Rational CLM PoT Instructor Guide


IBM Rational solution for
Collaborative Lifecycle Management
TEC setup and instructor guide
An IBM Proof of Technology
PoT.Rational.11.2.083.01
Table of Contents
TEC SETUP INSTRUCTIONS..................................................................................................................................................................... 3
HARDWARE REQUIREMENTS.................................................................................................................................................................. 3
SNAPSHOTS............................................................................................................................................................................................... 3
CONNECTIVITY REQUIREMENTS............................................................................................................................................................ 3
SETTING UP THE SOFTWARE IMAGE..................................................................................................................................................... 4
OPERATING SYSTEM AND SUPPORTING PRODUCTS......................................................................................................................... 5
VMWARE IMAGE CONTENTS:...................................................................................................................................................................6
HOW TO INSTALL THE VMWARE IMAGE................................................................................................................................................. 6
SETTING UP THE VMWARE IMAGE..........................................................................................................................................................7
INSTRUCTOR GUIDE.................................................................................................................................................................................. 8
OBJECTIVES FOR THIS POT.................................................................................................................................................................... 8
SCHEDULE AND STRUCTURE..................................................................................................................................................................8
ALTERNATIVE DELIVERY OPTION......................................................................................................................................................... 10
RUNNING THE POT WITHOUT THE VM IMAGE.....................................................................................................................................11
CLASSROOM CHECKLIST.......................................................................................................................................................................13
© Copyright IBM Corporation, 2011
US Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.
IBM Software
TEC Setup instructions
Hardware Requirements
For each participant you need a minimum of:
1. An Intel"! or compatible system consisting of the following components:
2. 2.5 GHz or greater processor
3. 25 GB Hard drive for the image alone plus another 5 GB while image is running
4. 4 GB core host RAM (3 GB dedicated to image at runtime)
5. Keyboard
6. Mouse
7. Display (image set to 1024x768)
8. Network adapter (not needed at this time)
Snapshots
The image contains a two snapshots.
  CLM & RRC PoT , used to deliver this CLM proof of technology.
  RQM PoT used for another proof of technology.
Connectivity requirements
1. The VM network setting is set to NAT.
2. The host workstation does not need to be on the network.
TEC setup and instructor guide Page 2
IBM Software
Setting up the software image
The software image included in this PoT, requires:
1. We suggest you use VMware workstation; this was not tested with VMware player version. See
download details below.
2. VMware Image dated 28-Jun-2011  Minimum VMware Workstation version is 7.0.
3. Enable your workstation to run a 64bit VM (even if you have a 64bit OS)
1. VT must be enabled in the host system BIOS. The feature may be named VT, Vanderpool
Technology, Virtualization Technology, VMX, or Virtual Machine Extensions.
2. To power on the VMWare image, users must enable hardware virtualization in your computer s
BIOS. Instructions for Microsoft Windows on the ThinkPad follow:
1. Press the blue ThinkVantage key when prompted at startup
2. Press the F1 key to enter the BIOS setup utility
3. Using the arrow keys, scroll to Config and press the Enter key
4. Scroll to CPU and press the Enter Key
5. Scroll to Intel Virtualization Technology and press the Enter key
6. Select Enabled and depress the Enter key, press Enter key to continue
7. Press F10 key to save and exit
8. Select Yes and press the Enter key
9. Full shutdown (power off), wait a few seconds, and restart your computer (NOTE  if F10
caused a reboot, that was a soft reboot. Do a full shutdown in order for the saved setting to be
recognized.)
3. After enabling VT in your system BIOS, save your changes and then turn off power to the system.
If you simply reboot the system without turning it off, VT is not enabled.
4. For more details, see: http://kb.vmware.com/selfservice/microsites/search.do?
language=en_US&cmd=displayKC&externalId=1003944
How to download the VMware image
1. You will download the VMware from the Asset Library web site. All the VMware is zipped and split into
pieces of 700 MB each (except the last pieces). Your download will consist of 21 pieces and this may
take a while (few hours). Be patient.
