background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Chartek Fireproofing 

Qualified Applicator Programme 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

 

 

 

LIST OF CONTENTS 

 
 

1 

PROGRAMME OBJECTIVE AND RESPONSIBILITIES (INTERNATIONAL) ...................3 

2 

QUALIFIED APPLICATOR PROGRAMME ..............................................................................4 

2.1 P

ROCEDURE TO BECOME A 

Q

UALIFIED 

A

PPLICATOR

....................................................................4 

2.2 A

PPLICATOR 

Q

UALIFICATION 

O

UTLINE

........................................................................................4 

2.3 E

QUIPMENT 

R

EQUIRED FOR 

Q

UALIFIED 

A

PPLICATORS

.................................................................5 

2.4 T

RAINING OF 

Q

UALIFIED 

A

PPLICATOR 

P

ERSONNEL

......................................................................5 

2.5 A

PPLICATOR 

A

GREEMENT

............................................................................................................5 

2.6 A

PPLICATOR 

C

ERTIFICATE 

(S

EE 

A

PPENDIX 

3) ..............................................................................6 

2.7 R

ESPONSIBILITY OF 

A

PPLICATORS

................................................................................................6 

3 

QUALITY MANUAL .......................................................................................................................7 

3.1 I

NTERNATIONAL 

C

HARTEK 

F

IREPROOFING 

Q

UALITY 

C

ONTROL 

M

ANUAL

....................................7 

4 

QUALITY AUDITS ..........................................................................................................................8 

5 

INTERNATIONAL CHARTEK FIREPROOFING APPLICATION MANUAL ...................10 

6 

CHARTEK APPLICATOR TRAINING SCHOOLS..................................................................11 

7 

CHARTEK FIREPROOFING QUALIFIED SUPERVISOR AND INSPECTOR 

 PROGRAMME ...............................................................................................................................12 

7.3 P

ROGRAMME 

R

EQUIREMENTS

....................................................................................................12 

 
 
APPENDICES 
 

1 Applicator 

Qualification Outline Form 

Qualified Applicator Agreement 

3 Qualified 

Applicator Certificate 

Individual Training Certificate 

5 Chartek 

Fireproofing 

Quality Control Manual 

Completion of the Technical Service Audit Report and Report Form 

Curriculum for Applicator Training Schools 

Completion of the Technical Service Non-conformance Report and Report Form 

Description and Examples of Discrepancies 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

 
 

PROGRAMME OBJECTIVE AND RESPONSIBILITIES (INTERNATIONAL) 

 
The objective of the International Paint Ltd Qualified Applicator Programme is to: 
 
1.1 

Achieve application of Chartek fireproofing consistent with the highest attainable quality 
standards. 

 
1.2 

 The Worldwide PC Technical Service Engineer is responsible for maintaining this 
document and for ensuring International’s compliance with the requirements described 
in it. 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

 

QUALIFIED APPLICATOR PROGRAMME 

 
2.1 

Procedure to become a Qualified Applicator 

 
2.1.1  Need is determined by Regional Sales Manager. 
 
2.1.2  All potential Applicators must complete the Applicator Qualification Outline form and 

return it to the Regional Sales Manager. 

 
2.1.3  All potential Applicators must have approved equipment, in good working order, as 

defined in Section 2.3. 

 
2.1.4  All potential Applicators must comply with all provisions of the Applicator Agreement 

and sign and return to the Regional Sales Manager (see Appendix 2). 

 
2.1.5  All potential Applicators must complete the necessary training (see Section 6). 
 
2.1.6  Upon completion of paragraphs 2.1.2 through 2.1.5, the Applicator will be considered 

‘trained’ and may bid for Chartek application work. 

 
2.1.7  Upon completion of one Chartek application to the satisfaction of International and the 

Applicator’s customer, International shall issue a certificate identifying the applicator as 
a ‘Qualified Applicator’ (see Appendix 3). 

 
2.2 

Applicator Qualification Outline 

 
2.2.1  The Applicator Qualification Outline Form (see Appendix 1) shall be completed by all 

prospective Applicators. 

 
2.2.2  The Qualification Form will be reviewed by the Regional Sales Manager to determine if 

the company has sufficient experience, personnel and equipment to properly execute a 
Chartek application. 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

 
2.3 

Equipment Required for Qualified Applicators 

 
2.3.1  Prior to complying with paragraph 2.4 (below), the Applicator must provide approved 

equipment for the application of Chartek as identified in the  current edition of the 
‘Application Manual for Chartek Fireproofing System’ 

 
2.4  

Training of Qualified Applicator Personnel 

 
2.4.1  A minimum of six suitably qualified people must attend a Training School conducted by 

an International Technical Service Engineer.  (Refer to Section 6). 

 
2.4.2 Following 

completion 

of the Training School, the Technical Service Engineer will furnish 

a list of all attendees of the School to the Regional Sales Manager. 

 
2.4.3  This list will be added to the computer database of all trained applicator personnel.  The 

database shall include applicator company name, name of individuals trained, date and 
location of the training programme. 

 
2.4.4  All individuals attending the School will receive a certificate (Appendix 4) attesting their 

attendance of the School. 

 
2.5  

Applicator  Agreement 

 
2.5.1  The Regional Sales Manager will prepare two copies of the current International 

Applicator Agreement (see Appendix 2) and mail them to the Applicator. 

 
2.5.2  The Applicator will sign and have witnessed both copies of the Applicator Agreement 

and return them to the Regional Sales Manager with the names of contacts within their 
company for Management, Sales, Commercial/Purchasing, Health and Safety, and 
Quality matters. 

 
2.5.3  Upon receipt of the signed Agreements, the Regional Sales Manager will have both 

copies dated and countersigned by the appropriate person, and return one copy to the 
Applicator. 

 
2.5.4  The remaining Agreement will be maintained in an Applicator Agreement file. 
 
2.5.5  Applicator shall provide at International’s request a list of International-trained Chartek 

applicator personnel and names of contacts within their company for Management, 
Sales, Commercial/Purchasing, Health and Safety, and Quality matters. 

 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

2.5.6  Applicator’s failure to respond to the requested list may be cause for cancellation of the 

Agreement. 

 
2.6  

Applicator Certificate (See Appendix 3) 

 
2.6.1  The Trained Applicator Certificate is a document provided to the Applicator attesting to 

his having complied with all provisions of the International Qualified Applicator 
Programme. 

 
2.6.2  The Certificate will be signed on behalf of International by the Regional Sales Manager. 
 
2.7  

Responsibility of Applicators 

 
2.7.1  The primary responsibility of the Applicator shall be to ensure that Chartek fireproofing 

is installed in accordance with International’s written instructions contained in the 
Chartek Application Manual (latest revision) and to a quality standard acceptable to 
International’s Technical Service personnel and the client. 

 
2.7.2  The Chartek application shall be done by the Applicator using employees trained in the 

proper application procedure and using equipment approved by International. 

 
2.7.3  Applicator shall cooperate with International’s Technical Service personnel by allowing 

them free access to inspect the Applicator’s work and Applicator shall fully comply with 
the instructions of International’s Technical Service personnel regarding application of 
the Chartek and/or correcting discrepancies pointed out by International’s Technical 
Service personnel (see Section 4). 

 
2.7.4  Applicator shall fully comply with all applicable laws, regulations and safety 

requirements. 

 
2.7.5  Failure to comply with any or all of the above responsibilities shall be grounds for 

termination of the Applicator Agreement. 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

 
3 QUALITY 

MANUAL 

 
3.1 

International Chartek Fireproofing Quality Control Manual 

 
3.1.1  International shall publish a Manual (see Appendix 5) which shall serve as a guideline 

for its Applicators to base their own Chartek Quality Control application procedure upon. 

 
3.1.2  This Manual shall be available to customers and applicators on a non-controlled basis. 
 
3.1.3  The WWPC Technical Service Manager and WWPC Technical Engineering Manager 

shall, from time to time, review the Manual and institute changes which reflect 
improvements in process or administration. 

 
3.2.1  Each Applicator shall maintain a Quality Control Manual for the application of Chartek 

fireproofing and operate in accordance with the procedure listed in the Manual. 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

 
4 QUALITY 

AUDITS 

 
4.1 

 International Technical Service representatives are responsible for auditing compliance 
by Chartek fireproofing Applicators with requirements and recommended procedures for 
installation of Chartek fireproofing, as defined in International’s Chartek Fireproofing 
Application Manual.  The extent of individual audits will be at the discretion of the 
Technical Service representative and may be limited to only a given segment of the 
requirements and procedures. 

 
4.1.1  Results of audits shall be recorded in an International Technical Service Audit Report 

Form (see Apppendix 6).  At the conclusion of the audit, the Audit Report Form is to be 
signed by representatives of the Applicator and the International Technical Service 
Engineer.  A copy of the completed Audit Report Form is to be provided to the following: 

 

a.  Applicator’s site supervisor. 

 

b.  Applicator’s site quality control supervisor. 

 

c. Applicator’s 

company quality control manager. 

 

d. Constructor’s/Fabricator’s representative. 

 

e. Client’s representative, if required. 

 

f.  International will retain a copy for a minimum of five years from the date of 

completion of the project.  

 
4.1.2  During the course of the audit, the Technical Service representative will record data and 

information relating to the project on the Technical Service Audit Report Form. 

 
4.1.3  Reported observations and discrepancies that require corrective action be taken by the 

Applicator, in accordance with International approved corrective action shall be carried 
out within the agreed timeframe. Continued failure to carry out corrective action may 
result in a Non-Conformance Report being issued.  

 
4.1.4  An Applicator who consistently produces poor standards of application or does not 

comply with the requirements of corrective action/ NCR reports will be considered for 
termination of Qualified Applicator status. 

 
4.1.5  Responsibility for maintaining records regarding Discrepancies and Corrective Action 

will lie with the Regional Sales Manager.  He will also be responsible for initiating 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

Notices of Intent to Cancel which are to be transmitted to Applicators.  Actual letters of 
cancellation will only be issued by the Regional Sales Manager at his discretion. 

 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

10 

 

INTERNATIONAL CHARTEK FIREPROOFING APPLICATION MANUAL 

 
5.1 

International shall publish an ‘Application Manual’ which defines current procedures for 
correct Chartek application. 

 
5.1.1  The Manual shall be distributed to Regional Technical Managers by WWPC Oil, Gas, 

Fire & Insulation. 

 
5.1.1.1 

Regional Technical Manager will maintain a log of sequentially controlled copies 
distributed, including company name, individual’s name and address. 

 
5.1.1.2 

As periodic updates are made to the Manual the Regional Technical Manager will be 
responsible for distributing a copy of the updates to all holders of controlled 
Manuals. 

 
5.1.1.3 Uncontrolled 

copies will not be updated. 

 
5.1.2  It is the responsibility of the International Sales or Technical Service person requesting 

the distribution of the Manual to specify whether it should be controlled or uncontrolled. 

 
5.2 

The WWPC Technical Service Manager and WWPC Technical Engineering Manager 
shall jointly annually, or more often if required, review the Manual for accuracy, clarity, 
new or modified procedures, etc. and recommend updates as appropriate. 

 
5.2.1  Procedure for Chartek Fireproofing Manual Updates 
 
5.2.1.1 

The proposed modification will be reviewed and signed off by the WWPC Technical 
Engineering Manager, WWPC Technical Service Manager. 

 
5.3 

The updated Manual will be available on the International PC intranet and personnel 
notified. 

 
 
 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

11 

 
6 CHARTEK 

APPLICATOR 

TRAINING SCHOOLS 

 
6.1  The curriculum for the Applicator Training Schools shall be as indicated in Appendix 7. 
 
6.2  Attendance at each School shall be limited to a maximum of 15 students. 
 

For training of new applicators or applicator ‘teams’, it is important that a balanced 
representation of management, site supervisory staff, QA/QC representative and ‘hands-
on’ operatives attend. 

 
6.3  The School shall be conducted in both a classroom format (1 day) and a ‘hands-on’ 

format (1 day) with each student given the opportunity to perform spraying and rolling 
operations. 

 
6.4  The Schools will be conducted jointly by the International Technical Service Engineer and 

an International Salesperson. 

