Q method chart descr 2013

Q method chart descr 2013



ROCK MASS OUALITY AND ROCK SUPPORT

G

F

E

D

c

B

A

Exceptionally

poor

Extremely

poor

Very

poor

Poor

Fair

Good

Very

good

1

Extremely |Excep. good I good

RQD J J

Rock mass quality Q =-x — x —

J J SRF

n    a

RRS - spacing related to Q-value


Si30/6

D

016

c/c


Si30/6 016-020 (span 1 Om)

D40/6+2 016-20 (span 20m)

Si35/6 016-20 (span 5m)

D45/6+2 016-20 (span lOm)

D55/6+4 020 (span 20m)

D40/6+4 016-20 (span 5 m)

D55/6+4 020 (span 10 m)

D70/6-f6 020 (span 20 m)

- Single layer of 6 rebars.

30 cm thickness of sprayed concrete

= Double layer of rebars

= Rebardiameter is 16 mm

= RSS spacing. centre - centre


Supporł categories

® Unsupported or spot bołting (D Spot bolting SB

(3) Systematic bolting fibr© reinforced sprayed concrete, 5-6 cm B+Sfr

@ Fibr© reinforced sprayed concrete and bolting. 6-9 cm. Sfr (E500)+B

Fibrę reinforced sprayed concrete and bolting. 9-12 cm Sfr (E700)+B

Fibrę reinforced sprayed concrete and bolting, 12-15 cm + reinforced ribs of sprayed concrete and bolting Sfr (E700)+RRS I +B

© Fibrę reinforced sprayed concrete >15 cm + reinforced ribs of sprayed concrete and bolting Sfr (E1000)+RRS ll+B

® Cast concrete lining CCA or Sfr (E1000)+RRS lll+B

® Special evaluation

Bolts spacing is mainly based on 020 mm

E = Energy absorbtion in fibrę reinforced sprayed concrete

ESR = Excavation Support Ratio

Areaswith dashed lines have no empirical data

1

0.001


0.004 0.01


1    4    10    40    100    400


Bolt length in m for ESR =



Wyszukiwarka

Podobne podstrony:
smpb 55 CARI. MUTCHUfiR Another magnifkent eaample of ihr right method# nf irain-ing. The*e *pl
SYSTEMS SUPPORTING PRODUCTION ENGEINEERING 2013 1 CHALLENGES FOR ERGONOMICS AND IMPROVEMENT OF WORKI
skan lab 1 6.6.6.8. "Bulk Rock" method cycle _Fig. 6.5.2.i - "Bulk Rock" method
130 5.4.3 Capture-Mark-Recapture (CMR) method Each bird was marked at capture and released in the po
AutoCAD Mechanical 2013 • WERSJA NIEZAREJESTROWAMA C:Doaitriente and Sesin ACAD.dwg M I Zarejestruj
Ouality and reliability of EPCs How to ensure high quality and reliable energy performance assessmen
PhD-46 Alberto Quaglia, 2013, “An integrated business and engineering framework for synthesis and de
USSR Hconomic (Contd) USSR Econoiaic (Contd) Ootput Ouality And Producticn Effi ciency, by I* May*v«
The bar chart illustrates the number of men and women studying engineering at Australian universitie
39094 Prayer?fore Mass ore Mass Almighty and ever-living God, I approach the sacrament of Your only-
Figurę 1. Mass change and swelling ofthe biomicroconcretes during incubation in SBF.
Table 3 shows the method proposed to assess the rock mass strength gives reasonable values of Mohr -
108 and Cd36 deficient mice have lower body mass (Kevorkova et al., 2013) and decreased adipogenesis

więcej podobnych podstron