-2-
9. Drill dia. hole in pressed boss beside heater control knob on yertical panel below driver’s seat. Pass choke cables through panel and secure knob assembly with nut and washer. Prom beneath yehicle, run cables rearwards along side heater control cables and clip to body as necessary.
Drill one i" dia. hole in each of the two lower corners of the front wali of engine compartment. Pass one cable through each hole into engine compartment. (Photo 8 shows choke cable entry in car).
NOTĘ: Care must be taken in fitting cables- Any severe bends or "kinks" produced in fitting will cause unsatisfactory operation.
10. Carry out items 10 to 39 in generał instruction with exception of items 18 and 19.