Suzuki RM125•

Suzuki RM125•



7-8 CLUTCH

7-8 CLUTCH

m-v

iron


• Tighten the clutch sleeve hub nut with the special too! to the specified torgue.

09920-53740: Clutch sleeve hub holder

H Clutch sleeve hub nut: 70 Nm (7.0 kgf-m, 51.0 Ib-ft) • Bend the lock washer to secure the nut.

•    Reassemble the clutch plates and pressure piÄ…te. (0^7:5), \

•    Replace the O-ring with a new one.

•    Fit the clutch outer cover and bolts. Tighten the Ä™lotch cover

bolts diagonally. (CZ7"8-5)    \ V \\ V

H Clutch outer cover bolt: 11 N m (i.1 kgt-m, 8^) Ib-ft)

f§ • > \ \

•    Reassemble the rear brakp pedaf. ((X^15-15j>

CLUTCH RELEASE CAMSHAFT REMOVAL

•    Remove the magneto rotor and stator. 3-5)

•    Remove the clutch release camshaft CD.

NOTĘ:

Loosen the clutch cable adjuster when disconnecting.

CLUTCH RELEASE CAMSHAFT INSPEC-TION

• Inspect the clutch release camshaft.



Refill transmission oil. (O^Z-9). - ^ \    â€¢

\ i

C:;:7





Wyszukiwarka

Podobne podstrony:
63648 Suzuki RM125? CLUTCH 7-5CLUTCH PLATĘ REASSEMBLY ♦    Apply transmission oil to
69642 Suzuki RM125? 7-6 CLUTCH •    Replace the O-ring with a naw ona. •   
Suzuki RM125? 7-4 CLUTCH 7-4 CLUTCH IKHlCLUTCH PLATĘ INSPECTION • Measure the drive piąte thickness.
23166 Suzuki RM125? CLUTCH 7-7PRIMARY DRIVEN GEAR ASS Y INSPEC-TION ♦ Inspect the clutch sleeve hub
Suzuki RM125? CLUTCH 7-1CLUTCH -CONTENTS CONSTRUCTÅ‚ON
Suzuki RM125? CLUTCH 7-3CLUTCHCLUTCH PLATĘ REMOVAL ♦    Drain transmission oil. (d?12
74125 Suzuki RM125? 7-2 CLUTCHCONSTRUCTIONCLUTCH H 4.5 N-m (0.45 kgf-m, 3.3 Ib-ft) H 70 Nrn (7.0 kgf
47519 Suzuki RM1253 13-6 ELECTRICAL SYSTEM • Remove the nut with a special tool. KEjII 09930-40113:
suzuki rm25016 EXHAUSTVALVE 11-7 •    Temporarily tighten the bolts ®. •   
69818 Suzuki RM1255 12-6 COOLING SYSTEM • Inspect the bearing for smooth inner race movement. 12-6

więcej podobnych podstron