69642 Suzuki RM125“

69642 Suzuki RM125“



7-6 CLUTCH

•    Replace the O-ring with a naw ona.

•    Fit the clutch outer cover ©.

•    Tighten the bolts diagonally.

H Clutch outer cover bolt: 11 N m (1.1 kgf-m, 8.0 Ib-ft)

•    Reassemble the rear brake pedaÅ‚. ([^7“ 15-15)

•    Fili the transmission with specified transmission oil to the correct level. (C^/=‘2-9)

•    Inspect the clutch cable play. (0^2-12)

PRIMARY DRIVEN GEAR ASS’Y REMOVAL

•    Remove the clutch outer cover.

•    Removethe pressure piÄ…te and clutch plates. ((^717-3)

•    Flatten the lock washer ©.

Hołd the clutch sleeve hub with the special tool and łóosep \ the nut®.

09920-53740: Clutch sleeve hub holder


Remove the clutch sleeve hub


KEHI



IP3H



1

   Remove the snap ring ®, washer and kick idle gear ©.

•    Remove the needle bearing ®.

•    Remove the spacer (§).

09900-06107: Snap ring pliers


Wyszukiwarka

Podobne podstrony:
Suzuki RM125? 7-8 CLUTCH 7-8 CLUTCH m-v iron • Tighten the clutch sleeve hub nut with the special to
Suzuki RM125? 7-4 CLUTCH 7-4 CLUTCH IKHlCLUTCH PLATĘ INSPECTION • Measure the drive piąte thickness.
63648 Suzuki RM125? CLUTCH 7-5CLUTCH PLATĘ REASSEMBLY ♦    Apply transmission oil to
23166 Suzuki RM125? CLUTCH 7-7PRIMARY DRIVEN GEAR ASS Y INSPEC-TION ♦ Inspect the clutch sleeve hub
Suzuki RM125? CLUTCH 7-1CLUTCH -CONTENTS CONSTRUCTÅ‚ON
Suzuki RM125? CLUTCH 7-3CLUTCHCLUTCH PLATĘ REMOVAL ♦    Drain transmission oil. (d?12
74125 Suzuki RM125? 7-2 CLUTCHCONSTRUCTIONCLUTCH H 4.5 N-m (0.45 kgf-m, 3.3 Ib-ft) H 70 Nrn (7.0 kgf
Suzuki RM125 8 After touching the brake hose union to the stopper, tighten the union bołt to the spe
78795 Suzuki RM1257 12-8 COOLING SYSTEM •    Replace the water pump case gasket with

więcej podobnych podstron