372596207

372596207



209

RIKEN Accel. Próg. Rep. 24 (1990)

VI-3. Leakage Radiation Measurements in the Ring Cyclotron Facility

S. Fujita, N. Nakanishi, T. Shikata, K. Ikegami, T. Takagi, S. Okamoto,

I. Sakamoto, T. Inamura, and H. Kamitsubo

The radiation safety control system has work-

Table 1. Dose rates of neutron leakage radiation from a target point A in extended experimental vault E5 (see Figs. 1-a,b).

Measured

point

Dose rates (u Sv/h)

Measured

point

Dose rates (m Sv/h)

a

0.56

S

0.002

b

0.34

h

0.006

c

0.033

i

125

d

0.002

3

14

e

0.010

k

0.125

f

1.80

Table 2. Dose rates of neutron leakage radiation from a

target point B in the beam distribution corridor. (see Figs.l- a,b,c.) A letter “A” stands for the neutron dose ratę meter of 2202D Studsvik No.83064; “B” for 2202D of Studsvik No.89006; “C” for 2202D of Studsvik No. 86032; and “D” for NSN1001 of Fuji electric.

Measured

point

Doicclo r n ame

Coun l rates (C/3rain)

Dose rates (#Sv/h)

( 1 )

11

0

0

( 2 )

A

0

0

( 3 )

c;

2

0. 03

( 4 )

c

17

0. 22

( 5 )

c

89

1.15

( 6 )

11

1 84

3. 1 0

( 7 )

A

38

0.64

( 8 )

c:

4

0. 05

( 9 )

11

2

0. 03

(10)

11

0

0

(11)

c;

0

0

(12)

n

0

0

(13)

c

0

0

(14)

11

0

0

(15)

A

0

0

(16)

C

3

0. 04

(17)

O

42

0. 54

(18)

c

6

0. 08

(19)

c

34

0. 44

(20)

B

9

0.15

(21)

15

5

0. 08

(22)

11

22

0. 37

(23)

B

1 1 0

1.85

(24)

11

6

0. 1 0

(25)

11

82

1. 38

(26)

c:

15

0. 1 9

(27)

11

0

0

(28)

B

0

0

(29)

1)

0. 002

(30)

1)

-

0. 002

(31)

I)

0. 020

(.32)

1)

0.0 18

(33)

1)

0. 029

(34)

1)

-

0. 006

(35)

n

0. 055

(36)

D

-

0. 040

(37)

1)

-

0. 029

(38)

1)

-

0. 059

(39)

1)

0. 0 30

(40)

I)

-

0. 006

(c)

Fig. 1. Layout of RIKEN Ring Cyclotron facility as of 1990. a : Plan view of basement 2th floor; b : Plan view of basement lth floor; c : Plan view of first floor. Leakage radiation doses measuring points are denoted by alphabets and the number in the parentheses.



Wyszukiwarka

Podobne podstrony:
207 RIKEN Accel. Próg. Rep. 24 (1990)VI-2. Residual Activities in the Ring Cyclotron FacilityS. Fuji
108 RIKEN Accel. Próg. Rep. 24 (1990)111-5-12. Status Report of the RIKEN Swinger-Magnetic Analyzer
74 RIKEN Accel. Próg. Rep. 24 (1990)111*3-10. A Multitracer Study of the Adsorption of Metal Element
109 R1KEN Accel Próg. Rep. 24 (1990)IH-5-13. Field Measurements of the SMART Magnets Y. Tajima, K. H
92 RIKEN Accel. Próg. Rep. 24 (1990)111-5. Instrumentation1. Design of a Microbeamline for a Compact
94 RIKEN Accel. Próg. Rep. 24 (1990)111-5-2. Design of a Decay Muon Channel Using an Axially Symmetr
102 RIKEN Accel Próg. Rep. 24 (1990)111-5-8. Performance of Isotopic Separation in RIPS T.Nakamura,
103 RIKEN Accel. Próg. Rep. 24 (1990)111-5-9. Test Experiment of the GARIS/IGISOL K. Morita, T. Nomu
105 RIKEN Accel. Próg. Rep. 24 (1990)111-5-10. Velocity Distribution of IGISOL lon Beams M. Koizumi,
110 RIKEN Accel. Próg. Rep. 24 (1990)111-5-14. Test for Dispersive-Mode Beam Transportto the SMART
116 RIKEN Accel. Próg. Rep. 24 (1990)111-5-19. Responses of Large Position-Sensitive Detectorsto Hea
121 RIKEN Accel. Próg. Rep. 24 (1990)IM-5-23. A Test for SMART Neutron Detectors H. Orihara, K. Hata
RIKEN Accel. Próg. Rep. 24 (1990)111-5-25. High Speed Serial Data Link for PC-9801 J. Fujita > PC
129 RIKEN Accel. Próg. Rep. 24 (1990)IV-2. Cross Section Data for 68Ge ProductionY. Tendow, A. Hashi

więcej podobnych podstron