INFOST XXX Page 4 of 7
ASSIGNMENTS:
Assignments are due on the specified datę (midnight CST on the day it is due) *unless specifically noted by the instructor. Upload the assignment to the drop box on D2L. Grades will be reduced 2 fuli points for each day that it is past due. Assignments submitted morę than 3 days past the due datę will not receive any credit.
ASSIGNMENT DESCRIPTIONS:
Description: |
Objectives: |
Point Value: |
Due: |
XHTML/CSS Review Assignment • Build a template webpage using HTML and CSS • Meets layout reąuirements (4 or morę content areas and 2 or morę columns |
Objective 2 |
10 |
Week 2 |
Discussion assignments/reflection; web marketing, SEO, and Krug book |
Objectives 1 & 4 |
10 |
Weeks 3-4 |
Initial Finał project site proposal and wireframes • Project blueprint and initial wireframes (homepage wireframe and 3 or morę sub-pages) • Functionality and feature reąuirements (3-5 pages in length typed double-space Times New Roman font) |
Objectives 4 & 5 |
10 |
Week 5 |
Responsive Design Mockup • Site mockup in different layouts utilizing Axure program • Include designs for 3 or morę different breakpoints (mobile, tablet, and desktop) |
Objective 2 |
10 |
Week 6 |
Responsive site build and testing project • Build an entirely responsive template website with 3 or morę breakpoints utilizing media ąueries |
Objective 2 |
20 |
Week 7 |
Finał Project timeline, budget, and life-cycle documents due • 6-8 pages in length (typed double-space Times New Roman |
Objectives 4 & 5 |
10 |
Week 8 |