lf the meter reading registers in the YELLOW or RED zonÄ™, charge the battery, and re-test and judge it in accordance with the chart below.
Battery Check (First check}
•-i-1
GREEN YELLOW RED
I I I
OK Charge Charge
I-' I-—'
Battery check (Second check) Battery check (Second check)
i-1-1
GREEN YELLOW RED
l I i
OK Recharge Replace
Battery check (Third check)
I-'-1
GREEN YELLOW
I I
OK Replace
CHARGING
NOTĘ
•- Use the CHRISTIE Battery Charger (MC 1012/2) to charge the battery.
Before operating the charger:
• Be surę the area around the charger is well ventilated and elear of flammable materials, heat, humidity, water and dust.
• Clean the battery terminals and position the battery as far away from the charger as the leads will permit.
• Do not place the battery below the charger; gases from the battery may corrode and damage the charger.
• Do not place the battery on top of the charger. Be surę the air vents are not blocked.
Awarning
• During operatlon, the charger will generale heat. To amid causing afire, always elear the work area of Jlammable materials such as gasoline, brake fluid, ełectrolyte, or cloth towels.
Turn the Power Switch to the OFF position.
Set the Battery Amp. Hr. Selector Switch to the "9.5 to 16" position.
Set the Timer to the position indicated by the Honda Battery Tester: RED —3. RED—2. or YELLOW— 1. If you are charging a new battery, set the switch to the NEW BATT position.
Attach the clamps to the battery terminals; RED to Positive. BLACK to Negative.
CAUTION
• Connect the battery cables only when the Power Switch is OFF.
Turn the Power Switch to the ON position.
(3) RED
16-5
Wyszukiwarka
Podobne podstrony:
89 TransAlp Manual?ttery Charging System 1 16. BATTERY/CHARGING SYSTEM SERVICE INFORMATION 16-1 C89 TransAlp Manual?ttery Charging System 3 BATTERY/CHARGING SYSTEM BATTERY/CHARGING SYSTEMBATTERY A89 TransAlp Manual?ttery Charging System 4 BATTERY/CHARGING SYSTEMTESTING NOTĘ • Refer to the Servi89 TransAlp Manual?ttery Charging System 6 BATTERY/CHARGING SYSTEM When the timer reaches the "89 TransAlp Manual?ttery Charging System 7 BATTERY/CHARGING SYSTEMREGULATED VOLTAGE INSPECTION £ i89 TransAlp Manual?ttery Charging System 8 BATTERY/CHARGING SYSTEMUNIT INSPECTION Provided the Circ89 TransAlp Manual Cooling System 5 1 SERN/ICE INFORMATION 5-1 TROUBLESHOOTING 5-1 SYSTEM TESTING89 TransAlp Manual Cooling System 5 COOLING SYSTEMRESERVE TANK REMOVAL Remove the starter motor (pa89 TransAlp Manual Cooling System 5 2 COOLING SYSTEMSYSTEM TESTING COOLANT MIXTURE Test the coolant89 TransAlp Manual Cooling System 5 3 COOLING SYSTEMCOOLANT REPLACEMENT Awarning • The engłne must b89 TransAlp Manual Cooling System 5 4 COOLING SYSTEMINSPECTION Inspect the thermostat visually for d89 TransAlp Manual Cooling System 5 5 COOLING SYSTEM COOLING SYSTEM C r* r THERMOSENSORREMOVAL Drai89 TransAlp Manual Cooling System 5 6 COOLING SYSTEMRADIATORREMOVAL Drain the coolant (page 5-3). Re89 TransAlp Manual Cooling System 5 7 COOLING SYSTEM Remove the nut and fan. Remove the fan motor mo89 TransAlp Manual Cooling System 5 8 COOLING SYSTEMWATER PUMP MECHANICAL SEAL INSPECTION Remove the89 TransAlp Manual Cooling System 5 9 COOLING SYSTEMINSTALLATION Install a new O-ring on the water p89 TransAlp Manual Fuel System 4 1 4. FUEL SYSTEM SERVICE INFORMATION 4-1 CARBURETOR89 TransAlp Manual Fuel System 4 FUELSYSTEM (1) FLOAT CHAMBERFLOAT CHAMBER, FLOAT AND JETS Remove t89 TransAlp Manual Fuel System 4 FUELSYSTEM Inspect the float valve seat and filter for grooves, niwięcej podobnych podstron