9088367651

9088367651



PHYSICAL INFRASTRUCTURE: SOLID WASTE MANAGEMENT

The total Municipal waste generated is estimated to be around 2500 TPD. Out of this quantity, a total of about 400 TPD is sent to three facilities for corwerting to compost or vermicompost.

The rejects from these facilities are disposed off into nearby quarry pits or debris yards.

The balance of 2100TPD is not processed and being disposed in either one of the official or unauthorized dump yard around the^

city.    Ł

Processing plants in Bengaluru:

1.    M/s Terafirma (Dodabelapura)- 1000MTPD    J/y

2.    KCDC (Kudlu) 300MTPD    JtfdL

3.    M/s MSGP Infra tech - 500MTPD

4.    Mavallipura BBMP - 70MTPD

Time of waste collection &:00 - 9:30am

° 40-50 tonnes of §3 waste generated ' 22Ł per day

Bulk wasłe generated


Garbage dumping points


People and identifying sites


Synchronisation point (wet waste)


Synchronisation point (Dry waste)


■    Wet waste

■    Dry waste

■    Mixed waste

■    Other


Garbage contractrs dumped garbage at Mandoor village landfill which was closed due to people protesting.


Dry waste is outsourced to private companies.


Plastic, Cardboard and paper waste is distributed to various

factories across bangalore & nearby districts.


some of the waste is recycled.


Waste

generated at individual buildings Not

segregated


Waste dumped at Secondary collection points.

Not

segregated.


Tempos and tonne collection vehicles collect waste from primary collection points.


Secondary

collection

points

switching

waste

collected from tonne vehicles to tonne vehicles.


Synchronisation point at Assaye Road for ward no. 78


INFERENCE


Need for waste seggregation at household level


Door to door collection system should be improvised


Landfil at Nelamangala (26kms away, 5acre land) (Doddabelapur, Mavallipura- other land fili sites in Bangalore)

Type of Vehicle

Image of vehicle

Compacter Large capacity - (4 m3 cap)

Tipper - (0.5m3 cap)

~t—li

-"i

Dumper placer with one Container -(3.5m3 cap)


NEIAMANCAIA


Bangalore to

Nelamangala

distance:

Approx

26Kms


RASER TOWN


INNER CITY REGENERATION - PULAKESHINAGAR,BENGALURU

HABITAT DESIGN STUDIO - II (2015-2016)    { nT

DEPARTMENT OF ARCHITECTURE

ĆltoM BMS College of Engineering (AUTONOMUS UNDER VTU)

Si    AKHILA, ASHFAQ, JAYANANDINI, POORNA. PRIYA, SHARAN, SHRUTHI, YAMUNA


Wyszukiwarka

Podobne podstrony:
f17 6 Letters to the Editors The "Letters to the Editors" section of HeartWeb is intended
00342 de71e089a262a6029d4137528ec356 346 Prairie & Zimmer with the reliability requirement. Th
skanowanie0107 (2) 12.4.5.    Keys to teaching the writing skills A number of things
skanowanie0107 (2) 12.4.5.    Keys to teaching the writing skills A number of things
skanowanie0084 (2) •fwl dictation, ttt dicto-comp - students listen to the passage and then summaris
skanowanie0090 (2) 12.2.8.1. Role play A role play is the communicative activity where a task is giv
skanowanie0107 (2) 12.4.5.    Keys to teaching the writing skills A number of things
J 01 page (33) Frcjm Bruce WaL/nes pri ate Files in the Bat Computer LUTHOR It is inconceivable to t
m85 Saxon, Viking and NormanIntroduction Our knowledge of the military aspects of the so-called Dar
Few countries have effectively used testing to control the spread of the virus. A scalable antibody
2 14 The success of the negotiation is the success of the preparation madę for it... A negotiator ha
27. A gas well with 40 ppm H2S and 14 mole-% CO2 is planned to be produced up a string of tubing cem
EPIA 2011 ISBN: 978-989-95618-4-7 If the player folds 72% or inore hands then he is considered to be
Huff method is thought to be one of the most often used models which takes into consideration the la
image002 HER NAME IŚ BE Al IV. AND HER SOI L IS YEARNING TO BE FREE ... When Beauty arrivcs at the c

więcej podobnych podstron