EC08 FPC DIB WG Outbrief (9May08)

background image

------------------------------
THIS DOCUMENT COULD CONTAIN TECHNICAL DATA, THE EXPORT OF
WHICH IS RESTRICTED BY THE U.S. ARMS EXPORT CONTROL ACT (AECA)
(TITLE 22, U.S.C.SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT
OF 1979, AS AMENDED(TITLE 50, U.S.C., APP.2401, ET SEQ.). TECHNICAL
DATA AUTHORIZED FOR EXPORT MAY NOT BE REEXPORTED,
TRANSFERRED, OR DIVERTED FROM THE COUNTRY OF ULTIMATEEND-USE
OR FROM THE AUTHORIZED FOREIGN END-USER OR DISCLOSED TO A
NATIONAL OF ANOTHER COUNTRY WITHOUT THE PRIOR WRITTEN
APPROVAL OF THE OFFICEOF DEFENSE TRADE CONTROLS. TECHNICAL
DATA CONTAINED IN THIS DOCUMENT HAS BEEN AUTHORIZED FOR EXPORT
FROM THE UNITED STATES TO FOUR-EYES ALLIED PARTNERS, NATIONALS
OF AUSTRALIA, CANADA, AND THE UNITED KINGDOM BY THE OFFICE OF
DEFENSE TRADE CONTROLS,INSOFAR AS INDIVIDUAL NATIONALITY IS NOT
DIVERSE FROM HIS OR HER EMPLOYING AGENCY.
-------------------------------

background image

EMPIRE CHALLENGE 2008

Prudentia Per Proelium…Wisdom In Battle

UNCLASSIFIED

UNCLASSIFIED

EC08 DCGS Assessment Overview

Features

TEG

Block 1

(DEN)

1.2

N/A

6.0.1

N/A

TBD

1.2/1.3b

v6.8

N/A

TIGDL II

w/CVIU

TBD

Software
Baseline

V3.0/V3.1

Blk 10.2

Spiral 3

DIB Version

1.2/1.3b

1.3b

CIP

N/A

v7.0g

IPL

N/A

3.5.3 patch

3 build 0.12

CDL

N/A

N/A

Other Features

TBD

TBD

Note: NGA will be testing newer versions of the CDL, IPL and CIP, as well as
enhancements to the DIB

background image

EMPIRE CHALLENGE 2008

Prudentia Per Proelium…Wisdom In Battle

UNCLASSIFIED

UNCLASSIFIED

Empire Challenge 2008 – OV-1

High-Level Operational Concept Graphic

UNCLASSIFIED

National

Agencies

UNCLASSIFIED

CFLCC

IED

Combined

Joint

Task Force

CFSOCC

Requirements

CFMCC

Coalition

Partners

COCOM

DCGS

IPL

Tasking

Nominations &

Validations

background image

DIB Nodes (27)

ƒ

DDTE

DCGS-A V3 (Ft. Monmouth) (2 Nodes)

DCGS-A V3 (Danville)

DCGS-N Block 1 DEN (SSC-Charleston)

TEG (Danville)

DCGS-MC (ITSFAC)

DGS-X (Langley)

DCGS-I (Danville)

CENTAUR/CENTURION (Reston, VA)

NSG FWD (Mic Labs)

NSG FWD (PAX River, MD)

JIL (Suffolk, VA)

ƒ

CFBL/4 Eyes

DCGS-A V3 (Echo)

DCGS-A V3 (513 MI BDE)

Project Diamond (Brampton)

CENTAUR/CENTURION (Reston, VA)

NGA Co-Host (CL) *

NGA Transit Case (CL)

MAJIIC (Langley AFB)

Paul Revere Ground Trailer (Danville)

ƒ

CFBL/NATO

CENTAUR/CENTURION (Reston, VA)

MAJIIC (Langley AFB)

ƒ

SIPRNET

DCGS-A V3 (66 MI GP [EAC])

DCGS-I (Danville)

DEAL (PAX River)

ƒ

JWICS

DCGS-IC

DEAL (PAX River)

background image

Way Forward

ƒ What DIB WG needs (by 16 May):

– IP Addresses

– Site Name

– Any changes to EC 08 Schema baseline

ƒ Schemas Set will be distributed: 19 May 08

ƒ Spiral 2:

– Goal: DIB Node Configuration/Limited Federation

– Readiness Review 19 May 08

ƒ Spiral 3:

– Goal: DIB Federation All Nodes (Cross Domain Federation included)

– Readiness Review: 9 June 08

ƒ DIB WG Telecon

– Every Thursday 1500-1600 EDT

background image

Issues

ƒ Technical

– Resource Adapter Development

– Port 443 vs Port 80

– Configuration Lockdown

ƒ Procedural

– Releasability Marking

– Accreditation


Wyszukiwarka

Podobne podstrony:
EC08 FPC DIB WG Outbrief (9May08)
EC08 FPC Operations WG Outbrief (9May08)
EC08 FPC Security WG Outbrief (9May08)
EC08 FPC Architecture WG Outbrief (9May08)
EC08 FPC Networking WG Outbrief (9May08)
EC08 FPC COMMS WG Outbrief (9May08)
EC08 FPC Architecture WG Outbrief (9May08)
EC08 FPC Operations WG Outbrief (9May08)
EC08 FPC Security WG Outbrief (9May08)
EC08 FPC Networking WG Outbrief (9May08)
EC08 FPC COMMS WG Outbrief (9May08)
EC08 FPC Coalition SWG Outbrief (9May08)
EC08 FPC Coalition SWG Outbrief (9May08)
EC08 FPC Intel Scenario WG Outbrief (9May08)
EC08 FPC Intel Scenario WG Outbrief (9May08)
EC08 FPC NTISR Strike TIG Outbrief (9May08)
EC08 FPC PS TIG FPC Outbrief (9May08)
EC08 FPC UK Outbrief (9May08)
EC08 FPC Joint ISR Mgmt TIG Outbrief (9May08)

więcej podobnych podstron