RIKEN Accel. Próg. Rep. 24 (1990)

11-2. RILAC Operation

Y. Chiba, M. Hemmi, M. Yanokura, M. Kasę, E. Ikezawa, T. Aihara, 1

T. Ohki, 1 H. Hasebe, 1 T. Chiba, and Y. Miyazawa

This year, the PIG ion source, which had been used for many years, of RILAC was replaced with a new ECR ion source. For the replacement, reg-ular RILAC operation was discontinued by the end of July. The remaining period of the year was devoted to the modification of the injector high voltage station and the installation of the ECR ion source on it. Tables 1 to 3 show the operation statistics for the calendar year 1990. The “overhaul and improvement” in Table 1 includes the ion source renewal. During regular operation, there arose no serious trouble except carelesslv mistak-ing 66Zn5+ ions for 64Zn5+ ions gave a loss in beam time to RIKEN Ring Cyclotron.

Table 1. Statistics of the operation for Jan. 1 - Dec. 31, 1990.

Day

%

Beam time

123

33.7

Freąuency change

6

1.6

Overhaul and improvement

95

26.0

Periodic inspection and repair

21

5.8

Machinę trouble

0

0.0

Scheduled shut down

120

32.9

Total

365

100

Table 2. Beam time for individual research

groups.

Day

%

Atomie physics

33

26.8

Solid-state physics

21

17.1

Nuclear chemistry

24

19.5

Radiation chemistry

7

5.7

Accelerator research

4

3.3

Beam transportation to RRC

34

27.6

Total

123

100

Table 3. List of ions used in this year.

Ion

Mass

Charge State

Day

N

14

2

3

Ne

20

2

7

Al

27

3

4

Si

28

3

5

Ar

40

3

19

Ar

40

4

45

Ti

48

3

8

Cr

52

5

2

Cu

63

4

9

Zn

64

3

1

Zn

64

5

6

Kr

84

5

5

Kr

84

8

2

Xe

132

6

5

Xe

132

9

2

The newly instałled ECR ion source, called NEOMAFIOS, developed and manufactured by C.E.N.-G., France, arrived at our facilities in Feb-ruary 1990. Performance tests15 and operation training for the new ion source were repeated on a test bench until the end of July. August through the middle of November, we successively carried out the removal of the old PIG ion source system from the injector high voltage station, the installation of the ECR ion source system, and the prepa-ration of peripheral eąuipments. Most of the instru-ments on the station were replaced with new ones designed for the ECR ion source system.

Adjustment of the ECR ion source combined with beam transport in the injector system was started in the middle of November and acceleration test of RILAC using an 40Ar8+ beam in the end.

Beam acceleration will be reopened for users in the middle of January 1991.

References

1) E. Ikezawa et at.: This Report, p. 133.

1

Sumijyu Accelerator Service, Ltd.



Wyszukiwarka

Podobne podstrony:
11 RIKEN Accel. Próg. Rep. 24 (1990)111-1-2. Three a Disintegration of 12C in the Field of208Pb Nucl
92 RIKEN Accel. Próg. Rep. 24 (1990)111-5. Instrumentation1. Design of a Microbeamline for a Compact
94 RIKEN Accel. Próg. Rep. 24 (1990)111-5-2. Design of a Decay Muon Channel Using an Axially Symmetr
102 RIKEN Accel Próg. Rep. 24 (1990)111-5-8. Performance of Isotopic Separation in RIPS T.Nakamura,
103 RIKEN Accel. Próg. Rep. 24 (1990)111-5-9. Test Experiment of the GARIS/IGISOL K. Morita, T. Nomu
105 RIKEN Accel. Próg. Rep. 24 (1990)111-5-10. Velocity Distribution of IGISOL lon Beams M. Koizumi,
108 RIKEN Accel. Próg. Rep. 24 (1990)111-5-12. Status Report of the RIKEN Swinger-Magnetic Analyzer
110 RIKEN Accel. Próg. Rep. 24 (1990)111-5-14. Test for Dispersive-Mode Beam Transportto the SMART
116 RIKEN Accel. Próg. Rep. 24 (1990)111-5-19. Responses of Large Position-Sensitive Detectorsto Hea
121 RIKEN Accel. Próg. Rep. 24 (1990)IM-5-23. A Test for SMART Neutron Detectors H. Orihara, K. Hata
RIKEN Accel. Próg. Rep. 24 (1990)111-5-25. High Speed Serial Data Link for PC-9801 J. Fujita > PC
129 RIKEN Accel. Próg. Rep. 24 (1990)IV-2. Cross Section Data for 68Ge ProductionY. Tendow, A. Hashi
132 RIKEN Accel. Próg. Rep. 24 (1990)IV-5. Cross Sections Calculated by an ALICE Codęin the A = 50 —
133 RIKEN Accel. Próg. Rep. 24 (1990)V. DEVELOPMENT OF ACCELERATOR FACILITIES1. lon Accelerator Deve
138 RIKEN Accel. Próg. Rep. 24 (1990)V-l-4. RIKEN (Japan)-RAL (U.K.) Collaboration on Muon Science R
158 RIKEN Accel. Próg. Rep. 24 (1990)V-2-ll. Bump Magnet of SPring-8 H. Miyade, H. Takebe, and S. Mo
160 RIKEN Accel. Próg. Rep. 24 (1990)V-2-12. Measurement of a 508 MHz Model Coupler forthe SPring-8

więcej podobnych podstron