integrate and test 68824DB7






Activity: Integrate and Test








var defaultQueryStr = '?proc=_zUDkgSGFEdqMcovRzkCQow&path=_zUDkgSGFEdqMcovRzkCQow,_zvv6IEdlEdqVZeSWHJlGyA';
var backPath = './../../';
var imgPath = './../../images/';
var nodeInfo=null;
contentPage.preload(imgPath, backPath, nodeInfo, defaultQueryStr, false, true, false);










Activity: Integrate and Test















This covers the activities required to fully integrate and test the product. It includes all of the various scopes of testing, including all of the levels and types of tests planned for the iteration, further scoped by the portions of the system appropriate for the test.


Extends: Integrate and Test








DescriptionWork Breakdown StructureTeam AllocationWork Product Usage








Relationships



Parent Activities


Transition Iteration






Description



This pattern, or set of activities,  encapsulates the complete integration, build, and testing of the system.



Properties



Event Driven


Multiple Occurrences


Ongoing


Optional


Planned


Repeatable





©  Copyright IBM Corp. 1987, 2006.  All Rights Reserved.







contentPage.onload();




Wyszukiwarka

Podobne podstrony:
integrate and testh824DB7
integrate and testh824DB7
integrate and testh824DB7
integrate and testh824DB7
integrate and test)F90B23
integrate and testg61BA0C
integrate and test(5ACFE3
integrate and test(5ACFE3
integrate and test)F90B23
integrate and test)F90B23
integrate and test)F90B23
integrate and testg61BA0C
integrate and validate buildM919B76
integrate and validate buildM919B76
integrate and build within scope97192B
integrate and testNEBDCDB
integrate and validate buildM919B76
integrate and test)F90B23

więcej podobnych podstron