 
6.5  Applicator shall be responsible for purchasing from International adequate stocks of 

Chartek sufficient for the requested training as determined by the Technical Service 
Engineer and ensure the material is at the School site in advance of the School. 

 
6.6  Applicator shall make available such approved equipment in working order, spray targets, 

and any other items deemed necessary by the Technical Service Engineer. 

 
6.7  At the conclusion of all Chartek Applicator Training Schools, the Technical Service 

Engineer will advise the Regional Sales Manager in writing with a list of all attendees, 
dates and location of the School(s). 

 
6.8  The Regional Sales Manager will ensure that appropriate Certificates of Attendance are 

issued and the Regional International trained applicator personnel database is updated 
(refer to Sections 2.4.2 and 2.4.3). 

 
6.9  No Certificates of Attendance will be issued by International to anyone attending a 

Training School not fully in compliance with the above requirements. 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

12 

 
7 CHARTEK 

FIREPROOFING 

QUALIFIED 

SUPERVISOR AND INSPECTOR PROGRAMME 

 
7.1  The programme is designed to provide International and International’s customers 

confirmation that the Chartek Applicator personnel responsible for Chartek fireproofing 
application are experienced and thoroughly understand the correct Chartek application 
procedures. 

 
7.2  Participation in the programme shall be limited to those individuals who perform actual 

site supervision and inspection of Chartek projects. 

 
7.3 Programme 

Requirements 

 
7.3.1  An individual (or company sponsoring an individual) wishing to participate in the 

Qualified Chartek Supervisor and Inspector Programme notifies International of the 
desire to participate. 

 
7.3.2  If the applicant has not already done so, he/she must attend a Chartek Applicator 

Training School. 

 
7.3.3  The applicant, following his attendance at an Applicator Training School, will 

demonstrate his knowledge and understanding of the proper Chartek application 
procedure in one of the following ways: 

 
7.3.3.1 

Satisfactorily complete an examination administered by the International WWPC 
Technical Service Manager which demonstrates his knowledge of Chartek 
application and QA/QC procedures.  The examination will include questions in 
relation to application and QA/QC procedures. 

 

7.3.3.2 

Supervise a key Chartek application project (in excess of 1000m

2

) to the satisfaction 

of the client and the International WWPC Technical Service Manager. 

 
7.4 Following 

satisfactory 

completion of Sections 7.3.3.1 and 7.3.3.2 above, the International 

WWPC Technical Service Manager will document date of completion of each 
requirement and submit same along with a written request to issue a Qualified Chartek 
Supervisor and Inspector Identification Card to the Regional Sales Manager. 

 
7.5  Following verification of the applicant in the Trained Applicator Personnel Database, a 

sequentially numbered photo ID card will be issued to the applicant indicating his 
successful programme completion. 

 
7.6  The Qualified Chartek Supervisor and Inspector ID card shall be valid for two years from 

date of issue.  It may be renewed upon written request documenting successful Chartek 

background image

 

 

 

 
 
 
 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

Rev.3 – May 2006 

13 

projects which the individual has supervised within the last 12 months and which requires 
agreement by the International Technical Service Manager.  An individual who is not able 
to demonstrate supervision/inspection of Chartek projects within the previous 12 months 
will need to re-qualify. 

 

Note:  At International’s discretion certain individuals well known to International with a 
continuous and current record of project supervision/inspection may be qualified outside 
of the foregoing procedures. 

 

background image

 

 

1

CHARTEK

®

 FIREPROOFING 

APPLICATOR QUALIFICATION OUTLINE 

 

NAME: 

 

ADDRESS: 

 

 

 

 

 

TELEPHONE NO: 

 

PRINCIPAL CONTACT: 

 

 

(1)  EXPERIENCE WITH MASTIC COATINGS 

YES  

NO   

 

•  Materials Used   

 

 

 

 

 

 

 

•  Process(es) 

 

 

 

 

 

 

 

 

•  Surface Preparation Required 

YES  NO 

 

 

•  Pump Equipment Available (Describe)   

 

 

 

 

 

 

 

•  Type of Surface 

 

 

 

 

 

 

 

 

•  Number of Jobs: 

 

 

•  Numbers of Years of Experience: 

 

APPENDIX 1 

background image

 

 

2

 
 

(2)  EQUIPMENT EXPERIENCE  

 

   

 

•  Abrasive Blasting   

 

 

 

 

 

 

 

•  Rigging 

 

 

 

 

 

 

 

 

•  Priming 

 

 

 

 

 

 

 

 

(3)  SALES: £  

 

 

 

(4)  EMPLOYMENT LEVEL: 

 

   

 

•  Number Full Time   

 

 

•  Number Part Time   

 

 

(5)  EXPERIENCE IN LARGE PLANTS 

 

   

 

(Name, Location, Type of Job) 

 

 

 

 

 

•  Refineries 

 

 

 

 

 

•  Petrochemical 

 

 

 

 

 

•  Other Industrial   

 

 

 

background image

 

 

3

 
 

(6)  REFERENCES  

 

 

 

(Preferably Three Related to Above Experience)   

 

 

 

 

1.   COMPANY NAME:   

 

 ADDRESS: 

 

 

 

 

 

 

 

 

 

 

 

 TELEPHONE 

NO.: 

 

 

 CONTACT 

NAME: 

 

 

 

 

 

2.   COMPANY NAME:   

 

 ADDRESS: 

 

 

 

 

 

 

 

 

 

 

 

 TELEPHONE 

NO.: 

 

 

 CONTACT 

NAME: 

 

 

 

 

 

3.   COMPANY NAME:   

 

 ADDRESS: 

 

 

 

 

 

 

 

 

 

 

 

 TELEPHONE 

NO.: 

 

 

 CONTACT 

NAME: 

 

 

background image

 

 

4

 

SUPPLEMENTARY INFORMATION 

 

I. 

Please list all your present employees who have attended a formal 
Applicator Training School: 

 

EMPLOYEE NAME 

DATE OF CLASS 

LOCATION 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

II. 

Please fill in the name of contacts at your company for the following 
purposes: 

•  Management: 

 

 

(whom do we contact for matters relating to agreements, etc?) 

•  Sales: 

 

 

(to whom do we refer clients for bids or quotes?) 

•  Commercial/Purchasing:   

(who is the contact for purchasing responsible for ordering 
materials from us?) 

•  Health & Safety: 

 

(to whom do we send information regarding health and safety 
questions?) 

•  Quality: 

 

(who is the company contact on quality assurance matters?) 

 

background image

 

 

5

III. 

Please list all the approved spray equipment in your possession. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

International Paint Ltd 
Fire & Insulation Products 
Essex House 
141 Kings Road 
Brentwood 
Essex 
United Kingdom 
CM14 4DR 
Telephone No:  +44 (0)1277 229192 
Telefax No: 

+44 (0)1277 228745 

www.chartek.com 

background image

June 2000 

 

- 1 -

 

APPLICATOR AGREEMENT 

APPENDIX 2 

 
 
THIS APPLICATOR AGREEMENT is made the  

day of   

 

 

by 

and 

between INTERNATIONAL PAINT LTD (registered number 63604) whose registered office is 
at PO Box 20980, Oriel House, 16 Connaught Place, London  W2 2ZB (the "Company") and  
   

 (the 

"Applicator") 

 
WHEREAS IT IS AGREED as follows: 
 
1. Appointment 
 

(a) 

Subject to the terms of this Agreement, the Company hereby appoints Applicator as 
an "Applicator" of the products set out in Schedule A (the “Products”). 

 

(b) 

Upon completion of one application of the Products to the satisfaction of the 
Company and the Applicator's customer, the Applicator shall be designated a 
"Qualified Applicator" of Products. The Applicator is required to confirm to the 
Company on an annual basis and at any other time at the Company's request that it 
remains in compliance with the requirements of Clause 3 in order to remain a 
Qualified Applicator.  Notwithstanding, the above, the Applicator's designation as 
Qualified Applicator may be terminated by the Company at any time and shall 
automatically terminate upon termination or expiry of this Agreement.

 

 

 
2. 

Purchase of Products by Applicator 

 

(a) 

The Applicator shall purchase Products from the Company, subject to acceptance of 
orders by the Company

 

and the terms of this Agreement, at the prices established by 

the Company that are in effect on the date of shipment or as previously quoted in a 
written quotation from the Company.  The Company’s Conditions of Sale in force 
from time to time will apply to this Agreement and to all sales made to the 
Applicator pursuant to it except where inconsistent with the terms of this 
Agreement, in which case the latter will prevail. 

 
 

(b) 

Notwithstanding Clause 2(a), the Company, in its sole discretion and without any 

liability to the Applicator or to any other party, may refuse to fulfill any order 
accepted for one or more of the following reasons

 

(i) 

the Applicator has failed to pay any invoice in accordance with the terms 
of this Agreement; 

 

(ii) 

the Company has reason to believe the Products will be used in an 
application for which the Company believes they are unsuitable or will be 
applied in a manner which is contrary to the Company’s requirements; 

 

background image

June 2000 

 

- 2 -

(iii) 

the Applicator has failed to remain in compliance with the requirements of 
Clause 3;

 

or  

 

(iv) 

legal restrictions prevent the Company from fulfilling an order. 

  
  

(b) 

The Company may elect to discontinue Products or to make changes to Products 
without incurring any liability to the Applicator.  The Company will endeavour to 
advise the Applicator with as much notice as possible of such discontinuation or 
changes. 

 
(c) 

For the avoidance of doubt, the Applicator is appointed on a non-exclusive basis and 
the Company may appoint other applicators and may sell Products to them or any 
other party.  

 
3. 

Duties of the Applicator 

 

(a) 

The Applicator shall at all times during this Agreement comply with all of the 
Company's requirements of Qualified Applicators, which may be revised from time 
to time by the Company and which currently include, but are not limited to, the 
following: 

 

(i) 

all applications of Products must be carried out in accordance with the 
then current edition of the Company's product application guide as 
supplied from time to time by the Company or other procedures approved 
in writing by the Company;  

 

(ii) 

all applications of Products must be performed or directly supervised by 
properly qualified employees of the Applicator who have attended a 
International Paint Ltd applicator training school (“Training School”)

;

  

 
(iii) 

the Applicator must use application equipment approved by the Company;  

  

 

  

 

 

(iv) 

the Applicator shall comply with all applicable laws, regulations and 
safety requirements; and 

 

(v) 

the Applicator shall maintain and adhere to the procedures of a quality 
control manual consistent with the Company’s requirements for the 
application of the Products.  The Applicator shall also maintain a quality 
assurance manual and shall adhere to the policies and procedures therein. 

 

Because it is recognised that certain markets and/or clients have special 
quality assurance requirements the Company, at its sole discretion, may 
require that the Applicator’s quality control manuals and practices be in 
conformance with an appropriate International Standards Organisation 
(ISO) standard or an equivalent national standard. 

background image

June 2000 

 

- 3 -

 

(b) 

The Applicator recognises that the proper application of Products is essential to their 
effectiveness and safety and, to help ensure such proper application, agrees to not 
sell Products to third parties without the written approval from the Company unless 
the Applicator reasonably believes that such Products will be applied only by the 
Applicator or another applicator appointed by the Company as a Qualified 
Applicator of Products. 

 

(c) 

The Applicator shall allow the Company's field service representatives to inspect 
any application job being performed by the Applicator and shall use its best 
endeavours to enable such field service representatives to gain access to the 
premises of the Applicator’s customers to perform such inspections. The Company 
shall have no liability for any advice or assistance given or omitted to be given by 
its field service representatives in the course of any such inspection.  

 
4. Warranty 
 

The Company warrants (the “Warranty") that upon delivery Products are sold with good 
title, are made with sound materials and workmanship, comply with Company's then 
current published product data sheets and shall comply with any specification supplied by 
the Company.  

 

 
5. 

Limitation of Liability 

 
5.1 

The Company shall not be liable under Clause 4 unless the Applicator satisfies the 
Company that it strictly complied with any instructions of the Company relating to the 
Products.   

