C102963 0 INSTALLATION CABLING

background image

C102963-0 Page 1 of 2

02.04.2008

© The information contained in this document is the sole property of Steerprop Ltd. any reproduction or disclosure in part or whole without written permission is prohibited.

DOC-1017-1

Wiring and Cabling

Installation Manual



Revision history:

REV. DATE MODIFIER DESCRIPTION

0 2.4.2008

AaNi Created

A

B

C

D

E

F

background image

C102963-0 Page 2 of 2

02.04.2008

© The information contained in this document is the sole property of Steerprop Ltd. any reproduction or disclosure in part or whole without written permission is prohibited.

DOC-1017-1

1 C

ABLING

1.1 D

ESIGN AND CABLING WORK

The cabling diagrams are purposed for design, selection and installation of the cables
onboard.

1.2 S

PECIAL TWISTED PAIR CABLES

The twisted pair cables needed for installation are included in Steerprop scope of
supply. (NOTE ! the cables are supplied uncut in manufacturers standard length reels.)

1.3 W

IRING AND TERMINALS

The internal wiring is wired-up to terminal strip or equal.

All terminals are spring loaded.

1.4 P

LUGS

The Steerprop propulsor and its auxiliary systems like hydraulics are equipped with
Harting type of plugs.

1.5 C

ABLE GLANDS

There are no cable glands on electronic units except on terminal boxes of propulsor
and hydraulic power unit for their internal wiring.

2 W

IRING OR CONNECTION FAILURE

Very often the failure or error is caused by

‰

Wire breaks

‰

Short circuits

‰

Loose connections

‰

Insulation wearing

of wiring or connections. These should first check and repair.

If the signals have disturbances or noise or level fluctuation, there is conducting or
radiating disturbances from other systems.

These can be corrected in the most of cases by checking and repairing of the
connection of cable screen or pair shield connections specially at connection points.

Some times helps to move the control cable further away from disturbance source or
power cable.


Wyszukiwarka

Podobne podstrony:
C102966 0 INSTALLATION CONTROL UNIT
instalacja debiana
INSTALACJE TRYSKACZOWE I ZRASZACZOWE
Urządzenia i instalacje elektryczne w przestrzeniach zagrożonych wybuchem
Instalacje elektroenergetObl1
Projekt Instalacji deponowanie 2
Instalacje odgromowe
Wybrane elementy automatyki instalacyjnej
instalacje grzewczaet
monter instalacji gazowych 713[07] z2 03 u
8 Instalacja spalin wylotowych id
Installation instructions
ARTICLE SUSPENSION STRUT FRONT REPLACE INSTALL
Instalacja urządzeń grzewczych i wymienników ciepła

więcej podobnych podstron