36

36



Maintenance procedurę


ENGINE MAINTENANCE

After Engine Warm-up (Cont'd)



c

START

)

f

Start engine and warm it up until water temperaturę indicator points to middle of gauge and make surę that engine speed is be Iow 1,000 rpm.

1

r

Turn off engine and open engine hood.

1

r

Disconnect air injection hose from air pipę and install cap on air pipę and disconnect throttle opener control valve vacuum hose at throttle opener control valve side and install blind pług to hose.

'

'

Start engine and run it at idle speed for 2 minutes.



SMA716A


r:'

aśjdw :>:

■e>»-1 -:C


.1


Race engine (2,000 - 3,000 rpm) 2 or 3 times under no-load and run engine at idle speed.


Check ignition timing.


IGNITION TIMING

M/T: 2±2° A.T.D.C. A/T: 2±2° B.T.D.C.

(in "D" position)


O.K.

••    '.»r


N.G.


Adjust ignition timing by turning distributor, loosening distributor securing bolt.



Race engine (2.000 times under no-load idle speed.

3,000 rpm) 2 or 3 and run engine at

1

r

Check idle speed.

IDLE SPEED

M/T: 750±50 rpm A/T: 700±50 rpm

(in "D" position) ___

N.G.


©


jo.K.

®




Wyszukiwarka

Podobne podstrony:
©ENGINE MAINTENANCE.After Engine Warm-up (Cont d). Adjust idle speed by turning throttle adjusting s
ENGINE MAINTENANCE__After Engine Warm-up_ ADJUSTING IDLE RPM, ADJUSTING IGNITION TIMING AND
89 TransAlp Manual General Specifications Service 3 MAINTENANCECYLINDER COMPRESSION Warm up the eng
TROUBLE-SHOOTING AND DIAGNOSESPressure Testing 2.    Warm up engine until engine oil
plakat 211x300 24 listopada 2011IMPREZA INTEGRACYJNA WARM UP 2011 S-MRT: 20:00   &nbs
plakat 24 listopada 2011IMPREZA INTEGRACYJNA WARM UP 2011 Klub InBlanco Ul. Jagiellońska 6
ENGINE OVERHAUL— Inspection (Cont d)_ CRANKSHAFT RUNOUT Check crankshaft runout. CYLINDER BORĘ Using
ENGINE OVERHAUL_Inspection (Cont d)— PISTON TO CYLINDER WALL CLEARANCE 1. Measure piston
struktury klucz Longman rep rozsz (7) IMPORTANT friendly a sense ofhumour easygoing generous Warm-up
1 (6) 2 IMPORTANT friendly a sense ofhumour easygoing generous Warm-up This is a lead-m to the unit.
a3 Warm-up This activity is intended as a lead-in to the unit. Write on the board Travel and touri
Syllabus for B.Tech(APPLIED ELECTRONICS ANI) INSTRUMENT ATI ON ENGINE ERING) Up to Fourth Year Revis
IMG7 HattwA Powriooi Akmw Kfit/Matura Powerbook Answer Key Module 1 Warm-up 1 Across: 1 (relaj

więcej podobnych podstron