 
5.2 

The Applicator shall examine the Products as soon as reasonably practicable after delivery. 
The Applicator shall then immediately notify the Company of any incomplete or failed 
delivery, loss or damage during carriage, shortage of weight or quantity or if the Products 
fail to comply with the Warranty and shall, in the case of damaged Products, be entitled to 
notify the Company that it rejects all or any part of the Products in that delivery.  Unless 
the Applicator so notifies the Seller within 30 days after the date when the Applicator 
became or ought reasonably to have become aware of any of the above, the Applicator 
shall be treated as having waived all claims connected with the matter which should have 
been notified.  Where notification is so made no action whatsoever may be brought against 
the Company in connection with the Products unless proceedings are issued against the 
Company within two years after the Applicator became or ought to have become aware of 
the circumstances giving rise thereto. 

 
5.3 

Provided notification is made within the above 30 days period, if it is shown to the 
Company's reasonable satisfaction that Products fail materially to comply with the 
Warranty, the Company shall be given a reasonable opportunity to correct such failure.  If 
the failure is not corrected, the Company will, at the Applicator's option, either refund the 

background image

June 2000 

 

- 4 -

purchase price (or, if the Products have depreciated for reasons other than the Company's 
default or been used or put in process, a reasonable part of the purchase price) or replace 
part or the whole of the Products (if reasonably practicable) within a reasonable time, free 
of charge.  Such correction, refund or replacement shall, subject to Clause 5.6, be the 
Company's sole liability in relation to any such failure. 

 
5.4 

Products which are alleged not to comply with the Warranty shall, as far as possible, be 
preserved for the Company's inspection and shall be returned to the Company (at the 
Company's cost) if the Company reasonably so requests.  The Applicator shall be deemed 
to have waived its rights in respect thereof unless, wherever possible, it has given the 
Company reasonable opportunity to inspect such Products. 

 

 

5.5 

The Company shall not be liable in any way whatsoever for: 

 

(a) 

the incompatibility of any Products supplied by the Company with the products of 
other manufacturers or suppliers; 

 
(b) 

inadequate or incorrect surface preparation or coating application work carried out 
by, or the faulty equipment or product of, the Applicator or any third party; 

 

(c) 

any representations, advice or assistance given or omitted to be given in connection 
with Products; or 

 

(d) 

the supervision or quality control (or lack thereof) by or on behalf of any third party. 

 
5.6 
 

(a) 

The Company does not exclude or restrict any liability which cannot be excluded or 
restricted as between the Company and the Applicator, including in respect of the 
Applicator who deals as a consumer, as a matter of law under any United Kingdom 
legislation. 

 
(b) 

The Applicator shall promptly notify the Company of any claim against the 
Applicator under any legislation deriving from the European Community Directive 
on Liability for Defective Products 1985.  The Company then shall only be liable to 
the Applicator in the event Products were defective (within the meaning of any such 
relevant legislation) at the time of delivery by the Company and shall not be liable 
to the extent that any liability arises from any act or omission of the Applicator. 

   
5.7 

Without prejudice to any other limitation of the Company's liability (whether effective or 
not): 

 
 

(a) 

in no circumstances whatsoever (including any fault or default of the Company) 
shall the Company be liable for any indirect or consequential losses (including loss 
of goodwill, business or anticipated savings), loss of profits or use, any rectification 

background image

June 2000 

 

- 5 -

costs or, (subject to Clause 5.6 or as provided in the Company’s Conditions of Sale), 
any third party claims, in connection with Products or this Agreement; and 

 
 

(b) 

except as provided under Clauses 5.3 and 5.6 or in the Company’s Conditions of 
Sale in force from time to time, the Company's total aggregate liability under any 
proceedings or law in connection with Products, any specification or this Agreement 
is limited to the cost of Products sold, provided however that this Clause shall not 
affect any written performance guarantee given to the Applicator. 

 
5.8 

 

The Warranty and the Applicator's remedies under Clause 5 are in substitution for 

any other warranties, obligations, representations, liabilities, terms or conditions 
(whether they are express or implied or arise in contract, tort, or otherwise) in 
connection with Products (including, without limitation, any relating to satisfactory 
quality, fitness for purpose, conformity with description or sample, care and skill or 
compliance with representations) which are hereby expressly excluded. 

 
5.9 

           Unless specifically stated otherwise in this Agreement, the Applicator's sole remedy 

shall be in damages.  This Clause 5 applies notwithstanding any fundamental breach 
or breach of a fundamental term of the contract by the Company. 

 
5.10   

The Applicator shall indemnify the Company against any claims or proceedings 
made by any third party and all losses, damages, liabilities, costs and expenses 
which may be suffered or incurred by the Company arising from any act or omission 
of the Applicator. 

 
6. 

Trade Marks and Trade Names 

 

(a) 

Subject to the Applicator being designated Qualified Applicator pursuant to Clause 
1(b) the Company authorises the Applicator to identify itself as a Qualified 
Applicator and to use the marks listed in Schedule B (the "Trade Marks") in 
connection with, and only in connection with, the promotion, advertising, 
merchandising and selling of Products pursuant to this Agreement.  The Applicator 
shall not use the Trade Marks or the names "International Paint Ltd" or "Chartek" in 
its corporate or business name.  Use by the Applicator of the Trade Marks shall at 
all times be subject to the Company's approval. 

 
(b) 

Upon termination or expiry of this Agreement the authorisation granted to the 
Applicator pursuant to Clause 6(a) shall automatically terminate and Applicator 
shall discontinue immediately any and all use of the Trade Marks and shall 
immediately cease referring to itself as [an Applicator] or Qualified Applicator of 
Products.  

 
7. 

Reports and Notices 

 

background image

June 2000 

 

- 6 -

(a) 

The Applicator shall promptly provide the Company with such reasonable financial 
and other information regarding the Applicator as the Company may request to 
enable it to determine the Applicator’s creditworthiness, major shareholders and 
directors. 

 

(b) 

The Applicator shall promptly notify the Company of any changes in its personnel 
associated with the management of contracts for the application of the Products, of 
the leaving of any personnel from the employ of the Applicator who have attended a 
Training School and/or of any changes in ownership of the Applicator. 

 
8. Independent 

Contractor 

 

The Applicator is an independent contractor and shall not be deemed to be an agent, 
employee, partner, joint venturer or franchisee of the Company.  

 
 
9. Term 

and 

Termination 

 

(a) 

This Agreement shall come into effect on [insert commencement date] and, 
subject to Clause 9 (b), shall remain in full force and effect until terminated by 
either party giving to the other not less than 30 days written notice.

 

 

 
(b) 

If any of the following events occur the Company may, at its option, terminate this 
Agreement immediately upon delivery of written notice of such termination to the 
Applicator: 

 

(i) 

if the Applicator shall breach or be in default under any provision of this 
Agreement including, without limitation, any provision of Clause 3; 

 

(ii) 

if Applicator fails to supply any confirmation requested by the Company 
pursuant to Clause 1(b); 

 

(iii) 

if Applicator fails to pay when due any amounts owed by Applicator to the 
Company; 

 

(iv) 

if the Applicator has a petition presented, an order made or a resolution 
passed for its winding up or otherwise enters into liquidation or 
bankruptcy or has a receiver or administrator appointed over any part of 
its assets or makes any composition or arrangement with creditors or 
suffers any analogous act or proceedings under foreign law;  

 
(v) 

if there are any material changes in ownership of the Applicator; or 

 

background image

June 2000 

 

- 7 -

(vi) 

if there shall be any material adverse change in the financial position of 
Applicator which the Company believes, in its reasonable opinion, will 
impair receiving timely and full payment from the Applicator. 

 

(c) 

Termination or expiry of this Agreement shall not relieve the Applicator of liability 
for the payment of the purchase price of Products ordered by the Applicator prior to 
such termination or expiry or of any other liability or obligation of Applicator 
arising under this Agreement. 

 

(d) 

The Company shall not by reason of the termination or expiry of this Agreement be 

liable to Applicator for any compensation for loss of profits or goodwill. 

 

10. Miscellaneous 
 

(a) 

The Applicator shall not assign, sub-contract, transfer or hold on trust for any third 
party all or any part of its rights or obligations under this Agreement without the 
prior written consent of the Company.   

 

(b) 

This Agreement and any document referred to in it contains the entire agreement in 
connection with the appointment of the Applicator and the sale of the Products and 
may only be modified or supplemented by separate written agreement between the 
Company and the Applicator.  All other terms and conditions, express or implied, 
present or historic, are excluded, save in the case of fraud.  Unless expressly and 
specifically agreed in writing to the contrary, the Company will only contract with 
the Applicator on the terms set out in this Agreement and will not accept any 
subsequent terms of the Applicator. 

 

(c) 

This Agreement shall be governed by and construed in accordance with the laws of 
England.  The Applicator agrees, for the Company’s exclusive benefit, that the 
English Courts shall have sole jurisdiction to hear all claims or proceedings 
connected with this Agreement.  The Company may nevertheless bring claims in 
any other Court of competent jurisdiction. 

 
 
 
 
 
 
 

background image

June 2000 

 

- 8 -

 
IN WITNESS WHEREOF, the Company and Applicator have caused this Agreement duly 
executed as of the day and year first above written. 
 
 

 

 

  

Signed  

Signed 

By: ___________________________ 

By: ____________________________ 

For and on behalf of the Company 

For and on behalf of the Applicator 

Print Name: ____________________ 

Print Name: _____________________ 

 
Title: __________________________ 

Title: ___________________________ 

 
 
Signed 
By: ___________________________ 
For and on behalf of the Company 
Print Name: ____________________ 
 
Title: _______________________ 
 

background image

June 2000 

 

- 9 -

 
 
 

SCHEDULE A 

 
 PRODUCTS 
 
 
 
 
CHARTEK

®

 Intumescent Epoxy Fireproofing Products and Systems 

 
HK-1

TM

 Mesh Reinforcement material

background image

June 2000 

 

- 10 -

 
 

SCHEDULE B 

 
 TRADE 

MARKS 

 
 
 

CHARTEK

®

 

 
 

HK-1

TM 

 

background image

[Applicator Name] 

is a Qualified Applicator of Chartek Fireproofing Systems by virtue of having met the requirements of 
certification which include: 

 

1. 

Personnel trained at a Chartek Fireproofing Training School 

2. 

Possession of International Paint, Fire & Insulation Products, 
approved equipment for Chartek application 

3. 

Successful completion of a qualifying Chartek Fireproofing Applicator Contract 

4. 

Maintains a Chartek Fireproofing Quality Assurance Procedure 

5. 

Holds a validated Chartek Fireproofing Applicator Agreement 

 

Furthermore, being a Qualified Applicator, [Applicator Name] assumes full responsibility for applying Chartek 
Fireproofing Systems in accordance with the Chartek Fireproofing Application Manual or other International 
Paint approved procedures and will guarantee workmanship for one year after application. 

 

 

 

 

 

 

 

 

 

Issued by:

   ________________________________________ 

            ?????? 

 

 

 

 

 

 

 

 

 

Issue Date: 

 

Chartek

®  

Fireproofing System 

QUALIFIED APPLICATOR CERTIFICATE 

 

 

 
Local Address

 

 

APPENDIX 3 

background image

This Certificate attests that 

 

[Name] 

 

 

attended a Training School for 

CHARTEK

 Fireproofing Systems 

 

 

on

   [Date]            

at:

  [Location]    

 

 

CHARTEK

®

 FIREPROOFING 

APPLICATOR TRAINING SCHOOL 

 

International Paint Ltd 
Fire & Insulation Products 
Essex House 
141 Kings Road 
Brentwood 
Essex, CM14 4DR 
United Kingdom

 

Certificate No

:  

ICL-[number)

 

APPENDIX 4 

background image

 

 

 

 
 
 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 1 of 27 

 

 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

QUALITY CONTROL MANUAL  

 

FOR CHARTEK

®

 

FIREPROOFING 

SYSTEMS APPLICATION 

 

Rev.3 – 30 January 2006 

 

Prepared by: 

INTERNATIONAL PAINT LTD. 

