G82 Counter Boring Cycle

{\rtf1\ansi\deff0{\fonttbl{\f0\fnil MS Sans Serif;}}
{\colortbl ;\red255\green0\blue0;}
\viewkind4\uc1\pard\qc\cf1\lang2057\b\f0\fs24 G82 Counter Boring Cycle\cf0\b0\fs16
\par \pard
\par \fs20 Sequence of moves:
\par Op 1) Rapid position to X, Y and Z (the initial level).
\par Op 2) Rapid traverse to R point level.
\par Op 3) Feed to Z depth.
\par Op 4) Dwell P (time for spindle stop and start CCW direction).
\par Op 5) Feed to R point level.
\par Op 6) Dwell P (time for spindle stop and start CW direction).
\par
\par If the G98 code is programmed within the cycle, the next move will be a rapid traverse to the Initial level. If the G99 code is programmed within the cycle, there will be no movement.
\par
\par K.... is defined as the number of repeats, for a series of holes. When not specified, K=1.\fs16
\par }

Wyszukiwarka

Podobne podstrony:
G82 Counter Boring Cycle
G85 Boring Cycle
G89 Boring Cycle
G89 Boring Cycle
G74 Counter Tapping Cycle
G74 Counter Tapping Cycle
CYCLE82 Drilling Counter Boring
circuit counter
x 087 2 accounting zeroing counter
G86 Grooving Cycle
G88 Chip Cutting Drill Cycle with Redraw
counter binary+it summary
68 be bytopic counteroffers1
counter stats
G94 End Taper Face Turning Cycle
White Collar S02E13 Countermeasures HDTV XviD FQM 2
Cell Cycle

więcej podobnych podstron