-« Ccurze of Accurr.ulc.tion and V.
Głos z probówki - marzec 2011 Bibliografia Szostek K., Chemical Signals and Reconstruction of Life S
20 Krystyna Brzozowska budgets and allowing the completion of infrastructure projects — and the bene
DSC09949 Multiple aneurysms are seen in about 20-30% of cases of berry aneurysm. Such aneu

więcej podobnych podstron