 

Contact Information 

Region Office 

Address 

Telephone/Fax 

Head Office and  

Europe, Middle East & Africa 

Essex House 
141 Kings Road 
Brentwood 
Essex  
CM14 4DR 
United Kingdom 

Tel: 

+44 (0)1277 229192 

Fax: 

+44 (0 1277 228745 

Scandinavia 

Peter Grøns Gt 2b 
3210 Sandefjord 
Norway 

Tel:  

+47 33 42 72 03 

Fax: 

+47 33 42 72 01 

India, South East Asia & China 

3 Neythal Road  
Jurong Town 
628570 
Singapore 

Tel: 

+65 6663 3050 

Fax: 

+65 6261 8125 

The Americas 

6001 Antoine Drive  
77091 Houston  
Texas 
USA 

Tel: 

+1 713 684 1223 

Fax: 

+1 713 684 1514 

Korea 

17th Floor 
National Pension Building 
#1422-8 Yeonsan-dong 
Yeonje-gu 
Busan 
South Korea 

Tel: 

+82 51 5806150 

Fax: 

+82 52 2342377 

Australasia 

115 Hyde Road  
Yeronga 
Brisbane 
Queensland, 4140 
Australia 

Tel: +61 

738928887 

Fax: +61 

738923642 

 

Websites: 

www.chartek.com

 

www.international-pc.com

  

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

 
 

Q

Q

U

U

A

A

L

L

I

I

T

T

Y

Y

 

 

C

C

O

O

N

N

T

T

R

R

O

O

L

L

 

 

M

M

A

A

N

N

U

U

A

A

L

L

 

 

R

R

E

E

V

V

I

I

S

S

I

I

O

O

N

N

S

S

 

 

R

R

E

E

V

V

.

.

 

 

D

D

A

A

T

T

E

E

 

 

R

R

E

E

V

V

I

I

S

S

I

I

O

O

N

N

 

 

N

N

O

O

T

T

E

E

S

S

 

 

0

0

 

 

2

2

6

6

/

/

0

0

7

7

/

/

2

2

0

0

0

0

1

1

 

 

F

F

i

i

r

r

s

s

t

t

 

 

E

E

d

d

i

i

t

t

i

i

o

o

n

n

 

 

o

o

f

f

 

 

C

C

h

h

a

a

r

r

t

t

e

e

k

k

 

 

Q

Q

u

u

a

a

l

l

i

i

t

t

y

y

 

 

C

C

o

o

n

n

t

t

r

r

o

o

l

l

 

 

M

M

a

a

n

n

u

u

a

a

l

l

 

 

b

b

y

y

 

 

I

I

n

n

t

t

e

e

r

r

n

n

a

a

t

t

i

i

o

o

n

n

a

a

l

l

 

 

P

P

a

a

i

i

n

n

t

t

 

 

L

L

t

t

d

d

.

.

 

 

1

1

 

 

0

0

1

1

/

/

1

1

2

2

/

/

2

2

0

0

0

0

4

4

 

 

F

F

i

i

r

r

s

s

t

t

 

 

r

r

e

e

v

v

i

i

s

s

i

i

o

o

n

n

 

 

2

2

 

 

0

0

4

4

/

/

0

0

2

2

/

/

2

2

0

0

0

0

5

5

 

 

S

S

e

e

c

c

o

o

n

n

d

d

 

 

r

r

e

e

v

v

i

i

s

s

i

i

o

o

n

n

 

 

3

3

 

 

3

3

0

0

/

/

0

0

1

1

/

/

2

2

0

0

0

0

6

6

 

 

T

T

h

h

i

i

r

r

d

d

 

 

r

r

e

e

v

v

i

i

s

s

i

i

o

o

n

n

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IMPORTANT NOTE: 
The present Quality Control Manual is verified by the Technical Engineering Manager, Oil, Gas, Fire & 
Insulation, International Paint Ltd. From the date of approval the contents of the manual are to be considered 
effective. 
 
The registration of the verification and approval of every edition of the manual and the original document are 
held in the archives of the Head Office, which has the responsibility of conserving the document in its 
approved state and of distributing copies that conform to the last deposited revision.  The previous editions 
are also held in the archives, separately, and conserved for possible consultation. 
 
The original language of the manual is English. In the event of discordance with successive translations, the 
company and addressees of the manual must make reference to the English edition. 
 
This Manual is available to customers and applicators on a non-controlled basis with the aim of providing 
consistent information to all parties involved in the quality control aspects of Chartek fireproofing system.s 

 

Unauthorized changes or reproduction of the manual are forbidden. 

 
 
 
 
 
 
 
 
 
 
 
 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

 

LIST OF CONTENTS 

 

Paragraph 

Title 

Page 

1.0 Introduction 

2.0 Personnel 

and 

responsibilities 

2.1 Project 

Manager 

2.2 Site 

Supervisor 

2.3 

Site Quality Control Inspector 

2.4 Site 

Foreman 

2.5 Application 

crew 

2.6 

Typical site organization 

3.0 Record 

keeping 

4.0 Operating 

procedures 

4.1 

Scope of work 

4.2 Sample 

preparation 

4.3 Work 

start-up 

4.4 Environmental 

conditions 

4.5 Pin 

installation 

4.6 Substrate 

preparation 

4.7 Priming 

procedure 

4.8 Meshing 

4.9 Masking 

4.10 Storage 

conditions 

4.11 Solvented 

application 

4.12 Solventless 

application 

4.13 Coating 

thickness 

10 

4.14 Surface 

finish 

10 

4.15 Final 

inspection 

11 

4.16 Repair 

procedure 

11 

5.0 

Inspection equipment requirements 

11 

5.1 

Wet film thickness 

11 

5.2 

Dry film thickness 

11 

5.3 

Dry film thickness 

11 

5.4 Substrate 

temperature 

11 

5.5 Ambient 

conditions 

12 

5.6 Chartek 

temperature 

12 

6.0 

Technical service audits 

12 

Appendices  

 

Quality Control Form (example)  

 

B Daily 

Log 

(example) 

 

Daily Equipment Log (example) 

 

Technical Service Audit Report Form 

 

 
 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

 
 
 
 
 
1.0 INTRODUCTION 

 This Manual describes the quality control activities required by International Paint 
Ltd. for the application of Chartek fireproofing systems and may be used by 
applicators as a guideline on which to base their own quality control procedure. 

 

The manual also includes recommendations for site organisation with descriptions 
of relevant key roles and responsibilities. The personnel described are appointed 
and employed by the Client or his appointed sub-contractor and not International 
Paint Ltd. These are intended as guidelines and are based on our experience of 
successful project organisation.  Actual site organisation must be defined by those 
parties with contractual project authority and responsibilities.  

 

Both fire protection performance and pre-fire durability critically depend on the 
correct application of the fireproofing system.  The scope of the present Quality 
Control Manual is to define the minimum control activities required to verify that the 
work is carried out in accordance with the Chartek Application Manual, which should 
be referred to for full application instructions.

 

 

 

When required contractually, parts or all of the Quality Control Manual can be 

considered an integral part of the project documentation. 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

 
2.0 

PERSONNEL AND RESPONSIBILITIES 

 
2.1 Project 

Manager 

The Project Manager is responsible for ensuring the completion of all work in 
conformance with contractual requirements. The Project Manager should be in 
possession of and fully acquainted with both the relevant Chartek Application 
Manual and the present Quality Control Manual. The Project Manager should have 
the authority necessary to guarantee the safe and correct management of the site 
and productive processes. 

 
2.2 Site 

Supervisor 

The Site Supervisor is responsible for organising the practical work operations 
including daily planning, materials supply and storage and checking on progress. 
The Site Supervisor has direct responsibility for the quality of the work carried out 
and must therefore have successfully completed a Chartek Training School. Both 
the Training School certificate and the relevant Chartek Application Manual should 
be in the Site Supervisor’s possession at the work site. 

 
2.3 

Site Quality Control Inspector 
The Site Quality Control Inspector is responsible for implementing on a daily basis 
all the QC checks described in this manual and the project QC plan, where 
applicable. The Site Quality Control Inspector must have successfully completed a 
Chartek Training School and be in possession of both the Training School certificate 
and the relevant Chartek Application Manual at the work site. 
 
The Site QC Inspector is also responsible for the accurate completion and final sign 
off of all required QC forms and reports. 
 
Additional responsibilities include ensuring International Paint Ltd. (Fire & Insulation 
Products) technical service audit requirements are completed, documented and 
available for consultation. This is particularly important with regard to corrective 
actions agreed by the contractual parties on non-conformances.  
 
The Site QC Inspector should have the necessary expertise to correctly evaluate 
the quality of the work and is responsible for bringing any non-conformances to the 
immediate attention of the Project Manager. 
 
NOTE:  Depending on the size of the project, one individual may hold more than 
one of the positions outlined above. 

 
2.4 Site 

Foreman 

The Site Foreman’s responsibilities are to carry out the daily supervision of work 
teams with the aim of achieving conformance of the application to the relevant 
specifications. 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

 
2.5 Application 

Team 

Any workers not in possession of a Chartek Training School certificate shall be 
trained in and documented to be capable of the operations required of them. 

 
2.6 

Typical Site Organisation 
 
The organization of the production sites varies on the basis of different factors 
(entity of the contract, location of the site, contractual, organizational and technical 
requirements etc.). The following chart shows a typical site organisation.    

 

 
 
3.0 RECORD 

KEEPING 

Records shall be produced and maintained covering the progress of a project. With 
good records a reference is available if documentation review is required for any 
reason at a later date. Such documentation can help to demonstrate that the work 
was carried out in accordance with the specifications. 
 
Generally three types of records are used. The first is a quality control form in which 
details of work carried out in a given area are recorded according to when each step 
was completed and accepted.  The second and third are daily logs to record 
personnel, weather conditions, material consumption, surface areas completed and  

TYPICAL WORK SITE ORGANISATION

QUALITY CONTROL

INSPECTOR

SITE SUPERVISOR

ASSISTANTS

(GENERAL SERVICES)

MACHINE OPERATOR

ROLLERS

(AND MESH INSTALLERS)

TROWELLERS

(AND MESH INSTALLERS)

SPRAYER

SITE FOREMAN

WORK TEAM "A"

ASSISTANTS

(GENERAL SERVICES)

MACHINE OPERATOR

ROLLERS

(AND MESH INSTALLERS)

TROWELLERS

(AND MESH INSTALLERS)

SPRAYER

SITE FOREMAN

WORK TEAM "B"

PROJECT

MANAGER

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

equipment details.  Examples of each of the three types are shown in Appendices 
A, B and C.  These examples are provided as guides only and Contractors may 
choose to adapt them to each specific contract.  Documented quality records are a 
requirement of the ISO 9002 quality system standard and International Paint’s 
Technical Service Audit Programme. 

 
4.0 OPERATING 

PROCEDURES 

 
4.1 

Scope of work  
The process of Chartek fireproofing application consists of but is not limited to: 
surface preparation (normally and ideally by abrasive blast cleaning); priming with 
an approved paint product; installation of mesh reinforcement (either International 
Paint’s patented HK-1

TM

 hybrid carbon/glass mesh or galvanised wire mesh); 

masking where necessary; spraying, trowelling and rolling of Chartek; topcoating if 
required and demasking. 

 

Two processes of spray application can be used. For all medium to large scale jobs 
(i.e. greater than 100m

2

 surface area) the recommended process is spraying 

Chartek with solventless, plural component airless equipment. For smaller 
applications premix solvented application with either single leg airless or modified 
conventional airspray equipment may be used. In all cases, the equipment must be 
qualified by International Paint Ltd. 

 
4.2 Sample 

preparation 

Prior to the start up of actual production work an approved sample or a sample area 
will be coated with Chartek in accordance with the project specifications. This 
sample should be representative of the work to be carried out throughout the 
project. 
 
The sample or sample area will then be approved and signed off by the owner’s 
representative, applicator’s representative, fabricator’s representative, International 
Paint’s Technical Service Engineer and any other party as required by the contract 
for the quality of surface finish and conformance with the relevant procedures and 
specifications. 

 
4.3 Work 

start-up 

The Project Manager and Supervisor will obtain a release document from the 
owner’s representative for a given area of the structure to start work on. 

