CHARGING SYSTEM —Alternator—

-Rotor Slip Ring Check

1. Continuity test

SEL589A

• No continuity ... Replace rotor.

2. Insulation test

SEL590A

• Continuity exists ... Replace rotor.

3. Check slip ring for wear.

Slip ring minimum outer diameter:

32.4 mm (1.276 in)

-Brush Check_

1.    Check smooth movement of brush.

• Not smooth ... Check brush holder and clean.

2.    Check brush for wear.

Wear limit length: 7 mm (0.28 in)

Brush wear limiting linę

SEL.988A

•    Less than the specified value ... Replace.

3.    Check brush pig taił for damage.

•    Damaged ... Replace.

4.    Check brush spring pressure.

Measure brush spring pressure with brush pro-jected approximately 2 mm (0.08 in) from brush holder.

Spring pressure:

3.040 - 4.217 N (310-430 g, 10.93-15.17 oz)

When brush is worn, pressure decreases approxi-mately 0.196 N (20 g, 0.71 oz) per 1 mm (0.04 in) wear.

i 2.

2 mm i0.08 inl

EE0-49

• Not in the specified value ... Replace.



Wyszukiwarka

Podobne podstrony:
CHARGING SYSTEM —Alternator— Diodę Check Diodę Perform a continuity test using ohmmeter.Stator
STARTING SYSTEM —Starter—Magnetic Switch CheckPinion/Clutch Check 1. Continuity test (between
CHARGING SYSTEM —Alternator— Reassembly (Cont d) iftService Data and
CHARGING SYSTEM -Trouble-shooting- Before conducting an alternator test, make surę that the battery
STARTING SYSTEM —Starter—Armaturę Check 1. Continuity test (between two segments side by side). • No
32 89b45b1fbb MAINTENANCE SPECIFICATIONS SPECPt Model YSR50T Charging System: Flywheel Magneto C
89 TransAlp Manual?ttery Charging System 1 16. BATTERY/CHARGING SYSTEM SERVICE INFORMATION 16-1 C
89 TransAlp Manual?ttery Charging System 3 BATTERY/CHARGING SYSTEM BATTERY/CHARGING SYSTEMBATTERY A
89 TransAlp Manual?ttery Charging System 4 BATTERY/CHARGING SYSTEMTESTING NOTĘ • Refer to the Servi
89 TransAlp Manual?ttery Charging System 5 BATTERY/CHARGING SYSTEM BATTERY/CHARGING SYSTEM I-1 GREE
89 TransAlp Manual?ttery Charging System 6 BATTERY/CHARGING SYSTEM When the timer reaches the "
89 TransAlp Manual?ttery Charging System 7 BATTERY/CHARGING SYSTEMREGULATED VOLTAGE INSPECTION £ i
89 TransAlp Manual?ttery Charging System 8 BATTERY/CHARGING SYSTEMUNIT INSPECTION Provided the Circ
Alt + F4 - zamykanie programu lub systemu Alt + Tab - przełączanie się do okna innego programu Ctrl
3. Continuum systemów politycznych od totalitaryzmu do demokracji. Continuum jest to pewnego rodzaju
STARTING SYSTEM —Starter— Brush CheckField Coil Check pro, -rly nd rotates SEL-CM8D irection or 1
ICHARGING SYSTEM —Alternator—--Construction_net( id ng to the irned-out Ib. Replace d
Systemy wbudowanePrzekład sesji debuggera gdb-test0dmcslabl:~/gdb-test-example$ gdb ./test GNU gdb
test Systemy Wbudowane 09 StrefaWiedzy SW09 Quizy ► Próbny test końcowy [ -4 11 Przejdź do..Próbny t

więcej podobnych podstron