Activity: Integrate and Test
var defaultQueryStr = '?proc=_zUDkgSGFEdqMcovRzkCQow&path=_zUDkgSGFEdqMcovRzkCQow,_zvv6IEdlEdqVZeSWHJlGyA';
var backPath = './../../';
var imgPath = './../../images/';
var nodeInfo=null;
contentPage.preload(imgPath, backPath, nodeInfo, defaultQueryStr, false, true, false);
Activity: Integrate and Test
This covers the activities required to fully integrate and test the product. It includes all of the various scopes of testing, including all of the levels and types of tests planned for the iteration, further scoped by the portions of the system appropriate for the test.
Extends: Integrate and Test
DescriptionWork Breakdown StructureTeam AllocationWork Product Usage
Relationships
Parent Activities
Transition Iteration
Description
This pattern, or set of activities, encapsulates the complete integration, build, and testing of the
system.
Properties
Event Driven
Multiple Occurrences
Ongoing
Optional
Planned
Repeatable
© Copyright IBM Corp. 1987, 2006. All Rights Reserved.
contentPage.onload();
Wyszukiwarka
Podobne podstrony:
integrate and testh824DB7integrate and testh824DB7integrate and testh824DB7integrate and testh824DB7integrate and test)F90B23integrate and testg61BA0Cintegrate and test(5ACFE3integrate and test(5ACFE3integrate and test)F90B23integrate and test)F90B23integrate and test)F90B23integrate and testg61BA0Cintegrate and validate buildM919B76integrate and validate buildM919B76integrate and build within scope97192Bintegrate and testNEBDCDBintegrate and validate buildM919B76integrate and test)F90B23więcej podobnych podstron