6106C12 SHSpec-12 E-meter Actions, Errors in Auditing
The E-meter only reacts on those things that the PC is aware of or
capable of becoming responsible for. This responsibility factor becomes a
reality factor, so you can audit what appears on the meter. Things that don't
appear are beyond the PC's zone of responsibility. Getting new reads on sec
checks is thus a test of the PC's advance in responsibility. If no change,
there is some gross outness countering the auditing. Don't get trapped by all
the little minor errors. These gross efforts come from the impulse to make
nothing out of something, which goes back to productivity. The effort to
produce is one half of the dichotomy. All strikes are on the other half: the
effort not to produce. Many people are dedicated to non-production --
no-survival. This comes about as a reaction to a stuck flow on "Must Survive"
Many operations would go better if just left alone. Today's "planned balanced
economies", reminiscent of Markab, which specialized in this, generally result
in unbalanced messed up economics. Produce and Non-Produce should be on the
Secondary Prehav scale. The goal could also be "No Results".
Here we are talking about continually recurring gross errors, not just
occasional errors. Anyone will do that. Don't attempt total perfection or
you'll never complete or accomplish anything. People get so tense about doing
it right that they'll never get anything done. A good exercise to cure
perfectionism is to deliberately decide something is finished without the
finishing touches. When you can do perfect TR's, metering, etc., you can
relax and just audit with no anxiety communicating to the PC. You must exude
confidence in order to give people hope, which is a fundamental necessity to
making someone well or better. Mainly, it has to appear that you are trying
to do something for the PC, not that you are trying to be perfect.
Using instant reads, one gets at all the held down fives in the bank;
using latent reads, one is handling all the PC's concerns about why the fives
were held down. This is a longer road to clear.
Wyszukiwarka
Podobne podstrony:
SHSpec 025 6107C05 Q and A Period Procedures in AuditingSHSpec 290 6307C25 Comm Cycle in AuditingSHSpec 015 6106C19 Q and A Period Auditing SlowdownsSHSpec 051 6109C07 Reality in AuditingSHSpec 057 6109C21 Smoothness in AuditingSHSpec 05 6402C06 Comm Cycle in AuditingSHSpec 014 6106C14 Seminar WithholdsSHSpec 71 6607C26 The Classification Chart and AuditingSHSpec 164 6206C26 E Meter QualitySHSpec 20 6405C19 The PC and Getting Auditing to workSHSpec 015X 6106C15 Not KnowSHSpec 016X 6106C16 Confront and HavingnessHubbard, L Ron (Scientology) Errors in Time tapeSHSpec 003 6105C19 E meterSHSpec 086 6111C29 E meter TipsSHSpec 170 6207C17 E Meter Reads and ARC BreaksSHSpec 170 6207C17 E Meter Reads and ARC BreaksSHSpec 242 6302C21 R2 and R3 Current Auditing RundownSHSpec 013 6106C13 Seminar Q and A Periodwięcej podobnych podstron