 
4.4 Environmental 

conditions 

Environmental conditions are very important for every aspect of the Chartek 
application system. Since Chartek is an epoxy-based material strict adherence to 
environmental parameters is required to obtain optimum performance and 
application conditions.  
 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

Environmental conditions for blasting and priming must be in accordance with the 
primer manufacturer’s written instructions.  Environmental conditions for the Chartek 
system application are outlined in the respective sections of the Application 
Manuals for each process. These conditions should be recorded on an hourly basis 
since conditions can vary considerably depending on location. Record daily 
environmental conditions in the form provided in Appendix B. 

 
4.5 Pin 

installation 

When applicable (for example for NORSOK referenced projects), pin installation 
shall be carried out in accordance with the procedure described in the Chartek 
Application Manual. 
 
A 20-pin bend test shall be carried out and documented daily before production 
begins.  The 20 pins shall be bent from 90º to 45º and back with respect to the 
surface plane. If more than one pin fails, the test will be considered a failure and 
another 20 pins shall be welded using different machine settings and tested. If the 
second test fails, advice should be sought from the welder manufacturer or an 
International Paint Ltd, Technical Service Engineer.  Pins that have not failed in the 
failed test do not have to be removed. Once a successful test has been carried out 
and documented production pinning can begin.  If the welding equipment is 
modified during the day an additional test may be required to verify that the settings 
are still valid. 

 
4.6 Substrate 

preparation 

Substrate preparation shall be carried out in accordance with the procedures 
described in the Chartek Application Manual.  
 
The cleaning grade (for example, Sa 2 ½ according to ISO 8501-1) and blast profile 
shall be documented and accepted prior to priming as per Appendices A and B. 
 
If the Chartek applicator does not actually perform the blasting and priming, the 
applicator is responsible for verifying the conformance of surface preparation and 
primer with the Chartek Application Manual requirements by means of either 
suitable QC documentation or first hand testing and inspection. 

 
4.7 Priming 

procedure 

Priming of the substrate shall be carried out in accordance with the procedures 
described in the Chartek Application Manual. 
 
Only primers on the “Chartek Fireproofing Qualified Primer Systems” list may be 
used, unless written authorisation from International Paint is obtained for another 
primer system. 
 
Documentation for the primer system shall consist of primer name, type and applied 
thickness on a daily basis as per Appendices B and C. 

 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

 
4.8 Meshing 

Mesh reinforcement shall be installed in accordance with the procedures described 
in the relevant Chartek Application Manual. 
 
Documentation of the mesh system used shall include mesh type, size, attachment 
means and standoffs (not applicable for HK-1

TM

 hybrid carbon/glass mesh). 

 
4.9 Masking 

Any surfaces or equipment in the spraying areas that do not require fireproofing 
must be masked off using tarpaulins or equivalent. 
 
Regardless of the structural configuration being protected, overspray is always a 
concern. Quality control includes the aesthetics of the finish and protection of areas 
outside the termination points of the applied Chartek. 

 
4.10 Storage 

conditions 

Chartek storage conditions are outlined in the Application Manual, which contains 
instructions for long-term storage, preparation storage for premix solvented and 
plural component solventless spray application. 
 
The storage requirements are specifically designed to optimise material 
performance and ease of application. 
 
Daily temperature recordings shall be documented for each applicable storage site 
and should include both ambient and actual core sample temperatures as per 
Appendix B. 

 
4.11 Solvented 

application 

Solvented application shall be carried out in accordance with the procedures 
outlined in the Chartek Application Manual. 
 
Documentation shall include but not be limited to: environmental conditions; 
equipment type; material temperature; solvent type and amount; coating thickness; 
location of area sprayed; material batch numbers (all as per Appendices A, B and 
C). 

 
4.12 Solventless 

application 

Solventless application shall be carried out in accordance with the procedures 
outlined in the Chartek Application Manual. 
 
Documentation shall include but not be limited to: environmental conditions; 
equipment type; material temperatures; tank temperatures; heater temperatures; 
line temperature; gun exit temperature; spray pressures for each component; 
coating thickness; location of area sprayed; material batch numbers (all as per 
Appendices A, B and C). 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

 
With solventless hot spray equipment, mixing of the two components is 
automatically achieved at the correct ratio by the displacement pumps. 
Furthermore, solventless spraying reduces curing times and improves the overall 
efficiency and quality of the Chartek application. For these reasons, International 
Paint strongly recommends the use of this type of equipment. Although most 
machines incorporate off-ratio detection devices, actual ratio checks by weight 
should be taken before start-up of spraying.  
 
Reference should be made to the ratio parameters included in the relevant Chartek 
Application Manual. In addition to the ratio checks by weight, constant checking of 
the displacement pump pressure gauges and the colour of the mixed Chartek 
should be carried out by the sprayer and machine operator respectively.  Ratio 
checks should be made at the commencement of each work shift or more frequently 
as demanded by the project application schedule. 

 
4.13 Coating 

thickness 

The correct measurement of the fireproofing system thickness is critical to 
guaranteeing conformance with the project specification and the following criteria 
should be strictly adhered to. 
 
A. Method for measuring wet Chartek thickness 
The recommended method of measuring wet thickness is to use a pre-cut bridge 
gauge having a width of approximately 25mm (typically made from a putty knife). 
Notch or pin gauges are not acceptable because they limit the measurement to one 
point. The gauge should just touch the rolled Chartek surface. We strongly 
recommend the continuous use of the bridge gauge by all members of the 
application team from the sprayer to the troweller to the roller. In this way you can 
be assured of reaching the design thickness over the whole surface.

 

 

B. Method of measuring dry Chartek thickness 
Dry thickness can be measured by either of the following methods: 
¾  drilling a small hole approximately 2mm in diameter and checking the Chartek 

thickness with a depth gauge (care must be taken not to damage the substrate 
and to refill the holes with Chartek as soon as possible); 

¾ 

using an electromagnetic thickness gauge (care must be taken to correctly 
calibrate the gauge immediately before taking any readings).  This method 
cannot be used if the Chartek is reinforced with wire mesh.

 

 
NB: Chartek fireproofing ratings that are certified by Approval Authorities generally 
require that the specified passive fireproofing thickness is to be the minimum 
application thickness. It is recognized, however, that the applied Chartek layer will 
never be perfectly even and that areas of lower than design thickness (“valleys”) are 
compensated by areas of higher than design thickness (“peaks”). Unless specifically 
stated otherwise in the project documentation, the minimum acceptable thickness at 
any point shall not be less than 85% of the design thickness up to a maximum of 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

1.5mm less than the design thickness. In other words, for thicknesses up to and 
including 10mm the minimum allowable thickness is 85% of the design thickness. 
For thicknesses above 10mm the minimum allowable thickness is the design 
thickness less 1.5mm.

  

 

 
Thickness readings should be accurately recorded as per Appendices A and B. 

 
4.14 Surface 

finish 

The quality of surface finish should be agreed on by all the parties involved before 
project start-up.  Surface finish throughout the project is rated as acceptable or 
unacceptable as compared to the sample reference. 

 

 
 Although surface finish may not hinder the fire performance of Chartek

 

it leaves a 

lasting impression of the quality of both material and applicator. The highest quality 
goes into Chartek from manufacturing to application in accordance with ISO 9000 
standards. Therefore, reasonable care should be taken to achieve the highest 
standard possible and due consideration given to specific requirements stated in 
project documentation. 

 
4.15 Final 

inspection 

After all QC documentation is submitted, final inspection will be carried out by the 
owner’s representative, applicator’s representative, fabricator’s representative, 
International Paint’s Technical Service Engineer and any other party as required by 
the contract. Areas will then be signed off for acceptance or repairs noted and 
carried out as per Appendices A and B. 
 
A 100% visual inspection should be performed to ensure there is no exposed mesh, 
debonding at terminations or bubbles below the surface layer of Chartek. 
 
Physical inspection consists of measurement of dry film thickness of the Chartek 
system and tapping to detect possible hollow areas or delamination between 
sprayed layers of Chartek not easily visible. 

 
4.16 Repair 

procedure 

Repair procedures are described in the Chartek Application Manual. 
 
The same tests and inspections described above and summarised in the 
Appendices A, B and C apply equally to repair applications. 
 
For unusual repair situations contact International Paint Technical Service for 
written instructions. 

 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

5.0 

INSPECTION EQUIPMENT REQUIREMENTS 

 
5.1 

Wet film thickness (bridge gauge) 
A bridge gauge is used to check wet Chartek thickness during application. It is 
easily made by cutting a 25mm wide piece of metal to the desired thickness and 
continually sticking it into the Chartek while wet.  The gauge should be used by all 
members of the application team (sprayer, troweller and roller). 
 

5.2 

Dry film thickness (mechanical depth micrometer) 
A mechanical depth micrometer is required to inspect cured Chartek for thickness 
measurements.  It is recommended that a gauge with a narrow barrel is utilised with 
a range from 0–100mm. 

 
5.3 

Dry film thickness (electronic thickness gauge) 
This type of gauge is used to measure the thickness of dry coatings on steel 
substrates. It can be used to measure both the primer and Chartek dry film 
thickness (but not if metal mesh is used as the reinforcement system as this will 
give erroneous readings with the electro-magnetic type gauge).  Care should be 
taken to calibrate the instrument on a polished steel plate with calibrated shims of 
similar thickness to the coating to be measured before each use. 

 
5.4 

Substrate temperature (surface thermometer) 
A thermometer should be used to measure the surface temperature of the substrate 
immediately before Chartek is applied.  It should be calibrated to the manufacturer’s 
specification and should have a range of 0-100ºC. 

 
5.5 

Ambient conditions (sling psychrometer, hygrometer, air thermometer) 
Reliable intrumentation should be used to record air temperature and relative 
humidity.  We recommend the use of a sling psychrometer as it is a simple but 
reliable and robust instrument. It consists of two thermometers in a frame one of 
which has a wet bulb and the other a dry bulb.  The wet bulb gauze draws 
demineralised water during whirling and the temperature of the evaporating water is 
read off the wet bulb thermometer scale.  The dry bulb measures air temperature. 
Whirling should continue for at least 60 seconds before first readings are taken. 
Acceptable readings are those taken at 20-30 second intervals after the first check. 
The wet and dry readings are then read off a circular or slide rule guide to give the 
relative humidity value.  The dew point temperature can then be calculated in 
relation to air temperature and relative humidity.  
 
Environmental parameters are described in the Chartek Application Manual but as a 
general rule the air temperature should always be above 10ºC, relative humidity 
should be less than 85% and the substrate temperature should be at least 3ºC 
above the dew point temperature during application and for a period of 2 hours after 
application. 

 
 

background image

 

 

 

 

ID Rev. 

Date 

QC MAN GB 

30/01/06 

Chartek

®

 QC Manual 

Page 13 of 14 

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

5.6 

Chartek temperature (digital thermometer/bi-metal thermometer) 
These thermometers are used to record Chartek temperatures during storage and 
application. They should be calibrated to the manufacturer’s specification. 
Recommended Chartek temperatures are detailed in the Application Manual. 

 
6.0 

TECHNICAL SERVICE AUDITS 
In addition to the forms and records produced by the qualified applicator, copies of 
the International Paint Technical Service Audit Report and Non-Conformance 
Report (if raised) shall also be maintained. These reports will be supplied by an 
International Paint Technical Service Engineer. 
 
The Technical Service Engineer and the applicator’s QA/QC representative will sign 
each report generated. Copies of reports will be distributed by the Technical Service 
Engineer to the applicator’s QA/QC representative on site and the owner’s 
representative at the end of each Technical Service Engineer’s visit. Additional 
copies will be distributed to respective agencies as required by the project 
specifications. 
 
The maintenance of these records is important in that a history of audits is 
documented for each project. Follow-up audits may require reference to verify that 
requested remedial action has been successfully completed, or situations may arise 
where past audut history requires review. 
 