2. All Files can be downloaded into the same temporary directory.
Page 3 IBM Rational solution for Collaborative Lifecycle Management
IBM Software
3. Approximately 14 GB of disk is required to store all pieces and 29 GB after being expanded.
Presentations to be used
1. Day # 1  use presentations 1 - 6
Operating System and Supporting Products
1. Windows 7 Enterprise 64-bit
TEC setup and instructor guide Page 4
IBM Software
VMware Image Contents:
Table 1: VMware Image Contents (for the
Application Version
Mozilla Firefox 3.6.x
IBM Rational Requirements Composer 3.0.1
IBM Rational Team Concert 3.0.1
IBM Rational Quality Manager 3.0.1
How to install the VMware image
Attention: This image is NOT self extracting and you will need to unpack it using open source tools like
ExtractNow or WinRar.
See details on TEC web site:
http://nasoftware.ibm.com/sales/ctp.nsf/doc/MODM-7BQK7L
When doing the extract, point to a ROOT directory where you want to create the folder with all VMware
contents. Like E:\, D:\ or C:\
Page 5 IBM Rational solution for Collaborative Lifecycle Management
IBM Software
Setting up the VMware image
User Accounts
Account ID Password
Windows Adminstrator passw0rd (with the number zero)
Jazz admin clmadmin clmadmin
1. Open VMware Workstation and optionally adjust the settings of VMware Workstation.
1. Click Edit > Preferences.
2. Select the Memory tab.
3. In the Additional Memory section, select Fit all virtual machine memory into reserved host
RAM. This gives the best possible performance for the VM because it will run entirely in RAM.
Note only choose this if the memory allocated to the VM is less than or equal to the amount of
memory reserved for virtual machines on your host.
2. Confirm VM Settings
1. Memory is defaulted to 4096MB, however, adjust as needed to fit within the host machine's
available memory.
2. On Processors settings, Number of Processors should be set to 2
3. On Display settings, Accelerate 3D Graphics should be enabled.
3. Open the Rational CLM 3.0.1 PoT VMware image and revert the image to the snapshot CLM & RRC
PoT. Reverting is important as it puts the VM back in a state that is in sync with the beginning state of
the PoT.
Click NO if you are prompted, with:
Cannot connect virtual device ide0:0. No corresponding device is available on the host.
Would you like an attempt to be made to connect this virtual device every time you power on
the virtual machine?
4. Start the image. If prompted  Has this VM been moved or copied? Answer  it s been moved to be
assured of no issues with Windows activation.
5. Start the Jazz Team Server from Windows Start Menu > Jazz Team Server > Start Jazz Team Server.
6. After all the server has successfully started (takes a few minutes), open Firefox and login to each web
client app to verify they can connect to the Jazz server (client seems to run better after they ve been
run once) using the bookmark (RM, CCM, QM) as clmadmin/clmadmin.
TEC setup and instructor guide Page 6
IBM Software
7. Start the Jazz Build Engine from Windows Start Menu > IBM Rational Team Concert Buildsystem >
Start_Jazz_Build_Engine_for_MTM.bat.
Page 7 IBM Rational solution for Collaborative Lifecycle Management
IBM Software
Instructor guide
This proof of technology is designed to be self-paced. The PoT contains:
1. Setup and Instructor Guide (this document)
2. A introductory presentation, lab overview presentation, and 6 module presentations
3. A hands-on laboratory workbook with 6 exercises
1. Lab 1: Aligning Plans
2. Lab 2: Responding to a change request
3. Lab 3: Planning an iteration
4. Lab 4: Completing a story
5. Lab 5: Testing and fixing a story
6. Lab 6: Stabilizing the sprint
4. VMware image
It is suggested that the introductory presentation and lab overview be given first. It is designed to provide
introductory information, terminology and navigation tips.
Objectives for this PoT
Explore how the IBM Rational Solution from Collaborative Lifecycle Management:
1. Enables teams to collaborate in real time in the context of the work they are doing, especially in
globally diverse environments.
2. Enables projects to be managed more effectively by providing visibility into accurate project health
information drawn directly from actual work.
3. Automates traceability and auditability by managing artifacts and their inter-relationships across the
lifecycle, empowering teams to deliver more value.
Provide a hands on experience using IBM Rational Requirements Composer, IBM Rational Team
Concert"! and IBM Rational Quality Manager to automate the software delivery process.
Schedule and structure
TEC setup and instructor guide Page 8
IBM Software
After the introductory presentation, the subsequent module presentations were intentionally kept small.
