RAPORT IJI.AŹOWY TANKOWCA
TANK AKRANG EMEWT
ENGINE ROOM |
SLOP TANK |
CENTRE TANK NR A |
CENTRE TANK NR 3 |
CENTRE TANK NR 2 |
CENTRE TANK NR 1 | |
WINO TANK NR 5 |
WINO TANK NR A |
WIMG TK3 |
WINO TK 2 |
WIMG TANK NR 1 | ||
ENGINE ROOM |
SLOP TANK |
CENTRE TANK NR 4 |
CENTRE TANK NR 3 |
CENTRE TANK NR 2 |
CENTRE TANK NR 1 | |
WINO TANK NR 5 |
WINO TANK NR A |
WINO TK 3 |
WINO TK 2 |
WINO TANK NR 1 |
FORE
PEAK
zestaw 01 |
Draught fwd = 30' 04" |
Draught aft = 33' 04" |
Trirn = |
tank |
ullage observed (m) |
ullage corrected ( m) |
T.O.V. bbls cbm |
free wat er innage (m) |
Frec watcr (m3» |
G.O.V. bbls/cbm |
temp. of tank °C/°F |
density API SG |
volume correct ion factor |
G.S.V. bbls cbm |
wcight correction factor |
weight in vacum (mt) |
weight in air (mt) |
2S |
1.180 |
0.15 |
141.8 |
46.6 | |||||||||
2P |
1.160 |
0.10 |
146.3 |
45.5 | |||||||||
4S |
1.113 |
0.11 |
144.0 |
45.9 | |||||||||
4P |
1.113 |
0.17 |
66.6 |
0.858 | |||||||||
5S |
2.020 |
0.09 |
67.3 |
0.854 | |||||||||
5P |
2.000 |
0.12 |
61.5 |
0.862 | |||||||||
total |
obliczenia wykonali: ‘ | |