EC08 FPC Architecture WG Outbrief (9May08)

background image

------------------------------
THIS DOCUMENT COULD CONTAIN TECHNICAL DATA, THE EXPORT OF
WHICH IS RESTRICTED BY THE U.S. ARMS EXPORT CONTROL ACT (AECA)
(TITLE 22, U.S.C.SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT
OF 1979, AS AMENDED(TITLE 50, U.S.C., APP.2401, ET SEQ.). TECHNICAL
DATA AUTHORIZED FOR EXPORT MAY NOT BE REEXPORTED,
TRANSFERRED, OR DIVERTED FROM THE COUNTRY OF ULTIMATEEND-USE
OR FROM THE AUTHORIZED FOREIGN END-USER OR DISCLOSED TO A
NATIONAL OF ANOTHER COUNTRY WITHOUT THE PRIOR WRITTEN
APPROVAL OF THE OFFICEOF DEFENSE TRADE CONTROLS. TECHNICAL
DATA CONTAINED IN THIS DOCUMENT HAS BEEN AUTHORIZED FOR EXPORT
FROM THE UNITED STATES TO FOUR-EYES ALLIED PARTNERS, NATIONALS
OF AUSTRALIA, CANADA, AND THE UNITED KINGDOM BY THE OFFICE OF
DEFENSE TRADE CONTROLS,INSOFAR AS INDIVIDUAL NATIONALITY IS NOT
DIVERSE FROM HIS OR HER EMPLOYING AGENCY.
-------------------------------

background image

Know the Earth…Show the Way

UNCLASSIFIED

UNCLASSIFIED

Empire Challenge 2008
Architecture Working Group Outbrief

Empire Challenge 2008
Architecture Working Group Outbrief

09 May 2008

09 May 2008

NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY

Architecture WG Lead

background image

EMPIRE CHALLENGE 2008

Prudentia Per Proelium…Wisdom In Battle

UNCLASSIFIED

UNCLASSIFIED

Review of Work During FPC

• Reviewed previous AV-1 and OV-1, OV-2, OV-4,

OV-5s based on evolving changes to the
architecture

• Developed the SV-4, Systems Functionality

Description, for Joint ISR Management and for
MDA Biometrics Thread

– Identified gaps in processes

– Identified network connectivity issues

background image

EMPIRE CHALLENGE 2008

Prudentia Per Proelium…Wisdom In Battle

UNCLASSIFIED

UNCLASSIFIED

Planned AWG Activities

• Address gaps and connectivity issues identified

during the FPC, SV-4 discussions

• Focus on the OV-3, Node Connectivity Description,

SV-6, Systems Data Exchange Matrix

– 14-15 May, at Naval Postgraduate School, Monterey
– 04-05 June, Chantilly, VA

• Begin review of submitted products from TIGs and

Initiatives

• Provide updated architecture products following

Spiral 3


Wyszukiwarka

Podobne podstrony:
EC08 FPC Architecture WG Outbrief (9May08)
EC08 FPC Operations WG Outbrief (9May08)
EC08 FPC Security WG Outbrief (9May08)
EC08 FPC Networking WG Outbrief (9May08)
EC08 FPC COMMS WG Outbrief (9May08)
EC08 FPC DIB WG Outbrief (9May08)
EC08 FPC Operations WG Outbrief (9May08)
EC08 FPC Security WG Outbrief (9May08)
EC08 FPC Networking WG Outbrief (9May08)
EC08 FPC DIB WG Outbrief (9May08)
EC08 FPC COMMS WG Outbrief (9May08)
EC08 FPC Coalition SWG Outbrief (9May08)
EC08 FPC Coalition SWG Outbrief (9May08)
EC08 FPC Intel Scenario WG Outbrief (9May08)
EC08 FPC Intel Scenario WG Outbrief (9May08)
EC08 FPC NTISR Strike TIG Outbrief (9May08)
EC08 FPC PS TIG FPC Outbrief (9May08)
EC08 FPC UK Outbrief (9May08)
EC08 FPC Joint ISR Mgmt TIG Outbrief (9May08)

więcej podobnych podstron