9a o. 1
8
11 o, o
Key 1 |
Subsoil |
6 |
Geotextile T |
11 |
End connection with ventilation and |
2 |
Geotextile B or |
7 |
Backfill |
access | |
mesh, when required |
8 |
Distribution chamber |
U |
Distribution layer length 4 m to 30 m | |
3 |
Sand |
9a |
Connection pipę, pre ssure |
O, |
Overlap on the side, upwards, > 0,2 m |
4 |
Distribution layer |
9b |
Connection pipę, gravity |
o2 |
Overlap two sheets, > 0,2 m |
5 |
Infiltration pipę |
10 |
Pumping chamber with pump |