2740389181

2740389181



KONSTRUKCJE ZESPOLONE

T. IX - ZIELONA GÓRA - 2011

RECONSTRUCTION AND UPDATING OF MULTISTOREY BUILDINGS USING INCOMPLETE REINFORCED CONCRETE FRAME WITH PRECAST AND CAST-IN-SITU CEILINGS

Valery BIALEVICH BelNIIS Institute RUE

Sumniary

The article deals with results of reconstruction and updating of multistorey buildings of old construction. Engineering solution for substitution of physically worn out inner bear-ing walls and wooden ceilings for incomplete reinforced concrete frame having fiat pre-cast and cast-in-situ ceiling disks of hollow-core slabs built inside existing bulk of build-ing has been realized. Connection of ceilings with bearing walls being preserved is madę by means of cast-in-situ reinforced concrete. Possibility of arranging balconies on pro-jecting cantilevers has been demonstrated. Strength, stiffness, reliability and fire safety, as well free layout of premises, improved level of consumer ąualities, minimum specific resources consumption are provided.

Key words:    Multistorey buildings, reconstruction, reinforced concrete frame,

precast and cast-in-situ ceilings

1. INTRODUCTION

By now urban housing facilities have accumulated rather large amount of buildings having medium number of stories (up to 4...5 stories) of old construction with brick and panel walls, and floors on wooden beams. In their consumer ąualities such buildings are morally obsolete, and their ceilings due to physical wear after long service have no sufficient strength, are conductive to accidents, do not meet fire safety reąuirements and are subject to repair and replacement, or demolition. The last reąuires additional expenses for dismantling and dispos-al of old structures, re-lay Utilities, supply pipelines, etc., which leads to in-crease of manufacture cost of newly erected premises. Meanwhile, by virtue of town planning situation that has taken shape, and historical traditions some buildings may have status of relics of architecture. Hence the issues of preserva-



Wyszukiwarka

Podobne podstrony:
KONSTRUKCJE ZESPOLONE T. IX - ZIELONA GÓRA - 2011SPIS TREŚCI 1.    Piotr Aliawdin, Kr
KONSTRUKCJE ZESPOLONE T. IX - ZIELONA GÓRA - 2011NOŚNOŚĆ GRANICZNA ZESPOLONYCH STAŁO WO-BETONOWYCH
/ XXIV Olimpiada Wiedzy i Umiejętności Budowlanych Zielona Góra 2011 - 03 - 05
Tomasz A. Łabuz Harley M.D., Turner I.L., ShortA.D., Ranasinghe R.. 2011. Assessmenl and integralion
•    Preservation and reproduction of the work using techniques such as printing,
14 PianeIng and Design of Tali Buildings Wersom, Poland, Novemoer ’7-30, 197?. l.arsaw 1972 larsaw
•    Preservation and reproduction of the work using techniques such as printing,
•    Preservation and reproduction of the work using techniques such as printing,
•    Preservation and reproduction of the work using techniques such as printing,
Zespół Szkół Ogólnokształcgcych i Sportowych w Zielonej Górze wraz z Klubem Sportowym Falubaz Zielon
PA160069 TADSUSE DZWONKO WSKI (Zielona Góra) KSIĘGI R EGISTR A TU R V MIASTA KOŻUCHOWA Z ŁAT 1665* 1
136 G. Gremza styku w konstrukcjach zespolonych typu płytowego i belkowego, a także przedstawiono re
przedsiębiorstwem, cz. 2, Uniwersytet Zielonogórski, Instytut Organizacji i Zarządzania, Zielona Gór
17.    A. Szumna (zespół IX): zajęcia dla dzieci z Funduszu na Rzecz Dzieci
P1090485 Rys. I Schemat konstrukcji zespołu gazowego i powietrznego pistoletu WW-1; 1 -końcówka, 2 -