282
TABLE 6 cont. TABELA 6 cd.
1 |
2 |
3 |
4 |
5 |
6 |
Spacing |
0.2-2.5 |
0.4-2.5 |
0.2 - 2.5 |
4 |
m |
Burden |
1.5 |
1.5 |
1.5 |
3.6 |
m |
Number of holes in a stopę |
14 400 |
20 200 |
25 900 |
227 |
- |
Length of holes |
6-17.5 |
6-9.5 |
4.3-7.6 |
86 |
m |
Total length of holes in a stopę |
175 320 |
156 000 |
158 400 |
19 500 |
m |
Cost of production drilling |
3 |
3 |
3 |
8.2 |
$/m |
Total cost of production drilling in a stopę |
517 000 |
468 000 |
475 000 |
16 000 |
$ |
ANFO consumption |
328 |
292 |
296 |
271 |
Ton |
Primer consumption |
25 070 |
22 320 |
22 660 |
2 720 |
Cartridge |
Cordtex consumption |
270 000 |
240 000 |
244 000 |
48 800 |
m |
Total cost of explosives |
561 000 |
499 500 |
507 000 |
155 000 |
$ |
Total costs |
1 140 000 |
1 091 000 |
1 167 200 |
470 000 |
$ |
Volume of extracted ore from excavation of drifts |
4 860 |
9 720 |
14 580 |
12 600 |
In situ m3 |
Volume of blasted ore |
278 640 |
273 780 |
268 920 |
270 900 |
In situ m3 |
Total volume of extracted ore |
283 500 |
283 500 |
283 500 |
283 500 |
In situ m3 |
Cost of extraction |
4 |
3.8 |
4.1 |
1.7 |
$/m3 |
TABLE 7
Results of designing with different ore body and production block’s condition
TABELA 7
Wyniki projektowania z różnymi zasobami rud i warunkami bloku produkcji
Dissimilar cost [$US/m3)] |
Height [m] |
Thickness [m] | |||
P |
r3 |
r2 |
Ri | ||
1 |
2 |
3 |
4 |
5 |
6 |
2.9 |
3.7 |
30 |
10 | ||
2.5 |
- |
- |
3.7 |
40 |
10 |
2.3 |
- |
- |
3.9 |
50 |
10 |
2.1 |
3.7 |
60 |
10 | ||
2 |
3.7 |
70 |
10 | ||
1.9 |
- |
- |
3.8 |
80 |
10 |
1.9 |
- |
- |
3.7 |
90 |
10 |
2.7 |
- |
- |
3.5 |
30 |
15 |
2.3 |
- |
- |
3.6 |
40 |
15 |