Reference Appendix D for instructions on how to complete the Technical Service 
Audit Report.

background image

 

 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

CHARTEK

®

 FIREPROOFING – AREA QUALITY CONTROL REPORT 

 

Project:   

 

 

 

 

Owner: 

Owner’s representative: 
 

Applicator’s representative: 

Area identification:  see attached drawing 
 
Report Nº:           XXX   - A 
                                                     

Date: 

Prepared by:   

 

 

OPERATION 

DATE 

Nº TEST ACTIVITY  

(see QCP nº XXX) 

 

SIGNATURE 

SITE MANAGER/QC 

COMMENTS 

BLAST CLEANING-PRIMER-MASKING 
Blast cleaning-primer   

 

 

 

Acceptance of 
surfaces 

 

 

 

 

Masking  

 

 

 

Sample area 

 

 

 

 

CHARTEK APPLICATION-MESHING 
1st Coat 

 

 

 

 

Mesh installation 

 

 

 

 

2nd Coat 

 

 

 

 

TOPCOAT  
1st Coat 

 

 

 

 

2nd Coat 

 

 

 

 

 

 

 

 

 

NOTES 
 
 
 

AREA COMPLETE 
 
Applicator:    

Signature: 
 
 

Name: 

Owner:  

Signature: 
 
 

Name: 

 

APPENDIX A

background image

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

CHARTEK

®

 FIREPROOFING DAILY LOG 

 

 
Project:   

 

Owner:     
 

 

 

Owner’s representative:   
 

Applicator’s representative:   

Area identification:  see attached drawing 
Report Nº:              XXX  - B 
                                                     

Date: 

Prepared by:   

 

PERSONNEL 
Site Manager:    
Site QA/QC Manager:  
Sprayers-trowellers:   
Owner’s QC Inspector:   
ENVIRONMENTAL CONDITIONS (to be recorded every hour) 
Time  

 

 

 

 

 

 

 

 

Ambient temp. 

 

 

 

 

 

 

 

 

Relative 

humidity 

 

        

Dew point 

 

 

 

 

 

 

 

 

Substrate 

temp. 

 

        

MESH INSTALLATION 
Mesh installed (type and surface area in m

2

): 

Edge mesh (Charlok) installed (linear metres): 

CHARTEK STORAGE TEMPERATURE 

Part A 

Part B 

CHARTEK APPLICATION 

Ratio 
(% in weight)   

 A.M.   Part A                  Part B 

P.M.    Part A               Part B 

SPRAY EQUIPMENT ID (type and serial number): 
 
ID areas coated 
(if different from drawing) 

 
 

 

 

 

 

 

Specified thickness (mm) 
 

 

 

 

 

 

 

Thickness applied to date 
 

 

 

 

 

 

 

Thickness applied today 
 

 

 

 

 

 

 

Surface area coated (m

2

 ) 

 

 

 

 

 
 

 

 

Chartek

 

quantity used (no. of kits) 

Part A                    Part B  

Solvent used : 
Type                                  Quantity (lt.) 

CHARTEK BATCH NUMBERS 
Part A: 
Part B: 
NOTES 
Signature Site Manager-Site QA/QC Manager: 
 
 

APPENDIX B 

background image

 

 

©International Paint Limited, 2006 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 

 

CHARTEK

®

 FIREPROOFING EQUIPMENT QUALITY CONTROL REPORT 

 
Project:   

 

 

 

 

Owner: 

Owner’s representative: 
 

Applicator’s representative: 

Area identification:  see attached drawing 
 
Report Nº:           XXX   - C 
                                                     

Date: 

Prepared by:   

 
 
PLURAL COMPONENT SYSTEM 
Machine type        
  

 
 

Hose length 
  

 
 

Preloading Chartek temperature 
 

Part A:                                    

Part B: 

Tank temperatures 
 

Part A: 

Part B: 

Tank pressures 
 

Part A: 

Part B: 

In-line heater temperatures 
 

Part A: 

Part B: 

Displacement pump pressures 
(at cylinder exit) 
 

Part A: 

Part B: 

Line heat 
 

 

Gun exit temperature 
 

 

Spray gun 
 

Tip size (1/1000”): 
 
 

Fan size (mm): 

 
 

NOTES 
 
 
 
 
 
 
Signature Site Manager-Site QA/QC Manager: 
 
 
 

APPENDIX C

background image

 

 

 

COMPLETION OF THE TECHNICAL SERVICE AUDIT REPORT 

 

The Technical Service Audit Report is a site-generated report prepared by an International 
Technical Service Engineer.  It serves one or more of the following purposes: 

 

1.  To demonstrate that International monitors on an ongoing basis the application of Chartek 

fireproofing and, where appropriate, to meet contractual requirements for such monitoring 
activity. 

2.  To record specific details regarding Chartek fireproofing projects. 

3.  To generate a database for non-mandatory procedures and processes. 

4.  To record application details that were found to be in conformance with project and/or 

International requirements during the audit by the International Technical Service Engineer. 

5.  To identify non-conformances with project and/or International recommended procedures 

and requirements. 

6.  To measure the level of quality control utilised by Applicators. 

 
PROCEDURE 

A major responsibility of International Technical Service Engineers is to monitor the application 
of Chartek fireproofing.  On a visit to an application site, the Technical Service Engineer will 
audit procedures/practices used prior to his visit to ensure conformance with project and/or 
International recommended procedures and requirements.  These steps may include, but are 
not limited to, core drilling of previously applied Chartek to check for thickness, the presence of 
uncured material, contaminated interfaces between Chartek layers, the required and proper 
installation of mesh, availability of inspection/application logs, primer thickness requirements, 
and other steps. 

Though the bulk of his time at a site will be spent with Applicator personnel, upon arrival, the 
International Technical Service Engineer will advise the Constructor’s/Fabricator’s 
representative and the Client representative that he is present, how long he expects to be on 
site, and the purpose of his visit.  He will also indicate that before leaving he will complete a 
Technical Service Audit Report and that a copy would be available for both the 
Constructor/Fabricator and the Client.  If either, or both, decline to receive copies, the 
International Technical Service Engineer will so indicate on the report. 

Prior to departure from the site, the International Technical Service Engineer will provide a copy 
of the completed and signed-off Audit Report to the Applicator’s site and Quality Control 
Supervisors, as well as the Constructor’s/Fabricator’s and Client’s representatives, as required.  
Distribution to other recipients will be made as soon as conveniently possible, but no later than 
five days from departure from the site. 

APPENDIX 6 

background image

 

 

Completing the Form and Discrepancies 

The key for completing the Technical Service Audit Report is as follows: 

1. 

Report Ref. (number) - assigned by Technical Service personnel.  The report number 
will consist of three alphabetic letters which identify the project, followed by three 
numbers which are used to indicate the sequential number of the report for the project. 

2.   Report 

By – the Technical Service Engineer’s name. 

3.   Date – the date/dates of the visit. 

4. 

The Project Name – typically the owner’s/operator’s name followed by the unit’s 
designation (Shell Nigeria ‘A’) or module description (number and/or type, e.g. Process 
Module 6). 

5.   Construction/Fabricator- self explanatory. 

6. 

Constructor/Fabricator Representative – the person from the Constructor/Fabricator 
responsible for the fireproofing installation.  The person may be an inspector, 
painting/fireproofing supervisor, engineer, or have another title.  If the responsible 
individual is not available or declines to receive a copy of the Audit Report, “Unavailable” 
or “Declines Copy” should be noted in the box. 

7.   Client’s 

Inspector – Owner’s/Operator’s representative. 

8.   Applicator – the name of the application contractor. 

9.   Site 

Supervisor – the Applicator’s senior employee on the site. 

10.  

Site QA/QC Supervision – the Applicator’s QA/QC employee on the site. 

11.  Other 

– other key Applicator employees at the site. 

12.  Other – other Applicator QA/QC employees on site. 

 

13. 

Airless/Solventless Spray Machine – the quantity and manufacturer and type of such 
machines in operation. 

14.  Conventional 

Pump – the quantity of machines, air motor size and foot ratio (e.g. 70:1). 

NOTE: 

Failure to utilise approved equipment will result in the request by the International 
Technical Service representative to cease work until approved equipment is provided.  
Use of non-approved equipment will be noted on the Audit Report form and immediately 
notified to the  Engineering Manager and Regional Manager. 

background image

 

 

 

15.  Temperature – the ambient temperature range. 

16.  Humidity – the relative humidity range. 

NOTE: 

Application of Chartek when relative humidity in the application area exceeds 85% shall 
be deemed a non conformance. 

17.  Steel 

Temperature – the temperature of the steel being fireproofed. 

18. 

Condition of Storage of Chartek Fireproofing – the conditions of storage should be 
noted. 

NOTE: 

Storage of Chartek must be in compliance with the current Chartek Application Manual. 

19. 

Area Quality Control Reports used – if area quality control reports are not being used, 
indicate the nature of the documentation the Applicator is using to prove he is complying 
with the project specification. 

20. 

Area(s) Audited - the areas audited during the visit.  It could be identified by drawings 
attached to the Audit Report, truss row designation, elevations, etc. 

21. 

Location of Sample Area – if at all possible, the sample area must be part of the 
structure being fireproofed, not a separate construction. 

22.  Chartek 

Thickness – measured thickness of the sample area. 

23.  Accepted 

By – self explanatory. 

24. 

Finish or Sample Area – an objective comment on the acceptability of the surface finish 
and whether it is representative of what can be achieved on the project. 

Note: sample areas are strongly recommended for future reference as an acceptable 
standard of installation and finish. 

25.  

Mesh Attachment Means – pinned wire mesh or unpinned HK-1. 

 NOTE: 

 

Where HK-1 is referred to, this also includes HK-1 (M). 

26.  

If Pins, When Installed – after or before blasting. 

27. 

Weld Integrity Verification – logs or actual tests performed by International Technical 
Service Engineer or in his presence by Applicator personnel. 

28. 

Profile or Blast Finish – Swedish Standard, NACE, or SSPC designation or, 
alternatively,  profile depth. 

background image

 

 

29.  Performed 

By – the company who prepared the substrate. 

30. 

Verification – the means by which the profile or blast finish is verified.  Verification may 
take the form of constructor or applicator logs, imprints etc. 

NOTE: 

When surfaces are not prepared in accordance with International requirements 
notification of a non conformance will be made. 

31.  

Primer Materials – the brand name and type of the primer materials. 

32. 

Verification – the means of knowing that the materials used are in fact what is reported.  
It can be logs, primer supplier certifications, cans on site, etc. 

NOTE: 

Application of Chartek over a non approved primer system will result in a non 
conformance  

33. 

 Primer  Thickness – the range of thicknesses and the appropriate number of 

measurements taken. 

34.  Verification 

– 

the individual who made the measurements. 

NOTE: 

Application of Chartek over a primer system whose thickness exceeds International 
requirements system will result in a non conformance. 

35.  

Mesh Coverage and Stand-offs – self explanatory. 

NOTE: 

Failure to apply mesh (or stand-off if required) in accordance with requirements is an 
observation prior to application of Chartek and a non conformance if Chartek material is 
applied. 

36. 

Conditions of Surface when Chartek is Applied – surfaces must be clean, dry and free of 
contaminants.  Recommended coating intervals must be observed, or surfaces must be 
reprepared. 

37. 

Solvent Used – solvents used for both mixing (if conventional equipment is used) and 
rolling. For single leg spray equipment note amount of solvent per kit. 

NOTE: 

Use of a non-approved solvent will result in a non conformance. 

38. 

Machine – indicates machine number.  If operation of more than three machines is 
audited, a second form is to be used. 

39. 

Ratio Check – the percentage of each part is to be listed based on actual 
measurements or review of ratio logs. 

background image

 

 

40.  

As 39 above. 

NOTE: 

Failure to maintain a ratio log or continued spraying when ratios are outside the 
allowable range system will result in a non conformance. 

41.  Batch 

Nos. – self explanatory. 

42.  Batch 

Nos. 

– self explanatory. 

43.  Tank 

Temperatures – the temperature setting in the hold tanks. 

NOTE: 

Tank temperatures must not exceed 70

o

C. 

44.  

In-Line Heater Temperatures – self explanatory. 

NOTE: 

In-line heater temperatures must not exceed 70

o

C. 

45.  Delivery 

Pressure – the pressure developed at the pump foot. 

46.  Line 

Heat – the temperature setting for the delivery hose lines. 

47.  

