5441336920

5441336920



Cherutich


82


Report 8



FIGURĘ 13: Drilling performance of several selected Olkaria wells against the planned Schedule using a rotary table rig


5.10.2 Overall drilling time for several wells, case study in Kenya and Iceland


In Figurę 13 the drilling performance for several geothermal wells in Kenya is compared. It shows the number of days it took to complete the well. The counting began from the time of spud-in until the time of rig release after the well completion tests. In Kenya it takes between 48-68 days to complete a well with an average depth of 2,600-3,000 m. There are several factors which determine the time it takes to complete a well but the main ones are formation hardness, bit life, ratę of penetration, and problems encountered during drilling like the BHA getting stuck, unrecoverable loss of circulation, and a longer cementing time due several backfills.

In the Icelandic case, as shown in Figurę 14, the first section of the hole 0-90 m was drilled using a smali portable rig. This saved the bigger rig time, and cost to the Client. It took an average of 45 days to drill a directional well to a total depth of 2,500-3,000 m. As can be seen it reąuired two bit changes at the 8‘/i" section. This proves the efficiency of the top drive system in terms of bit life management.

FIGURĘ 14: Top drive drilling progress by Iceland Drilling Company (Iceland Drilling Company, 2009)



Wyszukiwarka

Podobne podstrony:
Przegląd Geologiczny, vol. 55, nr 12/1, 2007 Fig. 13. Schematic map of oil and gas fields in the Car
NPL Report MATC(A) 164 Figurę 12. Test arrangements of resistor specimen. Figurę 13. Predicted major
Cherutich 78 Report 8 5. TYPES OF RIGS AND THEIR SPECIFICATIONS Modem drilling industry reąuires
Cherutich 70 Report 8 Pressure (bar) FIGURĘ 4: Pressure logs for a few Olkaria wells 4. COMPARISON O
00079 ?4addfcc1ad8f7adb124bf9726a6931 78 Hembree & Zimmer Figurę 13. Weighting Function. model
00449 ?6b2c81a17b7f60430d45ea04acefc6 454 Russell Figurę 13. This univariate phase map movie extrac
SCAN0151 crop Parotoid lymph node Parotoid lymph node FIGURĘ 11-13 Lymphatic drainage of the ocular
5 (434) (a) Figurę 13-15 Piuugmc fol*. (:ł) A schcmanc lilustration of a plunging fold. (4) A błock
6 (388) ?=• FIGURĘ 13-16 Błock diagrams of (<?) a dojne and {b) a hasin. Notę that m a domc the o
Cherutich 74 Report 8 biggest non-productive operations in drilling is fishing. Fishing can be defin
Cherutich 68 Report 8 Portland cement with an average slurry weight of 1.7 kg/1. Then after leaving
Stress 40,000 80 % Elongation Temperaturę (°C)(a)    (b) Figurę 6-13 The effect of
6 13 Figurę 6-13 Stripping of erector spinae bundle with heel of hand (longissimus is shown)
7 13 Figurę 7-13 Client prone (A) for stripping of obliques (B) with fingertips (Draping option 7)
Pertamk. 14(1). 7-13(1991)The Effects of S02 and NO,, Singly or in Combination on the Growth Perform

więcej podobnych podstron