72023 Suzuki RM1257

72023 Suzuki RM1257



GEARSHIFTING 9-5

REASSEMBLY

• Reassemble the washer CD and gearshift cam stopper (§). Hook the spring © to the projection ®.


Align the pin groove ® with the pin © when installing the stopper piąte


♦ Tighten the gearshift cam bolt ®.    -

H Gearshift cam bolt: 24 N-m (2.4 kgf-m, 17.5 Ib-ft) S

.    • V. \    %


f /


\    \    \ X

* > xV:


ł \y' I


*

V...-


\ .    

■•n    \    ;

i

* /

/


V v •• v\ \ V

'y    •    • V *

\    \\ \i \\    \ V'

\ w •    \ \

V-


* Fit the springs pins ® and pawls ® to the gearshift cam driven gear ®. Wider side ® of pawi should be positioned outside.




Wyszukiwarka

Podobne podstrony:
87347 Suzuki RM1252 8-6 KICK STARTER •    Reassemble the rear brake pedał. (£7° 15-1
Suzuki RM1258 9-6 GEARSHIFTING • With the pawls held in pushed position, install the pawi lifter •
Suzuki RM1255 GEARSHIFTING 9-3GEARSHIFT LINKAGEREMOVAL ♦    Drain transmission oil.
73228 Suzuki RM125# 2-8 PERIODIC MAINTENANCE • Install the air cleaner box lid properly as shown. NO
suziki rm12502 8-6 KICK STARTER •    Reassemble the rear brake pedał. ((^/“IS-IS) •
suziki rm12506 9-4 GEARSHIFTING Remove the spring ®. Remove the gearshift cam stopper • Remove the
57577 Suzuki RM125 7 A WARNINGA WARNING Servicing the machinę with engine running can be hazardous.
Suzuki RM125 1-4 GENERAL INSTRUCTIONSOPERATING INSTRUCTIONSSTARTING THE ENGINE Inspect the transmis
Suzuki RM125 5 SERIAL NUMBER LOCATION The frame number CD is stamped on the steering head as shown i
86489 Suzuki RM1254 EsSH Iw—rm ESH 15-12 FRONT AND REAR BRAKES • Remove the brake lever adjuster re
25846 Suzuki RM1250 8-4 KICK STARTERINSPECTION • Inspect the oil seal © for oil leakage and oil sea

więcej podobnych podstron