Gun Exit Temp. – the temperature of the product exiting the gun. 

48.  Tip 

Size – the tip designation. 

49. 

Fan Dimension – the shape of the fan, the fan width and the distance of the gun from 
the object.  For example, ¼, ½ metre. 

50.  Spray 

Line 

Length – self explanatory. 

51. 

Initial or Intermediate Coats – any surface anomalies which, if not corrected, will cause 
unacceptable surface finish conditions should be noted. 

52. 

Surface Finish – a reasonable description of the surface finish appearance of the work 
completed to date.  A grade of 1-5, with 5 being the optimum, should be assigned.  
Areas which can be improved and thus lead to an overall increase in the grade should 
be noted.   

53. 

Thickness Measurement Specification – thickness compared to the actual measured 
thickness. 

54.  

As 53 above

NOTE: 

Application of less than the specified thickness is will result in a non conformance. 

55.  Topcoat 

Material – the brand name and type of topcoat. 

background image

 

 

56. 

Topcoat Thickness – the dry film thickness of the topcoat or recorded usage rate (m

2

/l 

or ft

2

/gal). 

57. 

Safety Observations – any obviously unsafe practices being used should be noted.  
Lack of eye protection, safety shoes, skin protection and other personnel protection 
equipment, improper use of solvent or equipment, etc. should be noted. 

58.  

Application Manual On-Site – self explanatory. 

NOTE: 

Failure to have an up to date (or a project-specific) International Application Manual will 
result in a non-conformance. 

59.  

QC Manual On-Site – self explanatory. 

NOTE: 

Failure to have an International QC Manual on-site system will result in a non 
conformance. 

60. 

Observations – comments and suggestions regarding procedures used and suggested 
alternatives which may be to the benefit of the Applicator or ultimately the Client.  
Observations can include practices or procedures which, if not corrected prior to 
completion of work in a specific area, may result in a discrepancy.  Observations falling 
into this latter category will be reported in a separate Technical Service 
Non-Conformance Report. 

61. 

Discrepancies – a brief description of the discrepancy and a reference to the Technical 
Service Non-Conformance Report Number. 

62. 

Comments – suggestions which may result in productivity, surface finish improvements, 
or general notes. 

63.  

Discrepancies advised to Site Manager/Supervisor, Yes/No – circle as applicable. 

64.  

Indicate (circle as applicable) if an FSNR was generated and provide number(s). 

65.  

Sign-offs for report. 

 

background image

 

 

TECHNICAL SERVICE AUDIT REPORT 

REPORT REF.: 

(1)

 

REPORT BY  : 

(2)

 

CHARTEK: 

  4 7 1709 

DATE 

:   

(3)

 

PROJECT: 

(4)

 

GENERAL CONTRACTOR/FABRICATOR: 

(5)

 

GENERAL CONTRACTOR/FABRICATOR INSPECTOR: 

(6)

 

CLIENT'S INSPECTOR: 

(7)

 

APPLICATOR:  

(8)

 

KEY APPLICATOR PERSONNEL AT SITE: 

SITE SUPERVISOR: 

 (9)

 

  

 SITE  QA/QC  SUPERVISOR: 

(10)

 

OTHERS:  

(11) 

  

  

  

OTHERS: 

(12)

 

 

 

SPRAY EQUIPMENT AT SITE: 

AIRLESS-SOLVENTLESS SPRAY MACHINE:

 

(13)

 

 

SINGLE LEG MODIFIED PUMP (68-74:1):

 

(14)

 

IS 

SPRAY 

BEING 

DONE 

INSIDE? 

    YES 

  NO 

WEATHER: 

TEMPERATURE: 

(15)

 

 HUMIDITY: 

(16)

 

 STEEL TEMPERATURE: 

(17)

 

CONDITIONS OF STORAGE OF CHARTEK FIREPROOFING: 

 

(18)

 

 

AREA QUALITY CONTROL REPORTS BEING USED? 

  

YES  

(19)

  

 

NO 

IF NO, PROVIDE DETAIL: 

 

 

AREA(S) AUDITED: 

(20)

 

 

 

 

SAMPLE AREA: 

LOCATION OF SAMPLE AREA:  

(21)

 

CHARTEK THICKNESS: 

(22)  

ACCEPTED BY:   

(23)

 

 

OWNER  

CONSTRUCTOR 

 

 

 

 

 

 

 

 

 

 

(Circle as appropriate) 

FINISH OF SAMPLE AREA: 

(24)

 

background image

 

 

 

TECHNICAL SERVICE AUDIT REPORT 

MESH ATTACHMENT: 

MESH ATTACHMENT MEANS:  

(25)

 

 

 

IF PINS, WHEN INSTALLED?   

(26)

 

 

 

WELD INTEGRITY VERIFICATION: 

(27)

 

 

 

SUBSTRATE PREPARATION: 

STANDARD:  

(28)

 

PROFILE:  

(28)

 

PERFORMED BY: 

(29)

 

VERIFICATION: 

(29)

 

 

PRIMER: 

PRIMER MATERIALS:   

(31)

 

 

VERIFICATION:  

(32)

 

 

PRIMER THICKNESS:   

(33)

 

 

VERIFICATION:  

(34)

 

 

MESH COVERAGE AND STAND-OFFS: 

(35)

 

 

 

CONDITION OF SURFACE WHEN CHARTEK IS APPLIED: 

(36)

 

 

 

 

SOLVENT USED: 

(37)

 

 

 

background image

 

 

 

TECHNICAL SERVICE AUDIT REPORT 

SPRAYING: 

 

MACHINE 

(38)

 

MACHINE 

(38)

 

MACHINE 

(38)

 

 

Part A 

Part B 

Part A 

Part B 

Part A 

Part B 

RATIO CHECK: 

(39) (40) (39) (40)  (39)  (40) 

BATCH NOS.: 

(41) (42) (41) (42)  (41)  (42) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TANK TEMP.: 

(43) (43) (43) (43)  (43)  (43) 

IN-LINE HEATER TEMP.: 

(44) (44) (44) (44)  (44)  (44) 

DELIVERY PRESSURE: 

(45) (45) (45) (45)  (45)  (45) 

LINE HEAT: 

(46) (46)  (46) 

GUN EXIT TEMP.: 

(47) (47)  (47) 

TIP SIZE: 

(48) (48)  (48) 

FAN DIMENSION: 

(49) (49)  (49) 

SPRAY LINE LENGTH: 

(50) (50)  (50) 

INITIAL OR INTERMEDIATE COATS: 

(51)

 

 

SURFACE FINISH: 

(52)

 

 

 

THICKNESS MEASUREMENTS: 

SPECIFICATION: 

(53)

 

MEASURED:  

(54)

 

 

MATERIAL:  

 

(55)

 

  

 THICKNESS: 

 

(56)

 

SAFETY OBSERVATIONS: 

(57)

 

 

 

 

CURRENT APPLICATION MANUAL 

YES 

NO 

(58)  

 

QC MANUAL ON SITE:  YES 

NO 

(59)

 

ON SITE: 

  

  

  

(Circle One) 

  

  

  

  

  

(Circle One) 

background image

 
 
 
 

 

TECHNICAL SERVICE AUDIT REPORT 

OBSERVATIONS: 

(60)

 

 

 

 

 

 

 

 

DISCREPANCIES: 

(61)

 

 

 

 

 

 

 

 

COMMENTS:  

(62)

 

 

 

 

 

 

 

 

WERE DISCREPANCIES BROUGHT TO THE ATTENTION OF  

YES 

 NO 

APPLICATOR'S SITE MANAGER/SUPERVISOR? 

(63)

 

  

(Circle One) 

WAS AN FSNR RAISED? 

(64)

 

    YES 

NO 

Number(s): 

INTERNATIONAL REP.: 

  

 

(65)

  

 

APPLICATOR 

REP.: 

NAME:   

  

  

  

  

NAME: 

SIGNATURE:    

  

  

  

SIGNATURE: 

 

background image

 

 

 

 
 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International 
Paint Limited 

Appendix 7 

 

APPLICATOR SCHOOL 

 

CURRICULUM 

 
 
1.  Introduction to International Paint 
 

• 

Products and services 

 
 
2.  Explanation of Chartek: 
 

• 

Type of material and physical characteristics 

 
 
3.  Fire resistance ratings 
 
 
4. Installation procedures: 
 

• 

Surface preparation 

• 

Reinforcements 

• 

Mixing of components 

• 

Application 

• 

Storage 

 
 
5.  Demonstrations of application: 
 

• 

Reinforcements 

• 

Conventional spraying 

• 

Plural component spraying 

 
 

6. Other: 
 

• 

Repairs 

• 

Trowelling 

• 

Casting 

• 

Health and safety issues 

• 

Field service 

 

background image

APPENDIX 8 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of 
International Paint Limited 

 
 

COMPLETION OF THE TECHNICAL SERVICE NON-CONFORMANCE

 

REPORT 

 
1. PURPOSE 
 
The Technical Service Non-Conformance Report (TSNR) provides a means of 
documenting the details regarding identification of discrepancies and observations 
which were identified at a Chartek application site during an International Technical 
Service Audit. 
 
2. SCOPE 
 
This procedure provides instructions to the International Technical Service 
representative for the completion of the TSNR and should be used in conjunction 
with the Technical Service Audit Report. 
 
3. GENERAL 
 
3.1 

TSNR forms are distributed by the Technical Engineering Manager, Fire & 
Insulation Products. 

 
3.2 

A separate TSNR shall be initiated for reporting all individual Discrepancies 
as well as Observations. 

 
3.3 

All entries must be made in ink. 

 
4. DEFINITIONS 
 
4.1 

Discrepancy – is a deviation from requirements and procedures which will 
affect the intended use of Chartek fireproofing or is a deviation from 
requirements and procedures which have not and are not affecting the 
intended use of Chartek fireproofing but, however, could result in affecting 
the intended use unless corrective action is initiated. 

 
4.2 

Observations – include comments and suggestions regarding procedures 
which are used and are not discrepancies.  The intent of observations is to 
bring to light alternate procedures which may lead to productivity 
improvements and/or which may be to the benefit of the Applicator or 
ultimate client.  Additionally, observations may identify practices/procedures 
which, if not corrected, could result in a discrepancy. 

background image

APPENDIX 8 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of 
International Paint Limited 

 

TSNR COMPLETION INSTRUCTIONS 

5.   METHOD 

 

 

 

 

 

Responsible Individual 

Task 

 

 

 

5.1 

International Technical Service Representative 

BLOCK 1

 – enter the TSNR number.  

This number consists of month, year, 
issuer’s initials and consecutive 
number. 

 

 

 

 

 

Example:  0802RB001 

 

 

 

 

 

0802 -  month, year 
RB - 

issuer’s initials 

001- 

consecutive number of 

 

TSNRs issued by Technical 

 Service 

representative 

 

 

 

 

 

BLOCK 2

 – Ref. Audit Report Number.  

This is a number assigned to the 
Technical Service Audit Report Form 
for which the discrepancy or 
observation was first noted. 

 

 

 

 

 

BLOCK 3

 – Company name of the 

Applicator responsible for the 
discrepancy or noted observation. 

 

 

 

 

 

BLOCK 4

 – Enter date discrepancy or 

observation was documented.  The 
TSNR shall be delivered to the 
Applicator within the same working day 
as reported discrepancy. 

 

 

 

 

 

BLOCK 5

 – Project name. 

 

 

 

 

 

BLOCK 6

 – Physical location of 

project, region or state, country. 

 

 

 

 

 

BLOCK 7

 – Project Manager for the 

applicator company listed in BLOCK 3. 

 

 

 

 

 

BLOCK 8

 – Name of originator 

(International Technical Service 
representative) of TSNR. 

 

 

 

 

 

BLOCK 9

 – The Classification of this 

reported discrepancy or observation. 

 

 

 

 

 

BLOCK 10

 – The date and name of 

individual to which TSNR is delivered. 

background image

APPENDIX 8 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of 
International Paint Limited 

 
 

 

BLOCK 11

 – Reference documents.  

List all documents, specifications, 
reports, etc. pertinent to support writing 
of discrepancy or observation. 

