Maximum oil ratę occurs at the point where the horizontal GL limit linę intercepts either the pressure drawdown linę or maximum GL top completion linę - whichever gives smaller ratę at the top completion. The point determines gas lift volume reąuirements.
Oil production
Water production
t
Fig. 5. DWS with dual gas lift wells
WC Top
14000 " ■ -
MaxG | ||
. ,/f7 | ||
11 |
i Ops/^/ /'\ | |
A • // X \ |
ollom completion | |
-/ |
^ W | |
•• ><1" | ||
—H |
Fluid flow ratę from bottom completion (b/d)
12000 10000 8000 6000 4000 2000 0
0 400 800 1200 1600
Fluid flow ratę from top completion (b/d)
Fig. 6. Example case design for DWS with dual gas lift wells [12]
582