VA 031 Safety Systems Critical Equipment


Release to Third Parties

by Special Authorisation

of Management only

Regular Testing of Systems Related to Safety

(Critical Equipment)

1.

Purpose

Safety facilities are only of use if they really function in emergency. In view of this these facilities are regularly subjected to operating tests.

These operating tests moreover serve to familiarise the crew with the function and handling of these facilities.

2.

Application

This Documented Procedure applies on all ships managed / operated by Schiffahrtskontor tom Wörden GmbH & Co. KG.

3.

Definitions and Abbreviations

3.1

Definitions

  • Critical System or Equipment - the equipment or technical systems that the sudden operational failure of may result in hazardous situations.

  • Safety means the safe operation of vessels according to the ISM Code.

  • Environmental Protection means the protection of the maritime environment according to the ISM Code.

  • Safety and Environmental Protection System (SE System) means the System according to ISM Code and STCW 95 of Schiffahrtskontor tom Wörden GmbH & Co. KG.

  • Safety and Environmental Protection Manual (SE Manual) means the documentation of Schiffahrtskontor tom Wörden GmbH & Co. KG's SE System.

3.2

Abbreviations

ISM Code

International Management Code for the Safe Operation of Ships and for Pollution Prevention (International Safety Management Code), adopted 04.11.1993

STCW 95

International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978, as amended in 1995 (STCW Convention)

STCW Code

Seafarers' Training, Certification and Watchkeeping Code (STCW Code)

VA

Procedure

4.

Responsibilities

The heads of the deck and engine department are responsible for checking safety-related systems.

5.

Description of Routines

The ISM Code calls for the identification of equipment and technical systems that are considered critical and the procedures set in place to ensure that these systems are adequately maintained and that there be specific measures established aimed at promoting the reliability of such equipment or systems. These measures should include the regular testing of stand-by arrangements and equipment or technical systems that are not in continous use.

Functional testing takes place weekly, monthly and half-yearly. In the CL-008 'Regular Testing of Systems Related to Safety (Critical Equipment)' the positioning of the various tests in the time-frame are specified. Each vessel Schiffahrtskontor tom Wöhrden GmbH & Co. KG operates is arranged differently. Therefore this list will be updated board-side by ship's specific points; operating tests are naturally not required for safety facilities not found on board.

It is recognized that all pieces of equipment are important to the proper operation of the vessel. The critical equipment and systems identified in this procedure are those felt to meet the ISM Code criteria.

Critical Equipment or Systems

  • Main Propulsion

  • Reduction gears or Thruster systems

  • Ship's Service System

  • Emergency Electrical Power System

  • Steering Systems

  • Fire Pumps

  • Bilge System

  • Fuel Oil Purification System

  • Fire Detection System

The checklist will be worked off by the crew members nominated by the department heads. Tests affecting more than one department must be arranged together. The department heads ensure that always different crew members carry out the tests and new crew members will be familiarised. This way it is ensured that a high proportion of the crew can operate all safety facilities.

It will be ensured, that neither passengers nor crew will be endangered by operational tests, e.g. by fire-doors falling shut. In this case loudspeaker announcements are to be made.

Operational tests of safety facilities carried out for other purposes (e.g. during a drill or the

F- Survey by the See-BG) will be counted if they are documented.

If functional tests establish non-functioning, then without delay trouble-shooting and elimination will be initiated via the department head. If the fault cannot be corrected at once, it is documented in Fo-008 "Deficiency Report" and the corrective action pursued. The flag state and classification society rules will be complied with.

6.

References and Remarks

6.1

Reference Documents

  • Rules for Classification

  • Flag State Rules

  • VA-005 Communication with Company, Reporting

  • VA-040 Performance of Drills and Exercises to Prepare for Emergency Situations

  • VA-033 Reporting of Non-conformities, Accidents, Serious Incidents,

Hazardous Occurrences and Near Misses

  • VA-032 Corrective Action

  • VA-027 Maintenance of Ship, Engine and Equipment

  • VA-034 Control of Records

  • Training Manual

  • Operating and Maintenance Manuals

6.2

Bibliography

  • SOLAS

Schiffssicherheitsvorschriften

6.3

Remarks

Procedures and manuals for specific ship's types will be complied with.

7.

Documentation

  • The execution of the CL-008 checklist is entered in the deck log-book and engine log-book.

  • All faults occurring which cannot be immediately eliminated will be documented and pursued with Fo-008 "Deficiency Report".

  • Repairs arising from operational tests will be entered in the maintenance plan and in the work log.

  • Survey Reports

8.

Revision of Documents

Party responsible for the editorial revision of this procedure

Designated Person

9.

Distribution

All Safety Management Manuals

Additional Copies:

  • none

10.

Attachments

  • none

0x01 graphic

Procedure

Schiffahrtskontor tom Wörden

GmbH & Co. KG

Wilhelm-Schröder-Str. 3

D-21726 Oldendorf

VA-031

Revision 1

17.10.2003

Page 1 of 3

0x01 graphic

Procedure

Reederei Heinz Corleis

Kampweg 4a

D-21706 Drochtersen

prepared: 25.09.02

approved: 25.09.02

released: 25.09.02

Revision 2

Procedure No.:

VA-031

M. Blohm

H.Corleis

M.Blohm

Page 1 of 3



Wyszukiwarka

Podobne podstrony:
VA-028 Safety Equipment, Podręcznik morskie, ISM Forms, tom Woerden, Part C - Procedures
PBO G 09 F07 Quality & safety system audit checklist in?pa
The?vantages of American?ucational System
VA 026 Safety work, STW
08 F10 Passive Safety Systems
09 F01 Passive Safety Systems
03 E83 Safety Systems
Tab 14 Passive Safety System
09 E70 Passive Safety Systems
Safety Equipment
Pytania i odpowiedzi ? 3 Safety Equipment
Alchohol Distillation Principles Equipment Relationships and Safety
Gorban A N singularities of transition processes in dynamical systems qualitative theory of critica
95 AMESYS CRITICAL SYSTEM ARCHITECT
State Highway Safety Management System Manual
Safety Instrumented Systems
DoD Nuclear Weapon System Safety Program Manual
System RFID Safety w wózkach widłowych

więcej podobnych podstron