I DD05 F01 Passage planning


0x08 graphic
0x01 graphic

Passage planning applied to the Ship's sailing between port to port, including pilot station to berth or vice versa. Please take into accounts of followings:

(1)

Voyage number,

Type of cargo carried and tonnage or in ballast condition.

Draft situation: forward and aft draft.

(2)

Refer Nautical publication including Guide to Port Entry; Sailing Directions; Tide Tables; Current and Pilot charts and relevant Port Regulations etc.

(3)

Estimate prevailing wind force and favourable current within the navigating area.

(4)

Alternating or way points and ETA of the planning passage (Latitude and Longitude or bearing and distance from landmark, etc.).

(5)

Estimate planned total steaming distance and assumed speed (current factor taken in account to) and daily consume fuel and diesel oil

(6)

Summary:-

Actual steaming distance run; actual navigating speed and average daily consumption of fuel and diesel oil.

Weather condition including wind direction and force and sea status.

Total days of vessel encounter bad weather.

(7)

Remarks:-

Period of bad weather* in this passage (period of vessel influenced by Typhoon, fog and ice etc.), also including date and time/date of commencing and cease; kinds of incident occur (Time, Date, Position (Lat/Long) and nature of incident, damage extent). Factors and causes which affecting the Ship's speed etc.

(8)

Form entries:-

Making entries into the passage planning from the pilot station to berth or vice versa which the item (6) Summary is not necessary.

*

Bad weather means wind force more than Beaufort scale 8.

To be continued.

Date: __________________

(1)

Passage Descriptions:-

Voy. No. _______________

From __________________

To _____________________

Type of cargo & Tonnage _________________

Fore/Aft draft ___________________

(2)

Reference Nautical Publications and Charts No.:-

(3)

Estimated prevailing wind force & favourable current within the navigating area:-

Prevailing wind force

Favourable current

(4)

Way points for the Planned voyage ( Latitude and Longitude)

WPs

Lat.

Long.

Course

Dist. to go

Time crossing WPs

Chart(s)

(5)

Estimate total distance and speed:-

Daily Consumption of fuel/diesel oil

Dist

Speed/Total Steam Time

(6)

Summary

Actual total distance

Actual speed/daily consume fuel/diesel oil

Weather & sea condition

Days of vessel encounter bad weather*

(7)

Remarks:

___________________________ ___________________________

SECOND OFFICER MASTER

*** Please keep in file and ready for inspection.

Note: To retain for 2 years.

Issue date: 03.11.2003/Rev. 00 I-DD05-F01 Page: 3/3

PASSAGE PLANNING AND CHECKLIST

QSMS I-DD05-F01 Rev. No.00



Wyszukiwarka

Podobne podstrony:
5th Fábos Conference on Landscape and Greenway Planning 2016
Ka PN01707 F01
VA 018 Voyage Planning, STW
CLIL planning proforma
Financial planning problems
I AD06 F01 Rescue equipment
PBO SDO6 F01 Reviewing records to contract and agreement
G Instalacje F01 id 185300 Nieznany
PBO G 04 F01 QSMS document distribution list
PBO G 07 F01 Qualified Suppliers list
F01 Wektory
planning guidance for response to nuclear detonation 2 edition final
Ka Schematy F01
I ED01 F01 Enter enclosed spaces check list
Descartes wax passage, With reference to Hume
I AD05 F01 Notification

więcej podobnych podstron