215

215



Cables


15

13

11

9

7

5

3

1



On WS, work all stitches as they lie. Repeat Rows 1 to 16.

On WS, work all stitches as they lie. Repeat Rows 1 to 24.



—/

—'

/

k

k_

-'

/

k_..

/

'

k...

CI

/

—'

>_

!

d

/

k_

—V

i_

•_

—\

v_

20-st pattern


On WS, work all stitches as they lie. After first 2 rows, repeat Rows 3 to 28.


HcH-l


27

25

23

21

19

17

15

13

11

9

7

5

3

1

= put 2 st on 1 cable needle in back, 2 st on second cable needle in back, k2, purl the 2 purl st on the second cable needle and knit the 2 st on the first cable needle.

= put 2 st on 1 cable needle in front, 2 st on second cable needle in front, k2, purl the 2 purl st on the second cable needle and knit the 2 st on the first cable needle.

214


Wyszukiwarka

Podobne podstrony:
Cables 19 17 15 13 11 9 7 5 3 1 On WS, work all stitches as they lie. Repeat Rows 1 to 20. Pattern o
Textured Patterns 8-st repeat On WS, work all stitches as they lie. Repeat Rows 1 to 8. 18-st repeat
Slipped Stitches Crossed slipped stitches from page 140. 15 13 11 9 7 5 3 1 On WS, purl all
Textured Patterns 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1On WS, work all
Sweaters 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1 on a short słic 3 circular needlc,
Twisted Stitches 33 31 29 27 25 23 On WS, work all stitches as they lie. After the first 2 rows, rep
Aran Isle Patterns wuis58-st repeat ————-—— On WS, work all stitches as they lie and purl all yarn
Openwork Patterns 18-st repeat On WS, purl all stitches and yarn overs. Repeat Rows 1 to
Slipped Stitches On WS, purl all stitches. Repeat Rows 1 to 28. PPl = put 1 st on cable needle behin
S20C 409120813302 a; i? ie 14 12 10 a c A 2 19 1/ 15 13 11 9 t 5 3 1 Fetting Pledsc efer to the
11880 vp 10290803519 25 23 21 19 17 15 13 11 9 7 5&nbs
20421 t840?28 (6) Wiosenna Pile 21    22 : sPó/d2ieN 19 17 15     13
Image81 •*SKRZYNKA BEZPIECZNIKÓW 14    12 10 8 6 4 2 mmi s ’[i mu 15   &nbs
79576 vp 10290830315 Puc. 228 21 19 17 15 13 11 9 7 5 3&nbs

więcej podobnych podstron