Part C Bulk Liquefied Gases

Bulk Liqucfied Gases

Ship

Terminal

Codo

Rem.irks

1 Is Information availab!e giwing the necessary data for the safe bandling of the cargo mcluding. as applicable. a manułactureTs inhibiton ccttificate?

2 !s the water spray system ready for use?

3 Is sufficiont suitable protectwe equipment (including self-conta ned breathmg apparatus) and protective clothmg ready for immediate use?

4 Are hołd and inter-barner spaces propedy inerted or filled with dry air as reguired?

5 Are all remote contro! valves in working order7

6 Are the required cargo pumps and compressors m good order, and have maximum working pressures been agreed between ship and shore7

A

7 is reliquefaction or boli off control oquipment in good order?

8 Is the gas detection equipment properly set for the cargo, calibrated and in good order?

9 Are cargo system gauges and asarms correctly set and in good order?

10 Aro cmcrgcncy shutdown Systems work-ną properly?

11 Does the shore know the dosing ratę of ship's automatic valves. does the

A

Ship

ship have similar detaifs of shore system?

Shore

12 Has Information been exchanged between ship and shore on the ma»munVminimum temperaturev'pressures of the cargo to bc handled?

A

13 Are cargo tanks protected against inadvertent overfillmg at all times wh Ip any cargo operations are rn progress?

14 łs tho compressor room properly ventrated, the cłcctr»cal motor room properly pressunsed and the alarm system working?

15 Are cargo tank relief vdtves set correctly and actual relief vałve settirsgs dearly and wsibly displayed?





Wyszukiwarka

Podobne podstrony:
c15img028 Part A Bulk Liquid General F General Ship Terminal Codę Remarks 1 ls the ship seeurefy
c15img030 General Ship Terminal Codę Remarks 27 Are smoking requirements betng
>STUDENTA 3 mimites PART ONE la tbis part of the examination you will be asked to fmd out as much
REIDER PART 289 Motor Examination The spinał cord terminates at about the L1-L2 level, but its lowe
EXAM FOCUS: IELTS Speaking Test Part 1 Introduction and lnterview 1 Tips for IELTS 1; On the next pa
c15img036 SHIP/SHORE SAFETY CHECK LIST GUIDELINESINTRODUCTION Befare liquid bulk dangerous subs
h ive. Befera-the inriustrial RevotltJo:ri, hurńan sowity r#ea§ed very fsm: gases into the atrn
A uc° 9j(%)=-gF-Sco»xl00 (3) (4) (5) Here, /eg and /ea are the exhaust gases and enthalpy,
Fig. 3. Behavior of CO and C02 conceniration in the stack gases as a function of stoichiometric raii
skan lab 1 6.6.6.8. "Bulk Rock" method cycle _Fig. 6.5.2.i - "Bulk Rock" method
nanostructure41995s Particles Shell Cavities Networks and pores Ąncj p0Wders Bulk Planar surface Sph
System Clean Steam Generator PD-West Side Area Bulk Autoclave Getinge Autoclave CPF Autoclave Alarms
6 CONSTRUCTION OF THE BULK AND GENERAL CARGO TRANSSHIPMENT TERMANALS OF “NEREI” IN MYKOLAIY Projec
help tag Edit Posts Ali (13)
IMG#11 Associative Principles and Democratic Reform 23 corporations, and if the great bulk of other
210 Jerzy Hajduk 8.    IMO. FSI 20/INF.20. Bulk Carrier Casualty Report. Submitted by

więcej podobnych podstron