5569954907

5569954907




BeFitLab

-SlUiiiit


Test Report


Report No: BT20051301617-1    Pagc9of9

Appendix 16i Clogging___________

16.1. Clogging: For single shift use devices. the clogging test is an optional tesl. For re-usable devices the test is mandatory.

16.1.1    Breathing resistance: Valved particie filtering half masks:

After clogging the inhalation resistances shall not excecd:

FFP1: 4 mbar, FFP2: 5 mbar, FFP3: 7 mbar at 95L/min continuous flow The exhalation resistance shall not exceed 3 mbar at 160 L/min continuous flow Valveless particie filtering half masks

After clogging the inhalation and exhalation resistances shall not exceed:

FFP1: 3 mbar, FFP2: 4 mbar, FFP3: 5 mbar at 95L/min continuous flow

16.1.2    Pcnetration of filter materiał: The pcnetiation of the filtcr of the particie filtering half mask shall meet the requiremcnts of Tablc 1.

Sodium chloride test 95 l/min    ParalTin oil test 95 kmin

FFP1

<20%

<20%

FFP2

<6%

<6%

FFP3

<1%

<1%

16.2. Result: N/A

16.3. Notę: Single shift

use only.


Appendix 17: Demountahle parts__________

17.1.    Demountable parts: Ali demountable parts (if fitted) shall be readily connectcd and secured. where possible by hand

17.2.    Kesult: N/A

17.3. Notę: No demountable parts.

****** End

Notice Items:

1.    It is not valid if the report without our stamp.

2.    This report must not be altered, inereased or deleted.

3.    The report is just responsible for the tested samplc

4.    The sample{s) information was/were submitted and identified on bchalf of the Client.

5.    Any ąuestions on the report should be pul forward within fifleen days sińce the datę on which you receive the report, and overdue is inadmissible.

6.    The rcpjort must not be partially duplicated except in fuli, without prior written approval of the company.

7.    If any problem, please Cali: 021-59100859 or Email: info@befitlab.com

8.    Company website: www.accreditservice.com

BEFITLAB TEST TECHNOLOGY SHANGHAI CO., LTD.

No. 230, ALLEY 2999, BAOAN ROAD, JlADING DISTRICT SHANGHAI 201801,PEOPLE’S REPUBLIC OF CHINA

Email: infofSibcnilab.com



Wyszukiwarka

Podobne podstrony:
BeFitLabsmmTest Report Report No.: BT20051301617-1    Page 8 of 9Appendix 15: Breathi
BeFitLabIAS >//!«$ ---------- iesl Kep0n acc™ TL-787 Report No.: BT20051301617-1 PaSe 1 of
GIG Test Report Report No.:G150129B14EN    Datę: Feb. 03, 2015 Page4of4 Sample
and the Annex to the report by Prof. Schiffman (Appendix 7). Prof. Donald introduced the report
draft survey DRAFT SURVEY REPORT No Vcsscl B 354
IMG&60 Assisf no.... lifeboat(s) / lifcraft(s) and report. 9.1. Rescue bont / no.... motor lifchont
12vcg07 §8 Microsoft Developer Studio - No Crystal Reports Yet File Edit View Insert Build To ols Wi
Literatura 1.    Annual Report, Appendix I, International Monetary Fund, Washington D
APPENDIX 11 REPORT OF THE VICE-PRESIDENT FOR NORTH AMERICA, 1973-1977 Introduction This report cover
APPENDIX 12 REPORT OF THE YICE-PRESIDENT FOR SOUTH AMERICA, 1973-1977 In common with his colleagues
APC 13 09 07 30 2 3d ♦ Yes/No short answers are expressed in reported speech with subject
Captain EO= Comic 06 CAPTAIN EO, YOU ARB L-ATE REPORTING IN. ARE VOU HAVINe A PROBLEM Fi N
f18 2 report ztxi80Sdala>1 vakie A A

więcej podobnych podstron