5°
5°
CL
9
To sealing tank G1/2"
CL
in hydraulic equipments
(drawing no. P000830-A)
13
697 Nm
4
9
Bracket (drawing no. P000799-A)
Mounting of lubrication unit (1 : 5)
All units
APP
Pl
ot
d
at
e:
8.
4.
2008
A1
General tolerance
ISO 2768-mL
EN ISO 13920-BF
Scale
Weight (kg)
Date
Drawn
Check. Appr.
NB
Yard
Project
Product
Mark, Size, Type
Original reference
Old
New
Item code
Drawing No.
Rev.
Lang.
Sheet
1/2
Eng
CREATOR
REV DATE
part or whole without written permission is prohiblited.
1
2
3
4
5
6
7
8
9
10
11
L
K
J
M
N
P
Q
L
K
J
M
N
P
Q
R
12
11
10
9
8
7
6
5
4
3
2
1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
property of Steerprop Ltd. any reproduction or disclosure in
The information contained in this document is the sole
REVISION NOTE
REV
S P - A 1 P
SP 20 D
General arrangement
2008-01-18
TEKO
A
P000975
W0065
004509
MAMA
MAMA
1:25
ITEM
CODE
VER DESCRIPTION
TECHNICAL DATA
DRAWING
REV
QTY
LENGTH WIDTH
1
004114 0
Lower assembly
General arrangement
P000724 A
3
2
004121 0
Slewing assembly
General arrangement
M003955 A
2
3
004116 0
Stem tube assembly
General arrangement
P000726 A
1
4
004028 3
Upper assembly
General arrangement
P000729 D
2
5
004029 2
Upper assembly
General arrangement
P000720 C
1
6
003895 0
Propeller
General arrangement
3
7
004141 0
Corrosion protection
General arrangement
P000748 A
3
8
002499 3
Sealing tank
General arrangement
H000123 D
3
9
004325 2
Hydraulic equipments
General arrangement
P000830 C
1
10
004159 0
Flange
Upper assembly
M004014 A
3
11
001838 0
Hexagon head screw
DIN 931 - M30x180 - 8.8 Zn
128
12
001795 0
Hexagon nut
DIN 934 - M30 - 8 Zn
128
13
001343 0
Hexagon nut
DIN 934 - M24 - 8 Zn
6
14
004108 0
O-ring
1432 x 10,00 NBR 70 Shore (Vulkanoitu)
1
15
004109 0
O-ring
1682 x 10,00 NBR 70 Shore (Vulkanoitu)
2
- Center No. 139
Total gear ratio i ≈ 3,405
- Starboard No. 140
- Rotational speed: 1040 rpm
- Output power: 1685 kW
Prime Mover data:
Propeller unit serial numbers:
- Port No. 138
Locking of screws according to
instruction M000416.
20x2 min. (Shipyard delivery)
Pipeline continuously sloping.
PB-unit shown. SB-unit similar.
BL
10
FR88
1
7
6
8
in the propulsor room.
to height difference of DWL and sealing tank.
Overpressure is adjusted according
Mounting as high as possible
G3/4"
2
4
Pull up 4,2...4,4 mm
Pressure air supply
Note
in this project
planetary gear lubrication oil return.
15
1422 Nm
Mounting of PB-unit and SB-unit (1 : 5)
11
12
2
9
To sealing tank G1/2"
BL
FR87
20x2 min. (Shipyard delivery)
Pipeline continuously sloping
10
5
3
8
to height difference of DWL and sealing tank.
in the propulsor room.
Pressure air supply
Overpressure is adjusted according
Mounting as high as possible
Pull up 4,2...4,4 mm
G3/4"
7
1
6
CL-unit
12
1422 Nm
Mounting of CL-unit (1 : 5)
14
11
3
All units
Rotation directions
Propeller shaft rotation
direction clockwise
looking from aft
3,5
3,5
CL
BL
Pl
ot
d
at
e:
8.
4.
2008
A1
General tolerance
ISO 2768-mL
EN ISO 13920-BF
Scale
Weight (kg)
Date
Drawn
Check. Appr.
NB
Yard
Project
Product
Mark, Size, Type
Original reference
Old
New
Item code
Drawing No.
Rev.
Lang.
Sheet
2/2
Eng
The information contained in this document is the sole
property of Steerprop Ltd. any reproduction or disclosure in
part or whole without written permission is prohiblited.
1
2
3
4
5
6
7
8
9
10
11
L
K
J
M
N
P
Q
L
K
J
M
N
P
Q
R
12
11
10
9
8
7
6
5
4
3
2
1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
P000975
A
TEKO
2008-01-18
General arrangement
SP 20 D
S P - A 1 P
1:25
MAMAMAMA
004509
W0065
REV
REVISION NOTE
REV DATE
CREATOR
APP