355

355



STARTING SYSTEM —Starter—

Armaturę Check

1. Continuity test (between two segments side by side).

• No continuity ... Replace.

2. Insulation test (between each commutator bar and shaft).

4. Check diameter of commutator.

Commutator minimum diameter:

31 mm (1.22 in)

• Less than specified value ... Replace.



EE022


•    Continuity exists ... Replace.

3. Check commutator surface.

•    Rough ... Sand lightly with No. 500 - 600


sandpaper.




Wyszukiwarka

Podobne podstrony:
STARTING SYSTEM —Starter—Magnetic Switch CheckPinion/Clutch Check 1. Continuity test (between
STARTING SYSTEM —Starter— Brush CheckField Coil Check pro, -rly nd rotates SEL-CM8D irection or 1
CHARGING SYSTEM —Alternator—-Rotor Slip Ring Check 1. Continuity test SEL589A • No continuity ...
STARTING SYSTEM —Starter—-Reassembly_ -lier
STARTING SYSTEM —Starter— Reassembly (Cont d). • Not in the specified value ... Adjust by adjusting
CHARGING SYSTEM —Alternator— Diodę Check Diodę Perform a continuity test using ohmmeter.Stator
OpenGIS. The OpenGIS specification defines functions that test the relationship between two geometry
MichaeU A. L., FClee, T.t Bransford, J. & Warren, S.(l993).The transition ftom theory to therapy
mbs 065 MY BREATH ING SYSTEM exhalation comprise, each of them. two abdominal move-ments—four in all
21880 Obraz1 (46) 3. FUNKCJONALNE I PRZESTRZENNE POWIĄZANIA W SYSTEMIE CZŁOWIEK PRZYRODA - GOSPODAR
GSM ArchitectureIntroduction A connection between two people - a caller and the called person - is t

więcej podobnych podstron