CONSTRUCTION AND WIND POWER PLANT OPERATION WITH A CAPACITY OF 300 MWH

Project goals:

Construction and wind power plant operation with a capacity of 300 mWh, creation of new workplaces.

Short summary of the project:

Construction of wind power plant based on European equipment for European standards. The following indices are planned:

The cost of Capital development: 11250 million UAH;

Power generation: 1050 million kWh per year.

Expected results:

Formation of ecological generating capacity;

Creation of 20 workplaces for local population;

Decrease of the independence of import energy products; Foreign fund-raising;

Replenishment of local budget on tax.

Key project events:

Construction of wind power plant Construction of power lines Construction and renovation of roads.

Project production period:

2016-2018

Estimate cost of the project, ths., UAH:

2015

2016

2017

Total

-

2 340 000,0

8 910 000,0

11 250 000,0

Financing sources:

Funds from foreign investors and credit funds of European banks.

Potential key participants of the project

implementation:

Projected organizations (project documentation development), construction enterprises, industrial plants (construction and repair of equipment for wind turbinę).

Roman Shpanov

Tel.: (0512) 44-09-19, (095) 919-27-65 E-mail: suwes2007@gmail.com



Wyszukiwarka

Podobne podstrony:
PRODUCTION OF ALTERNATIYE FUEL Project goals: Installation of power linę for production of biomass
Westinghause0 Air Cooling vs. Steam Cooling Combustors Both the F and G models operate with similar
CITY-ZEN - THE VIRTUAL POWER PLANT AND VEHICLE2GRID PROJECT The Virtual Power Plant, as part of the
enukl Nuclcar Power-Generation System Large-capacity output and high reliability are two key reąuire
TME2 Nuclcar power-plant worker Norton McCoy was exposed to internę radiation, and his son Henry wa
Hoyt, R.M. and Clemence, S.P., 1989. Uplift Capacity of Helical Anchors in Soil. Proceedinss of the
keh p5015 djvu ServiceManuał KEH-P5015/X1M/ES ORDER NO.CRT2583 MULTI-CD CONTROL HIGH POWER CASSETTE
CONSTRUCTION OF AGRICULTURAL PRODUCTS PROCESSING PLANT Project goals Construction of the workshop
“ELEVATOR OF SUNFLOWER” CONSTRUCTION OF THE ELEVATOR STORAGE OF SUNFLOWER SEEDS IN THE CAPACITY OF 8
ory buffer with capacity for N samples (or N words if one sample is taken to occupy a word). The max
IB2 The Cohesion of Battle and Diffusion of Power Comes from the Clash of the Characters Placed Dia
img35 H-P softening? • If we were associate probabiłity of łayer shift with hardness of a materiał,

więcej podobnych podstron