suzuki rm25009

suzuki rm25009



COOLING SYSTEM 10-7

• Install the dowel pins © and new gasket (D.

_CAUTION_

Use a new gasket to prevent engine coolant leakage.

• Tighten the crankcase cover bolts to the specified torque. H Crankcase cover bolt: 11 N m (1.1 kgf-m, 8.0 Ib-ft)

INSPECTION AFTER REASSEMBLY

After reinstalling the water pump, inspect the followings.

•    Transmission oil level (d/“2-9)

•    Engine coolant level (d/=2-11)




Wyszukiwarka

Podobne podstrony:
89 TransAlp Manual Cylinder Piston 6 CYLINDER/PISTONCYLINDER INSTALLATION Install the dowel pins an
Suzuki RM2509 COOLING SYSTEM 10-7 ♦ Install łhe dowel pins (D and new gasket _CAUTION_ Use a new ga
44367 Suzuki RM2505 COOLING SYSTEM 10-3COOLING CIRCUIT INSPECTIONCOOLING CIRCUIT Before removing th
suzuki rm25007 COOLING SYSTEM 10-5IMPELLER AND GEAR SHAFT • Inspect the impeller and gear shaft for
73666 Suzuki RM2507 COOLING SYSTEM 10-5IMPELLER AND GEAR SHAFT * Inspect the impeller and gear shaf
suzuki rm25005 COOLING SYSTEM 10-3 COOLING SYSTEM 10-3 u/ićtibn with a radiator cap pres-COOLING CI
89 TransAlp Manual Alternator Starter 8 6 ALTERNATOR/STARTER CLUTCHLEFT CRANKCASE COVER INSTALLATION
suzuki rm25099 ELECTRICAL SYSTEM 17-3 Measure the ignition system peak voltage in the following pro
Suzuki RM2509 ELECTRICAL SYSTEM 17-3 Measure the ignition system peak voltage in the following proc
89 TransAlp Manual General Specifications Lubrication 2 9 LUBRICATIONOIL PUMP INSTALLATION Install t
46902 Suzuki RM2506 10-4 COOLING SYSTEMWATER PUMP •    Drain the engine coolant. (CZ
suzuki rm25006 10-4 COOLING SYSTEMWATER PUMP •    Drain the engine coolant. (d7“ 2-1
67687 Suzuki RM2502 FUEL SYSTEM 9-15REMOVAL AND REMOUNTING *    Remove the carbureto

więcej podobnych podstron