They are meant to give the customer a good idea of what is to come and the scenario they will be going
through. Be very careful to remind them the various roles they will play in that lab. Without paying
attention to the role context switches, it would be easy for a customer to get lost in the scenario and get
the impression our solution is complex.
Before each lab, deliver the module slides up to and including the Lab Scenario. After explaining the
scenario, let the students perform the lab. Once complete review the Lab Concepts Learned slide. This
slide is intended to summarize the primary value takeaways we want the customer to leave with from that
lab.
Table 2: Estimated timing for PoT modules
Estimated time
Component required
Introduction 15 minutes
CLM overview 0
Lab overview 30
Lab 1  Aligning Plans 0
Lab 2  Responding to change
30
request
Lab 3  Planning an iteration 30
Lab 4  Completing a story 45
Lab 5  Testing and fixing a story 45
Lab 6  Stabilizing the sprint 30
Summary 30
Page 9 IBM Rational solution for Collaborative Lifecycle Management
IBM Software
Given this data, the following agenda is recommended:
Table 3: Recommended agenda for PoT
Agenda item Recommended schedule
Welcome 9:00 AM  9:30 AM
Introductory slide presentation 9:30 AM  10:45 AM
Break 10:45 AM  11:00 AM
Labs 1 - 3 11:00 AM  12:30 PM
Lunch 12:30  2:00
Labs 4  6 2:00  4:00
Summary 4:00  4:30
Alternative Delivery Option
The following shortcuts can be used in order to shorten the delivery of this PoT:
1. Skip lab 2.2  Conduct a review completely, and after the end of section 2.1 proceed directly to section
2.3. You would be on the same screen, so the exercise 2.3 will flow seamlessly after 2.1.
2. In lab 4.2.2  Writing unit tests and code , skip the steps _1 to _6, and start directly with step _7.
 Change the implementation task status to Done. . If you take that shortcut, then you will have to use
the next shortcuts that bypass the actual test execution against the sample application, and the fixing
of the defect.
3. Speed up through lab 5.1.2  Executing the test by not actually executing the test with the sample
application, but only recording the pass/fail verdict in Rational Quality Manager.
4. In lab 5.2.2  Fixing the defect and delivering the fix. , skip step __4.  Fix the code. , and skip step _5
 Deliver the fix. from _5.a to _5.e, only do 5.f  Change the defect status to Resolve, and then click
Save.
5. Speed up through lab 5.3.2  Executing the test again by not actually executing the test with the
sample application, but only recording the pass/fail verdict in Rational Quality Manager.
TEC setup and instructor guide Page 10
IBM Software
Running the PoT without the VM image
The following steps describe how to build a configuration similar to what is provided in the VM image
from the base products installation packages.
1. Install Mozilla Firefox 3.6
2. Install Adobe Reader and Flash Player
3. Add clm.jkebanking.net alias for localhost in C:\Windows\System32\drivers\etc\hosts (i.e 127.0.0.1
localhost clm.jkebanking.net)
4. Install IBM Rational solution for Collaborative Lifecycle Management 3.0.1:
1. Server and CCM, QM, RM applications and license keys on C:\IBM
2. Client for Eclipse IDE on C:\IBM
3. Buildsystem toolkit with JRE 1.5 on C:\IBM
5. Start Jazz Team Server
6. Using Firefox go to https://clm.jkebanking.net:9443/jts/setup (login: ADMIN / ADMIN) and run through
the setup wizard using default settings (Jazz URI: https://clm.jkebanking.net:9443/jts, new Jazz
admin credentials: clmadmin / clmadmin)
7. Create the Money that Matters sample projects from JTS Admin Lifecycle Project Administration >
Sample
8. Add Firefox bookmarks:
1. JTS Admin for https://clm.jkebanking.net:9443/jts/admin
2. CCM for https://clm.jkebanking.net:9443/ccm/web
3. QM for https://clm.jkebanking.net:9443/qm/web
4. RM for https://clm.jkebanking.net:9443/rm/web
9. Assign Client Access licence Keys using JTS Admin > User > Client Access License Management
1. RQM Contributor to Tammy
2. RQM Quality Professional to Tanuj and Marco
3. RRC Analyst to Al, Bob, Sally and Ursula
4. RRC Contributor to Curtis
5. RTC Developer to Deb and Rebecca
6. RTC Buildsystem to Build
Page 11 IBM Rational solution for Collaborative Lifecycle Management
IBM Software
10.In Firefox, allow pop-ups for clm.jkebanking.net
