6737635150

6737635150



www.epcg.com


»acity

is.

'ted.

P9,

Id

gie


HYDRO-POWER PLANT 'PMA' - TECHNICAL CHARACTERISTICS

HPP 'Piva', with the installed capacity of 360 MVA, has been operating sińce 1976. Average annual generation is 860 GWh. The power plant has a concrete arc dam, one of the highest in Europę, 220 meters high. The arc length at the top of the dam is 268.8 m, or 40 m at the level of the bed. The plant is located underground.



Wyszukiwarka

Podobne podstrony:
HOW MANY TO THE IEFT, HOW MANY TO THE RiGHT? • i • @depositpłotos mage ID: 450932460 www.depositphot
i Vn™! w Opnq w Ó (rldepositpKotospnn w Ó mage ID: 439735936 www.depositphotos.com
Imago ID: 143591953 www.doposapholos.com@depositpłotos
Wymagania dla dobrego oprogramowania www.DigitalLaughter.com IS IlanL.Sjiiłiarati AH d aiiu sz.pierz
how to wear burgundy Iow to wear burgundy http://www.trinnyandsusannah.com/rules/burgundyHOW TO WEAR
27 Codę Puzzle http://www.tolkingclectronics.com>FM BUG This kit is designed and manufactured by
26 Codę Puzzle http://www.talkingelectronics.com projects/Earv ig/Earw ig^html of the microphone an

Image ID: 320264310 www.depositphotos.com@depositpłotos
ITYFIKOWANO TUVRheinland System zarządzania ISO 9001:2015 www.tuv.com ID 9108627289
NAM 77aTradescantRoad London SW81XJ Wielka Brytania Id: +44 (O) 20 3242 0820 www.aidsmap.com e-mail:
4. 7.8.www.LearningClassesOnline.com(2) 92117 "The Social Contract theory is a bad history. bad

więcej podobnych podstron