5916045753

5916045753



A


i


Online Training


Online Course: GPM geological process model i ng by Schlumberger

Geological Process Model ing for Pelrel 2018

Module 9; Cartronates modelirg


SEACaRL in collaboration with Schlumberger delivered three (3) days of training to 31 participants among post graduate students and lecturers from Geoscience and PE department, The training was provided by Mr. Wael Ben Habel from Schlumberger. The course covered GPM geological process modeling software latest version 2020. 3 which is a Simulator for forward modeling of stratigraphic and sedśmentary processes that works with the Petrel E&P software platform from Schlumberger. The training provided theoretical and demo examples about the methodology to model for siliciclastic and carbonate resen/oirs based on the principle of mass and energy conservation.

Integrated Carbonate Reservoir & Modelling & Data Analysis

Integrated Carbonate fteservoir Modelling & Data Analysis



CAPE and SEACaRL in coiiaboration with PETRONAS Carigali and Baker Huges have successfully organized five (5) days Online training course of Integrated Carbonate Reservoir Modelling & Data Analysis (ICRM-DA). Twelve (12) participants from PETRONAS, Shell, Uzma and UTP have participated in this online course. The course provided an overview of the integrated reservoir modelling and characterization process for isolated carbonate build-ups in Central Luconia and Subis outcrop in Sarawak, Malaysia. The training course has been designed to take participants through a series of structured workflows and procedures for a better integrated reservoir modelling workflow.



Wyszukiwarka

Podobne podstrony:
MITSUBISHI Mitsubishi Programmable Logic Controller Training ManuałEthernet course(Q-series)
3,000+ online courses from the worlcTs best universities ęśx. Learn morę
44.    A.69475 DESIGNING the European model / ed. by Seppo Honkapohja and Frank Weste
13666 page03 (20) my w całość I umieszczamy na niej model tak by część 28 znalazła się na wysok
G my w całość i umieszczamy na niej model tak by część 28 znalazta się na wysokości wręgu W7 31
urbino18 model desłgned by O.Rutka 2003
73737 pg015 Model-ng bifce DOCki Tłus 5ccJion describes three different »:yles of bodicc błock, matc
pg015 Model-ng bifce DOCki Tłus 5ccJion describes three different »:yles of bodicc błock, matching s
Enterprise art 1 of 8 Centimeters USS Enterprise NCC-I70I Page 1 of 8 h:7io Scalę Model design by Ro
Enterprise art 2 of 8 USS Enterprise NCC-I70I Page 2 of 8 11:72.0 Scalę Model design by Ron (audillo
Enterprise art 4 of 8 InchesUSS Enterprise NCC-I70Ii:po Stale Model design by Ron (audillo (ronaldca
Enterprise art 6 of 8 Inches Centimeters USS Enterprise NCC-I70I Page 6 of 8 1:710 Scalę Model desig
Enterprise art 7 of 8 USS Enterprise NCC-I70I Page 7 of 81:710 Scalę Model design by Ron (audillo (r

więcej podobnych podstron