11.In Firefox, check marco/marco can connect to all 3 apps using bookmarks then Log Out
12.Start RTC Eclipse Client and create Deb & Rebecca workspace and add a repository connection to
https://clm.jkebanking.net:9443/ccm for each
13.Create a BAT file named Start_Jazz_Build_Engine_for_MTM.bat in Windows Start Menu > RTC
Buildsystem, with the following lines:
cd C:\IBM\TeamConcertBuild\buildsystem\buildengine\eclipse
jbe -vm "C:\IBM\TeamConcert\jdk\bin\java" -repository
https://clm.jkebanking.net:9443/ccm -userId build -pass build -engineId
jke.dev.engine
pause
1. Add C:\IBM\TeamConcertBuild\jre\bin to PATH environment variable
2. In RQM, configure Rational Team Concert as your build provider. (see online help)
3. Configure Rational Reporting for data collection and run the data collection jobs. (see online help)
TEC setup and instructor guide Page 12
IBM Software
Classroom checklist
Instructors must reach the classroom at least an hour before the scheduled start time for the PoT to
make sure there is enough time to go through the checklist. Make sure you have the contact info of the
person responsible for the classroom and the machine setup.
Checklist
VMware verification
Steps to be performed on all the machines in the classroom:
1. Power-on all the machines (if necessary)
2. Find out the user login password in case machine gets locked
3. Navigate to the directory where PoT VM image is copied
4. Put VM in full screen mode (Press ctrl+alt keys to undo full screen mode)
Miscellaneous checklist
1. Test projector
2. Test microphone
3. Student handouts
4. Beverages and food
5. Restrooms and exits
Troubleshooting tips
The computers are set up by TECs for the PoT in question.
Contacts
TBD
FAQs
Who is responsible for maintaining the PoT assets including VM, Lab Scripts and Presentations?
Can this PoT be delivered at a customer site?
Who can I contact if I find errors in scripts or need changes in the VM?
Page 13 IBM Rational solution for Collaborative Lifecycle Management
© Copyright IBM Corporation 2011
The information contained in these materials is provided for
informational purposes only, and is provided AS IS without warranty
of any kind, express or implied. IBM shall not be responsible for any
damages arising out of the use of, or otherwise related to, these
materials. Nothing contained in these materials is intended to, nor
shall have the effect of, creating any warranties or representations
from IBM or its suppliers or licensors, or altering the terms and
conditions of the applicable license agreement governing the use of
IBM software. References in these materials to IBM products,
programs, or services do not imply that they will be available in all
countries in which IBM operates. This information is based on
current IBM product plans and strategy, which are subject to change
by IBM without notice. Product release dates and/or capabilities
referenced in these materials may change at any time at IBM s sole
discretion based on market opportunities or other factors, and are not
intended to be a commitment to future product or feature availability
in any way.
IBM, the IBM logo and ibm.com are trademarks or registered
trademarks of International Business Machines Corporation in the
United States, other countries, or both. If these and other IBM
trademarked terms are marked on their first occurrence in this
information with a trademark symbol (® or "!), these symbols
indicate U.S. registered or common law trademarks owned by IBM at
the time this information was published. Such trademarks may also be
registered or common law trademarks in other countries. A current list
of IBM trademarks is available on the Web at  Copyright and
trademark information at ibm.com/legal/copytrade.shtml
Other company, product and service names may be trademarks or
service marks of others.


Wyszukiwarka

Podobne podstrony:
G500 GPS firmware Update Instruction Guide
G500 GPS firmware Update Instruction Guide
SWS Instructor Setup Guide
INSTRUKCJA Map&Guide 2011
Spark Upgrade Guide Instruktion
SAV8 Instructor Setup Guide
instrukcja prezentacja2
instrukcja bhp przy obsludze euro grilla
DS1000PL Instrukcja
VOIP Reference Guide
Blaupunkt CR5WH Alarm Clock Radio instrukcja EN i PL
Instrukcja do cwiczenia 4 Pomiary oscyloskopowe
Instrukcja F (2010)

więcej podobnych podstron