 

 

 

 

 

BLOCK 12

 – Description of 

discrepancy/observation.  Describe 
discrepancy/observation in detail, 
including specific requirements, 
recorded values and/or actual 
conditions.  If the criteria is stated in a 
contractual document, reference 
document and paragraph number. 

 

 

 

 

 

BLOCK 13 

– International 

Recommendation(s).  Describe in detail 
International’s recommendation 
pertinent to resolve a discrepancy or 
observation. 

 

 

 

At this point, the INTERNATIONAL Technical Service representative shall coordinate with the 
Applicator’s authorised representative the proposed corrective action required to correct noted 
discrepancy(ies) or observation(s).  Upon concurrence of proposed corrective action, the 
Applicator’s representative shall complete BLOCKS 14-17 as follows: 

 

 

 

5.2 Applicator 

BLOCK 14

 – Applicator Proposed 

Corrective Action (C/A).  Document 
cause and corrective action for 
discrepancy.  An observation may not 
require corrective action, but a 
statement in response to the 
observation is required. 

 

 

 

 

 

BLOCK 15

 – Schedule Completion 

Date.  Enter the date for which the 
stated corrective action in BLOCK 14 
will be completed. 

 

 

 

 

 

BLOCK 16

 – Individual Responsible for 

C/A.  List the individual/company that 
has been assigned the corrective 
action and agrees to the target 
completion date. 

 

 

 

 

 

BLOCK 17

 – Approval of Proposed 

Corrective Action.  Prior to initiation of 
corrective action by the Applicator, it is 
required that approval be obtained from 
the Applicator’s authorised 
representative.  This may or may not 
be the same individual listed in BLOCK 
16 as individual responsible for C/A. 

 

 

 

background image

APPENDIX 8 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of 
International Paint Limited 

IMPORTANT:  For a Class I Discrepancy and prior to initiation of C/A, the International Technical 
 

 

Service representative and the authorised Applicator representative shall pursue 

 

 

approval of proposed corrective action with the Fabricator/Constructor. 

 

 

 

5.3 Fabricator/Constructor’s 

Authorised 

Representative 

BLOCK 18

 – Approval of Proposed 

Corrective Action.  Prior to initiation of 
C/A for a Discrepancy, approval is 
required by an authorised 
representative of the 
Fabricator/Constructor. 

 

 

 

After completion of BLOCK 18 copies of the TSNR shall be sent to the Fabricator/Constructor. 

 

 

 

5.4 

International Technical Service Rep/Applicator Rep/ 
Fabricator/Constructor Rep 

BLOCKS 19, 20 and 21

 – Corrective 

Action Verified As Complete.  After an 
appropriate interval of time has elapsed 
from completion of corrective action 
(Ref. BLOCK 14), verification should be 
made.  For a Class I Discrepancy(ies), 
verification and acceptance shall be 
recorded by signing and dating 
BLOCKS 19, 20 and 21 of the original 
TSNR by the International Technical 
Service representative, Applicator’s 
and Fabricator/Constructor authorised 
representatives. 

 

 

 

 

 

For a Class II Discrepancy(ies) and 
observation(s) (as applicable), 
verification and acceptance is required 
for the International Technical Service 
representative and Applicator’s 
authorised representative only. 

 

 

 

5.5 

International Technical Service Representative 

Upon completion of verification 
(

BLOCKS 19, 20 and 21),

 the original 

copy of the TSNR shall be retained by 
the International Technical Service 
representative and copies of the 
completed TSNR sent to the Technical 
Service, Sales and Technical 
Managers, Fire & Insulation Products. 

 

 

 

 

 

Copies shall also be sent to 
Fabricator/Constructor and Applicator 
representatives, as applicable. 

background image

APPENDIX 8 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission 
of International Paint Limited 

TECHNICAL SERVICE NON-CONFORMANCE REPORT 

TSNR 
No: 

(1) 

 

 

 

Page 1 of 2 

REF. AUDIT REPORT No: 

TSNR ISSUED TO: 

DATE: 

(2) (3) 

(4) 

PROJECT: LOCATION: 

PROJECT 

MANAGER: 

(5) (6) 

(7) 

TSNR ORIGINATOR: 

TSNR CLASSIFICATION 

TSNR DELIVERED TO: 

 

(9) 

(10) 

(8) 

[ ] Class I [ ] Class II 

[ } Observation 

Date: 

ISSUED TO FABRICATOR/CONSTRUCTOR: Yes/No 

NAME: 

REFERENCE DOCUMENT(S):   

(11)

 

DESCRIPTION OF DISCREPANCY/OBSERVATION 

 

 

 

 

(12) 

 

 

 

 

 

INTERNATIONAL PAINT’S RECOMMENDATIONS 

 

 

(13) 

 

 

background image

 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

TECHNICAL SERVICE NON-CONFORMANCE REPORT   

 

Page 2 of 2 

 

APPLICATOR PROPOSED CORRECTIVE ACTION 

SCHEDULED 

COMPLETION 

DATE 

 

 

 

 

(14) (15) 

 

 

INDIVIDUAL RESPONSIBLE FOR C/A: 

  

(16)

 

 

APPROVAL OF PROPOSED CORRECTIVE ACTION 

APPLICATOR REP:: 

FABRICATOR/CONSTRUCTOR REP:: 

INTERNATIONAL PAINT’S TECHNICAL SERVICE 
REP: 

(17) (18) 

 

DATE:  

DATE: 

 

DATE: 

 

CORRECTIVE ACTION VERIFIED AS COMPLETE 

APPLICATOR REP:: 

FABRICATOR/CONSTRUCTOR REP:: 

INTERNATIONAL PAINT’S TECHNICAL SERVICE 
REP: 

(19) (20)  (21) 

DATE:  

DATE: 

 

DATE: 

 

background image

 

©International Paint Limited, 2006 

This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International Paint Limited 

 
 

TECHNICAL SERVICE NON-CONFORMANCE REPORTS (TSNR) 

 

TECHNICAL SERVICE 

REPRESENTATIVE 

 
 

CLASS I DISCREPANCY 

CLASS II DISCREPANCY 

OBSERVATION 

 

 

 

• 

Issue original TSNR to applicator 

• 

Issue original TSNR to applicator 

• 

Issue original TSNR to applicator 

• Recommend 

C/A 

• Recommend 

C/A 

• Recommend 

C/A 

• 

Coordinate C/A with applicator 

• 

Coordinate C/A with applicator 

• 

Coordinate C/A with applicator 

 

 

 

APPLICATOR APPLICATOR APPLICATOR 

 

 

 

• 

Complete TSNR with corrective 
action, scheduled completion date 
and C/A designee 

• 

Complete TSNR with corrective 
action, scheduled completion date 
and C/A designee 

• 

Complete TSNR with response to 
observation 

• 

Applicator Rep. Approval of C/A 

• 

Applicator Rep. Approval of C/A 

• 

Applicator Rep. Approval 

 

 

 

FABRICATOR/CONSTRUCTOR 

 

 

 

 

 

• Review 

TSNR 

 

 

• 

Approval proposed C/A 

 

 

 
 
 
 

 

• 

Review TSNR for completion through Block 
22 

 

 

• Retain 

original 

TSNR 

 

 

• 

Distribute copies of TSNR to: 

 

 

 

 

 

- Applicator 

Regional Sales Manager 

Technical Service Manager 

Fabricator/Constructor (for Class I 
Discrepancies only) 

 

 

 

 

APPLICATOR TECHNICAL 

SERVICE 

REPRESENTATIVE 

FABRICATOR/CONSTRUCTOR 

 

 

 

 

• 

Coordinate verification and acceptance of 
C/A 

 

 

• 

Distribute completed copies of TSNR to: 

 

 

 

 

 Applicator 
 

Fabricator/Constructor (for Class I 

 Discrepancies 

only) 

 

Regional Sales Manager 

 

 

 

Technical Service Manager F&IP 

 

 

 

Forward original TSNR to the Regional 

 Sales 

Manager 

 

 

Perform Technical Service Audit 

- Record 

observations/discrepancies 

- Initiate 

TSNR 

TECHNICAL 

SERVICE 

background image

 

 

 

 
 
 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International 
Paint Limited 

 

Appendix 9 

 

DESCRIPTION AND EXAMPLES OF DISCREPANCIES

 

 

 
 

CLASS I DISCREPANCIES 

 
DESCRIPTION 
 
Class I discrepancies are deviations and procedures which will affect the intended use 
of Chartek fireproofing. 
 
Examples: 
 

• 

Application of Chartek fireproofing to primer systems not approved for use with 
Chartek (Qualified Primers List) 

 

• 

Application of Chartek fireproofing to primer systems which have dry film 
thicknesses in excess of allowable maximums 

 

• 

Application of Chartek fireproofing to primer systems applied to surfaces which 
have been incorrectly prepared and do not meet surface preparation standards 
recognised for use with Chartek fireproofing 

 

• 

Application of Chartek fireproofing to surfaces not meshed in accordance with 
certification and International’s requirements 

 

• 

Use of non-approved solvent and/or non-technical grade solvent 

 

• 

Spraying when machine ratios are outside the allowable range 

 

• 

Failure to adequately mix the two components of Chartek fireproofing when using 
single pot equipment 

 

• 

Failure to correctly proportion or ration Part A to Part B when hand mixing for 
patch repairs and other hand applied applications 

 

• 

Tank temperatures in excess of 70

o

C is a Class I discrepancy 

 

• 

In-line heater temperatures in excess of 70

o

C is a Class I discrepancy 

 

• 

Failure to apply the required fireproofing thickness 

background image

 

 

 

 
 
 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International 
Paint Limited 

 

 
 
 

• 

Application of Chartek fireproofing when humidity and dew point conditions 
relative to Chartek application are not met 

 

• 

Conditions of surface when Chartek is applied – surfaces must be clean, dry and 
free of contaminants.  Recommended coating intervals must be observed, or 
surfaces must be prepared 

 

CLASS II DISCREPANCIES 

 
DESCRIPTION 
 
Class II discrepancies are deviations from requirements and procedures which have not 
affected, and are not affecting, the intended use of Chartek fireproofing but could result 
in affecting the intended use unless corrective action is taken. 
 
Examples: 
 

• 

Failure to have at least one International trained supervisor on site 

 

• 

Use of non-approved equipment or equipment which is not totally operational 

 

• 

Improper storage of Chartek fireproofing either for general storage or heated 
storage during preparation for spraying 

 

• 

Failure to maintain ratio logs when using airless, solventless spray equipment 

 

• 

Broken, inoperative or missing temperature and pressure gauges 

 

• 

Failure to have a project-specific or an up to date Chartek Application Manual 
(latest revision) on site 

 

• 

Failure to have a project-specific or International Chartek QC Manual on site 

 

• 

Failure to have a sample area prepared for the Project 

 

• 

Failure to remove weld flash or to clean surface prior to applying Chartek 

 

• 

Failure to verify pin weld integrity 

 

• 

Failure to verify primer thickness prior to application of Chartek fireproofing 

 

background image

 

 

 

 
 
 

 

©International Paint Limited, 2005 
This document and its contents are the copyright of International Paint Limited and may not be reproduced in whole or in part without the express permission of International 
Paint Limited 

 

• 

Excessive use of solvent during mixing prior to application by single pot equipment 
or material mixed for hand patching operations 

 

• 

Failure to ensure that compressed air lines and equipment are adequately 
moisture trapped to prevent ingress of moisture into the spray process 

 

• 

Use of non-approved solvent or contaminated solvent 

 

• 

Technically correct but aesthetically unacceptable fireproofing surface finishes 

 

• 

Failure to utilise recommended equipment, airless machines with inoperable 
temperature or pressure gauges, or conventional machines without necessary 
modifications for Chartek application.  Furthermore, such equipment must be 
removed from operation or repaired immediately 

 
OBSERVATIONS 
 
Examples: 
 

• 

Excessive primer thickness 

 

• 

Use of non-approved primer 

 

• 

Improperly meshed surfaces 

 
Only an observation when no fireproofing has yet been applied. 
 
Observations may also be comments and suggestions which would result in increased 
productivity and other improvements. 

 


Document Outline